AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  CARME, Page 2 of 38  ELOG logo
Entry  Mon Jun 16 08:17:41 2025, JG, D2 consumption 
The current bottle of D2 was installed on friday 06.06. at around 12:00. I assume we started at 200 bar.

Right now we have 50 bar remaining in this bottle (16.06. at 8:00).

This is an average consumption of ~15 bar/day
Entry  Sun Jun 15 10:46:35 2025, EW, EM, AR, AB, CB, JG, AK, Run 81 30x
11:45 New run started - run 81, same settings as previous runs (75, 76 etc)

ROOT histograms NOT zeroed

Beam at 2.5e8, target density at 3e12
Entry  Sun Jun 15 07:01:37 2025, EW, EM, Run 80 Screenshot_from_2025-06-15_08-09-05.pngScreenshot_from_2025-06-15_08-09-00.pngScreenshot_from_2025-06-15_08-08-05.pngScreenshot_from_2025-06-15_08-07-56.pngScreenshot_from_2025-06-15_09-55-36.png
08:00 New run started - run 80

Run whilst they are optimising the beam after losing it, everything else same as previous runs

ROOT histograms NOT zeroed
Entry  Fri Jun 13 19:41:32 2025, JG, SHB, JM, AR, EW, OF, Run 77, 78, 79 17x
New run started - Run 77 after refilling LN2 dewar

Same settings as Run 75 & 76

The root histos have not been reset, i.e. they show combined statistics of run 75, 76 and 77.
Entry  Fri Jun 13 16:39:18 2025, JG, SHB, Run 76 7x
Same settings as run 75.

Detector 4 is biased at 100V and switched from MEC to LEC.

The root histos have not been reset, i.e. they show combined statistics of run 75 and 76.
Entry  Fri Jun 13 14:45:58 2025, JG, SS, JM, CB, EW, AR, Run 75 Screenshot_from_2025-06-13_16-01-44.png2025-06-13_15-59-53_YRT1_CRYRING_2025_D_Bruno_90keV.C1.txt
 

90 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam - @ -12.5mm

We do not expect to see see Rutherford due to energy loss in the dead layer, using other particle detector for normalsiation.
Entry  Thu Jun 12 15:33:17 2025, CB, JM, EM, JG, TD, AB, CF, AR, Run 74 27x
16:34

Like Run 73, but particle detector in YR10 now active, and recorded in MBS.

Clear effect of target on beam lifetime. Target off -> nearly no counts.
Entry  Thu Jun 12 14:22:27 2025, JM, CB, TD, CF, JG, EM, Run 73 Screenshot_from_2025-06-12_15-23-37.pngScreenshot_from_2025-06-12_15-23-51.pngScreenshot_from_2025-06-12_15-29-14.pngScreenshot_from_2025-06-12_15-31-19.png
15:00

Cave closed, waiting for beam to come back.

Reset all ASIC settings to those in elog 737
Entry  Thu Jun 12 14:08:42 2025, JM, CB, Run 72 - pulser walkthrough Screenshot_from_2025-06-12_15-33-03.png
Pulser walkthrough conducted while the cave was open.

Pulser amplitudes 90000, 80000, 70000, 60000, 50000, 40000, 30000, 20000, 10000

DSSD4 was set to MEC and bias off as the detector had previously tripped.
Entry  Thu Jun 12 06:20:50 2025, JM, Run 68,69 - background Screenshot_from_2025-06-12_07-01-00.pngScreenshot_from_2025-06-12_07-20-26.png
07:20

Started a background run while the cave is open.

All ASIC settings remain unchanged, we just have no beam.
Entry  Wed Jun 11 10:13:42 2025, EW, CB, PJW, AR, JM, Run 67 14x
As run 66, optimisation of beam completed

DSSD4 now working and thresholds to 0x30 (480keV), switched to LEC

Tape service at 1.7MB/s
Entry  Wed Jun 11 09:16:55 2025, CB, ASIC Control Settings 17x
11 June 10:18

2025Apr08-13.45.30 settings

DSSD4 not working as of the screenshots (MEC + High Threshold)
Entry  Wed Jun 11 08:37:48 2025, CB, PJW, Run 66 Screenshot_from_2025-06-11_10-21-30.pngScreenshot_from_2025-06-11_10-21-44.png
09:38

As Run 65, no changes, CRYRING operators attempting to improve beam intensity.

We should be able to keep running while they do, but there is a chance of some missed injections or other oddities.
Entry  Tue Jun 10 22:38:59 2025, JM, CB, PJW, Run 65 7x
23:40

Offline anlaysis shows two clear peaks for DSSD1 and 2 at very low energies close to the threshold. One must be elastics and the other a noise
peak.
Entry  Tue Jun 10 16:46:39 2025, JM, CB, EW, AY, PC, 150 keV - Run64 42x
Run 64 started.

150 keV/u beam on target, Target overlap confirmed with lifetime measurement using bunched beam.

We do not see Rutherford on the detector - perhaps this is a calibration issue - perhaps too much noise at threshold.
Entry  Tue Jun 10 13:29:23 2025, EW, CB, JM, Thresholds changed  Screenshot_from_2025-06-10_14-35-07.pngScreenshot_from_2025-06-10_14-34-59.pngScreenshot_from_2025-06-10_14-34-49.pngScreenshot_from_2025-06-10_14-34-17.png
Experimented with slow comparator thresholds as we go down to lower beam energies

Checked deadlayer loses with SRIM, expected ruthford energies are as follows:

150keV/u -> 230keV
Entry  Tue Jun 10 09:57:50 2025, CB, JM, PJW, YuL, JG, Run 62 
10:58

As Run 61, no target for background.

200 keV/A
Entry  Tue Jun 10 09:44:33 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)

This means, no detector and target timing is available for this period.

The reason is that the rfio server was running on atppc025, which crashed at that time.
Entry  Tue Jun 10 09:44:30 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
Entry  Tue Jun 10 09:44:20 2025, JG, MBS not running for a week 
The MBS daq was not writing data since June 2. 22:39 (run_0035.lmd)
The reason is that the rfio server was running on atppc025 which crashed at that time.

We
resumed running MBS now at 10.06. ca. 10:35. (run_0036.lmd).
ELOG V3.1.3-7933898