Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking
|
Baking halted on 23/9/21 16:16 as connection to TC08 module was lost. USB cable connection to TC08 module appears to have been damaged in shipment. USB
hub and cable replaced, connection re-established and baking restarted 17:27.
Ramping of baking limited to 40C by the maximum difference between parts of the chamber being too high, this safety feature prevents high thermal |
Mon Sep 28 13:04:27 2020, JM, Baking 
|
I have (fingers crossed) got the baking stepping up nicely now. I have used some of the outer shell to act as a shield and to direct airflow towards
the front and back of the baking volume. I also moved the RE-72 thermocouples to a higher temperature region and replaced the broken thermocouples. The
program is on automatic mode and has currently stepped up to 40C with the max diff reduced to ~4C. |
Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 
|
Bakeout test completed. Maximum temperature reached within baking volume was 120 degrees, with baking stopped by the program due to detection of
negative temperature gradients. Negative temperature gradients due to a couple of thermocouples becoming unsecured and moving to cooler part of baking
volume. Attached documents show temperatures of thermocouples. The colour of plots are linked (all of chamber temperatures are blue etc). Temperature |
Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation
|
Initial bakeout started which will run until friday, temperature had reached 44 degrees when I left the lab.
The bottom valve has now been installed on the main chamber |
Fri Sep 22 12:35:46 2023, JM, Bakeout plots   
|
Attached are plots for the previous bakeout of CARME which may aid in the bakeout to come in the following week.
Plots relate the heater temperatures and heater powers with the chamber temperature (internal floating thermocouple) and pressure inside CARME. |
Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber 
|
The Chamber has continued to pump overnight and we have reached a pressure of 3.3e-6 mbar as of 10:15. Power cable for the hot cathode gauge was found. Gauge
did not give a reading so pin connections were checked, all is okay so it may be thepressure is still too high within the chamber, gauge was thus turned
off. I have attached the RGA from this morning which has increased accuracy so has been cleared up for most of the noise from yesterday. I have begun |
Mon Aug 14 09:22:56 2023, JM, Bakeout    
|
14/08/23
Temperature in the baking volume is ~ 42 C and the pressure is 4.6e-8 mbar. Current heaters set point is 135 C. This will now be increased to
200 C to start increasing the baking temperature more significantly. |
Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
|
Summary: Target not running. Background runs written to disk, some with beam some without.
19:27 Data file R17 running
DSSSD positions out. Nikos will work on the target. |
Sat May 24 08:28:14 2025, TD, EM, Background runs R13-R16 29x
|
Summary: Target not running. Some background files written to disk, some with beam some without.
09.27 DAQ going
|
Wed Apr 23 11:08:34 2025, TD, JM, Background Run 11x
|
12.08 DSSSD bias & leakage current - attachments 1-2
CAEN logger program crashed sometime this am - now restarted
|
Sun Jul 6 11:35:28 2025, CB, Anydesk version updated
|
Updated anydesk to 6.3.2 CentOS7 release.
Works now. |
Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line
|
To log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de
To start anydesk |
Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14
|
Results of the fortran analyser programs for R54_14
No timewarps observed in the data
|
Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 
|
Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
|
Fri Feb 4 09:53:48 2022, JM, TD, OH (remotely), Alpha spectra overnight 8x
|
DAQ was left running last night from 19:30. Detector bias 80V with a leakage current ~3.4 uA. Pulser OFF.
Observed alphas in spectra overnightin the 20,000 to 28,000 channel range for the pn side and 36,000 to 44,000 range on the nn side of the detector.
Zero energy noise peak is at channel 32000. |
Mon Feb 21 08:05:45 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 09:07:37 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 10:59:48 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Mon Feb 21 12:10:47 2022, RSS, JG, Alpha background run50
|
Beam OFF. Run started 20/2/22 18:42
System checck OK, except white rabbit all fail
Temperatures OK |
Fri Feb 18 08:58:08 2022, RSS, ML, CB, Alpha background run46 11x
|
10:00
Check Leakage current: (see attachment 2) |