Entry  Tue Feb 22 00:32:35 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  2022-02-22_01-38-53-Ex-histogram.png2022-02-22_01-38-17-XYtotal.png
01:30

Beam ON ~6E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 02:02:11 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  10x
03:00

Beam ON ~7E6 pps

Target ON and open to the ring
Entry  Tue Feb 22 03:05:06 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  9x
04:00

Beam ON ~5.5E6 pps, but it fluctates between 2e6 and 6e6 (like a step function) in about each 5-10min

Target ON and open to the ring
Entry  Tue Feb 22 05:12:38 2022, JM, CB, LV, PM, AK, Beam ON, Target ON Run 54  11x
06:00

Beam ON ~1.5E6 pps, still fluctates between 1e6 and 6e6 (like a step function)

Target ON and open to the ring
Entry  Mon Feb 21 17:26:19 2022, JM, CB, SHB, OH (remotely), Beam ON run 53 9x
21/2/22 16:00

Call from main control room, beam is ON, probably has been for several hours judging by rate on xy total plot.

Changes made to online monitoring code by OH, include setting to only 1 DSSD, correct offsets from the pulser walkthrough, offline analysis capabilities
Entry  Sat Feb 19 20:08:43 2022, JM, CB, Beam ON run 49 6x
Run started 19/2/22 21:05. Beam ON

Temperatures OK

System wide checks OK - white rabbit fails on all.
Entry  Tue Mar 1 23:43:15 2022, David, George, Beam Intensity Drop 
00:38
Intensity in the ring dropped by 2 orders of magnitude to 5e5 on injection

Lost rutherford rate (as seen in last e-log post)
Entry  Mon Jun 10 07:40:47 2024, RSS, DB, Beam 
08:26: There is no beam and Gleb is informed.

08:46: Beam is back.
Entry  Mon Jan 10 20:52:53 2022, JM, TD, OH, Baking tent removed, VI tests 20220110_175547.jpg20220110_175811.jpgvi-curve.png
Baking tent, frame and trays fully removed from CARME chamber. Removal of baking frame required removing air lines from upper gate valve and repositioning
of vacuum hose connecting turbo pump to backing line and turbo power cable. Some difficulty encountered removing upper baking frame now the target support
frame is assembled. Small modification seperating section in two would aid future installation and disammebly. 
Entry  Fri Jul 21 08:21:54 2023, TD, RSS, Baking tent manual CARME-baking-guide_(1).pdf
09.20 Pirani 1.00e-3 mbar IE514 3.90e-8 mbar

      Today - install TCs, connect to Pico controller and test
Entry  Thu Aug 10 07:51:43 2023, JM, Baking tent and heater testing 8x
09/08/23

Attached is the current pumpdown plot taken from grafana. 

I have started to re-work the baking tent in order to close gaps from its initial installation. The heaters work and were tested to a temperature
Entry  Wed Sep 16 08:52:03 2020, CB (remotely), Baking status 16-17 September 20200916_0850_temps.png20200916_0850_ctrl.png20200916_1500_temps.png20200916_2022_temps.png20200917_0820_temps.png
16 September

08:50
Entry  Mon Sep 14 12:07:40 2020, JM, CB (remotely), Baking status 20200914_1207_temps.png20200914_1207_ctrl.png20200914_1727_temps.png20200914_2000_temps.png
Mon 14 Sep 09:50

Jordan moved the TC08 picolog 2 away from the chamber and built a makeshit heatshield. 
Entry  Fri Sep 18 10:28:57 2020, JM, CB(remotely), Baking status 20200918_1029_temps.png
10:28
Reducing temperature in steps. System cooling down. See attached.
Entry  Sat Sep 26 09:31:46 2020, JM, CB (both remotely), Baking over weekend temps.pngtemps2.pngHeaters.jpg20200927_1732_temps.png
Sat 26 Sep

09:15 Baking started automatic mode

13:30 Baking continues, heating is slower than expected due to high chamber bottom temperatures
Entry  Sun Sep 13 08:06:25 2020, CB (remotely), Baking over the weekend -2 20201309_0806_ctrl.png20201309_0806_plot.png
Sun 13 Sep 08:06

Baking reached 93 C yesterday afternoon at 16:18 and paused as a result of a percieved temperature gradient in
Entry  Sat Sep 12 08:38:52 2020, CB (remotely), Baking over the weekend 20200912_0839_ctrl.png20200912_0839_plot.png
Saturday 12 Sep 08:43

Remotely checked status of baking. See attached.
Entry  Tue Sep 15 08:39:26 2020, CB (remotely), JM, Baking and Chamber status  20200915_0842_ctrl.png20200915_0842_temp.png20200915_152708.jpgimage007.jpg20200915_1920_temps.png
Tuesday 15 September

08:40
Entry  Sun Sep 19 09:11:34 2021, CB (remotely), Baking RasPi status 
Accessed Pi remotely 

( 1. Without the Internet, the Pi has no way of knowing what time is it.
Entry  Mon Sep 27 17:53:35 2021, JM RSS , Baking Jacket upgrade + NEG controllers connected 20210927_151650.jpg20210927_151706.jpg20210927_151721.jpg20210927_170139.jpg
Additional baking jacket sections for the turbo section arrived today. Baking was halted at ~11:00 to allow for the chamber to cool to install new sections.
New sections installed and baking restarted at 15:25. Jacket fits much better with gaps near the turbos and the motors now covered much better. Attached
are some photos. 