Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation
|
Initial bakeout started which will run until friday, temperature had reached 44 degrees when I left the lab.
The bottom valve has now been installed on the main chamber |
Wed Aug 19 16:44:39 2020, JM, Neg Installs
|
Internal neg installs completed and electrically checked. |
Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment    
|
Using a digital multimeter confirmed continuity for SAES-supplied
power cable (Amphenol (circular) 6-pin plug to Han 05 plug) for
the following pins
pin A - pin 5
pin F - pin 3
which correspond to the type K chromel/alumel thermocouple contacts
and Neg PSU output connector pins for the thermocouple (e.g. see p.34
of Neg PSU manual). |
Tue Aug 18 11:26:26 2020, JM, Week ending Friday 14/08/20
|
Week ending friday 14/08/20
CARME chamber securely mounted upon aluminium frame and support skis. Neg-ion pumps and right angled flanges installed. Neg pumps installed in the wall detector section of the chamber. Neg pumps continuity checked and are electically isolated from the chamber. |
Mon Aug 17 08:16:16 2020, TD, CARME Elog
|
Test |