  ID Date Authordown Subject Text Attachments
  465   Sat Jan 13 14:25:05 2024 CB, JMBias tests with all FEEs connectedConnected all FEEs.

The two top fees corresponding
to the bottom right detector are connected
 Screenshot_2024-01-13_15-24-40.png20240113_150158.jpg 
  466   Sat Jan 13 14:32:21 2024 CB, JMLeaky manifold and cable managementFound two leaks in the welding of the manifolds,
marked them in tape. Manifold to be repaired
on Monday. Remember to re-install missing
 20240112_111838.jpg20240112_105936.jpg20240113_183019.jpg 
  496   Wed Feb 7 10:09:14 2024 CB, JG, EMMorning Shift 11:00

Changed slow comp threshold to
0x32 (500 keV). Checkloaded.
 Screenshot_from_2024-02-07_11-10-08.pngScreenshot_from_2024-02-07_11-10-59.pngScreenshot_from_2024-02-07_11-15-53.pngScreenshot_from_2024-02-07_11-20-38.png 
  566   Fri May 31 19:12:01 2024 CB, EMRun 13 - test with beam20:00

The beam is set at the correct
energy, operators cross-checked it again.
 Screenshot_from_2024-05-31_20-13-46.pngScreenshot_from_2024-05-31_20-27-58.pngScreenshot_from_2024-05-31_20-32-59.png 
  567   Fri May 31 21:03:21 2024 CB, EMRun1422:03

Before this run we checked quickly 
beam with the target on but it does not make
 Screenshot_from_2024-05-31_22-05-57.pngScreenshot_from_2024-05-31_22-07-01.pngScreenshot_from_2024-05-31_22-07-49.png 
  500   Thu Feb 8 17:11:50 2024 CB, EHPulser walkthrough
17:30 File G22-88/R8

Pulser walkthrough

EGG
Ortec 448 Pulser

Amplitide 90,000-10,000
@ 10,000 step
Normalise 5.0
Attenuators
 4.png3.png 
  257   Wed Feb 23 16:57:35 2022 CB, CNOptimising motor motionOptimised motor motion during run R58

Moved 2 mm in (20.3 potentiometer)

29.47 potentiometer
  
  722   Fri Jun 6 16:49:59 2025 CB, AY, STBeam overlap results for 200keV and 250keVFor 200keV the optimal horizontal position
is -5mm.
For 250keV the optimal horizontal
 2025_06_06_17_46_56_Greenshot.png 
  752   Mon Jun 16 22:06:00 2025 CB, AR, EWRUN 90-9123:00 DAQ restored and data now being written
okay. Checks all okay, see screenshots below.
Histograms reset. 40 bars in bottle @ 23:45
 14x 
  573   Sun Jun 2 06:41:00 2024 CB, AGRun 21 - tests07:41

Switching to bunched beam to check
D vs H content.
 10x 
  574   Sun Jun 2 08:47:01 2024 CB, AGRun 22 - longer rung with 20 min storage09:47

12 seconds pre acc

200x cycles
 Screenshot_from_2024-06-02_09-47-53.pngScreenshot_from_2024-06-02_09-48-06.pngScreenshot_from_2024-06-02_11-21-59.pngScreenshot_from_2024-06-02_11-22-27.pngScreenshot_from_2024-06-02_13-02-31.png 
  569   Sat Jun 1 07:16:15 2024 CB, AB, EM, JMRun 19 - beam target overlapMorning shift

08:16 - as run 18, target off

9:00 Increased storage time to
 19x 
  488   Sat Feb 3 00:13:03 2024 CB TDRun1 end - R3 start
01.07 DAQ continues file G22-88/R1_46
      background alpha
 50x 
  490   Sun Feb 4 08:40:04 2024 CB TDRun3 - contd09.30 DAQ continues file G22-88/R3_17

      DSSSD bias OK - attachment 1
 22x 
  491   Mon Feb 5 05:45:26 2024 CB TDRun3 - end06.40 DAQ continues file G22-88/R3_42

      DSSSD bias OK - attachment 1
 47x 
  492   Mon Feb 5 12:48:50 2024 CB TDPulser walkthough - Run4
13.41 DAQ start - file G22-88/R4
 Screenshot_from_2024-02-05_14-04-33.pngScreenshot_from_2024-02-05_14-05-16.png 
  53   Thu Sep 2 21:04:26 2021 CB RSS ML + DR OGGate valves mounted + pump downMounted both gate valves and support. Gate

valves could not be installed one bolt 
 6x 
  66   Fri Sep 10 10:50:55 2021 CB RSS MLPressure after overnight pump downPressure found in 10-7 mbar range.

Decided to leak test anyway for safety.
 20210910_101131.jpg 
  67   Fri Sep 10 18:09:14 2021 CB RSS MLLeak test + baking system testLeak tested CARME via He leak tester + He

bottle. No leaks could be found. Some 
  
  64   Wed Sep 8 17:03:07 2021 CB RSS + OG NBSix feedthrough flanges mountedContinued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
 23x 