  754   Tue Jun 17 12:14:30 2025 EW, CB, AGRun 93- Background with beam 150keVRun 93- New run at 150keV, background with
beam

13:15 All checks ok
 Screenshot_from_2025-06-17_13-16-52.pngScreenshot_from_2025-06-17_13-16-49.pngScreenshot_from_2025-06-17_13-16-45.pngScreenshot_from_2025-06-17_13-16-43.png 
  761   Wed Jul 9 11:21:14 2025 EW, CBCARME restarted - long background R98---9 July---

11:00

Turned detectors on - all stable
 32x 
  753   Tue Jun 17 08:04:09 2025 EW, AG, CBRun 92- Background with beam 90keVRun 92- started at 09:00, background with
beam

Same settings as run 91
 Screenshot_from_2025-06-17_09-03-43.pngScreenshot_from_2025-06-17_09-03-38.pngScreenshot_from_2025-06-17_09-03-34.pngScreenshot_from_2025-06-17_09-03-29.png 
  712   Mon Jun 2 16:35:35 2025 EW, AGRun 42 and scraper tests17:00

Scraper tests conducted. We tried
moving in the scrapers both at a fixed position
 Screenshot_from_2025-06-02_17-44-07.pngScreenshot_from_2025-06-02_17-44-50.png 
  691   Mon May 26 08:56:56 2025 EM,LBRun20Run 20 running

We start a new run since the laser
guys will do some measurements.
 8x 
  636   Sat Jun 15 06:10:21 2024 EM, PMHRun 747:00

Cooler voltage setpoint 247.4 V.

 
 6x 
  728   Sun Jun 8 11:55:00 2025 EM, PC, JM, CB, EW, AY, CB, PJW, YuLRun 58,59,60, 6112:52 

Started Run 58 - Beam energy
200 keV/u.
 50x 
  726   Sun Jun 8 09:07:22 2025 EM, PC, JMRun56NOTE: RunR55 is missing

Run56: Background run with 250
keV/u. Target off using the usual procedure.
 Screenshot_from_2025-06-08_10-10-06.pngScreenshot_from_2025-06-08_10-15-01.png 
  727   Sun Jun 8 10:05:30 2025 EM, PC, JMRun5711:06

Run during beam change. We will
go down to 200 keV/u
  
  200   Wed Feb 16 15:27:53 2022 EM, JMRun 41 Pulser tests16:30

NOTE: Pulser is ON!

Check Leakage current: (see attachment
 11x 
  700   Wed May 28 16:40:48 2025 EH, SN, LB, OF, EBM, CBRun 28/29/30 - 1.88 MeV/AWe start a new run with real data taking
condititon: beam is ok, target density is
1e12 cm-2, detectors are moving in-out periodically.
 37x 
  532   Mon Feb 19 21:46:32 2024 EH, EM, CBRun 45 + end of late shift22:54
We have moved the gas jet target out (y=4000),
the density has dropped to zero.
 14x 
  612   Mon Jun 10 14:26:52 2024 EH, AKRun 5815:30

Merger OK, Tape server OK

ADC data item statistics OK
 8x 
  759   Sat Jul 5 08:51:33 2025 EBManydesk connection settings   anydesk_settings.png 
  240   Tue Feb 22 18:23:02 2022 David. YuryVacuum problemAt 19:10 the vacuum has increased suddenly
everywhere in the ring, roughly a factor
1.5.
  
  237   Tue Feb 22 14:32:04 2022 David, YuryCurrent statusMerger, Tape server (WS3) checks:
DONE, writing ~1 MB/s, refreshing
is fine
 12x 
  238   Tue Feb 22 16:09:08 2022 David, YuryCurrent statusMerger, Tape server (WS3) checks:
DONE, writing ~1 1273kB/s, refreshing
is fine
 12x 
  242   Tue Feb 22 19:28:35 2022 David, YurivacuumAt 19:10 Frank called us that vacuum in
sections 08 and 10 got worse by about 1.5
times. There is a possible danger that vacuum
  
  243   Tue Feb 22 20:08:40 2022 David, YuriCurrent statusRecently the pressure started to raise
a bit, we have increased the temperature
from 129.1 K to 129.2 K. Current pressure
 2022-02-22_21-14-23exrate.png2022-02-22_21-14-01xytotal.png2022-02-22_21-13-11extotal.png 
  244   Tue Feb 22 21:09:39 2022 David, YuriCurrent statusPressure seems as before 19:10.

Merger, Tape server (WS3)
checks: DONE, writing ~1 MB/s, refreshing
 2022-02-22_22-12-55xytotal.png2022-02-22_22-12-21exrate.png2022-02-22_22-12-00extotal.png 