Entry  Fri Sep 24 08:47:36 2021, JM RSS CB(Remotely), Baking  
Baking halted on 23/9/21 16:16 as connection to TC08 module was lost. USB cable connection to TC08 module appears to have been damaged in shipment. USB
hub and cable replaced, connection re-established and baking restarted 17:27. 

Ramping of baking limited to 40C by the maximum difference between parts of the chamber being too high, this safety feature prevents high thermal
Entry  Mon Sep 28 13:04:27 2020, JM, Baking 20200928_081831.jpg20200928_130239.jpg
I have (fingers crossed) got the baking stepping up nicely now. I have used some of the outer shell to act as a shield and to direct airflow towards
the front and back of the baking volume. I also moved the RE-72 thermocouples to a higher temperature region and replaced the broken thermocouples. The
program is on automatic mode and has currently stepped up to 40C with the max diff reduced to ~4C.
Entry  Fri Sep 4 15:48:25 2020, JM, Bakeout test completed 191214004923_temperatures.txtBakeout1.png
Bakeout test completed. Maximum temperature reached within baking volume was 120 degrees, with baking stopped by the program due to detection of
negative temperature gradients. Negative temperature gradients due to a couple of thermocouples becoming unsecured and moving to cooler part of baking
volume. Attached documents show temperatures of thermocouples. The colour of plots are linked (all of chamber temperatures are blue etc). Temperature
Entry  Wed Sep 2 17:01:49 2020, JM, Bakeout started and valve installation Photos.zip
Initial bakeout started which will run until friday, temperature had reached 44 degrees when I left the lab. 

The bottom valve has now been installed on the main chamber
Entry  Fri Sep 22 12:35:46 2023, JM, Bakeout plots Heater-chamber-temps.pngpressure-chamber-temp.pngHeater-power-chamber-temp.pngHeater-power-temp.png
Attached are plots for the previous bakeout of CARME which may aid in the bakeout to come in the following week.  

Plots relate the heater temperatures and heater powers with the chamber temperature (internal floating thermocouple) and pressure inside CARME. 
Entry  Thu Sep 17 10:13:43 2020, JM, CB(remotely), Bakeout cooling and pumping of chamber Photos.zip20200917_1428_temp_last.png
The Chamber has continued to pump overnight and we have reached a pressure of 3.3e-6 mbar as of 10:15. Power cable for the hot cathode gauge was found. Gauge
did not give a reading so pin connections were checked, all is okay so it may be thepressure is still too high within the chamber, gauge was thus turned
off. I have attached the RGA from this morning which has increased accuracy so has been cleared up for most of the noise from yesterday. I have begun
Entry  Mon Aug 14 09:22:56 2023, JM, Bakeout 20230814_150430.jpg20230815_094400.jpgHeater-power.pngHeater-ITC-temp.pngPressure-ITC-temp.png
14/08/23

Temperature in the baking volume is ~ 42 C and the pressure is 4.6e-8 mbar. Current heaters set point is 135 C. This will now be increased to
200 C to start increasing the baking temperature more significantly.
Entry  Sat May 24 18:27:55 2025, EM, LC, Background runs continued R17-R19 36x
Summary: Target not running. Background runs written to disk, some with beam some without.

19:27 Data file R17  running

      DSSSD positions out. Nikos will work on the target.
Entry  Sat May 24 08:28:14 2025, TD, EM, Background runs R13-R16 29x
Summary: Target not running. Some background files written to disk, some with beam some without. 

09.27 DAQ going
Entry  Wed Apr 23 11:08:34 2025, TD, JM, Background Run 11x

12.08 DSSSD bias & leakage current - attachments 1-2
       CAEN logger program crashed sometime this am - now restarted
Entry  Sun Jul 6 11:35:28 2025, CB, Anydesk version updated 
Updated anydesk to 6.3.2 CentOS7 release.

Works now.
Entry  Tue Aug 9 16:07:33 2022, JM, TD, Anydesk setup command line 
To log into appc218 desktop:
same login and password as to carme@atppc022.gsi.de

To start anydesk
Entry  Tue Feb 22 09:10:48 2022, OH, Analysis of R54_14 R54_14_analyser.txt
Results of the fortran analyser programs for R54_14

No timewarps observed in the data
Entry  Mon Mar 10 15:47:27 2025, TD, Analysis data files G22-201 R79_10 & R79_24 R79_10.txtR79_24.txt

Analysis of data files G22-201 R79_10 and R79_24 - attachments 1-2
Entry  Fri Feb 4 09:53:48 2022, JM, TD, OH (remotely), Alpha spectra overnight 8x
DAQ was left running last night from 19:30. Detector bias 80V with a leakage current ~3.4 uA. Pulser OFF.

Observed alphas in spectra overnightin the 20,000 to 28,000 channel range for the pn side and 36,000 to 44,000 range on the nn side of the detector.
Zero energy noise peak is at channel 32000.
Entry  Mon Feb 21 08:05:45 2022, RSS, JG, Alpha background run50 
Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK
Entry  Mon Feb 21 09:07:37 2022, RSS, JG, Alpha background run50 
Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK
Entry  Mon Feb 21 10:59:48 2022, RSS, JG, Alpha background run50 
Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK
Entry  Mon Feb 21 12:10:47 2022, RSS, JG, Alpha background run50 220221_1506_aida03_1*W.png
Beam OFF. Run started 20/2/22 18:42

System checck OK, except white rabbit all fail

Temperatures OK
Entry  Fri Feb 18 08:58:08 2022, RSS, ML, CB, Alpha background run46 11x
10:00

 

Check Leakage current: (see attachment 2)