AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 3 of 34  ELOG logo
ID Date Authordown Subject Text Attachments
  3   Tue Aug 18 17:35:20 2020 TDSAES UHV1400 pin assignmentUsing a digital multimeter confirmed continuity
for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug
 NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf 
  28   Thu Oct 22 10:39:40 2020 TDThursday 22 October
10.40
 19x 
  31   Wed Oct 28 10:41:57 2020 TDWednesday 28 October
10.32
 6x 
  35   Wed Nov 25 10:39:37 2020 TDWednesday 25 November
10.39
 7x 
  36   Fri Dec 4 16:49:36 2020 TDFriday 4 December   7x 
  56   Fri Sep 3 14:14:40 2021 TDLeybold IE514 manual & calibration data   20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf 
  119   Wed Oct 13 11:59:23 2021 TD[How to] Open COF600 copper wire seals
Use the M10 jacking points provided top/bottom
and 
 20211013_103806.jpg20211013_103800.jpg 
  121   Wed Oct 13 15:16:12 2021 TDOrientation of 2x 78 way D connector feedthroughs
Looking downstream
 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg 
  129   Fri Oct 22 13:11:26 2021 TDMSL type TTT14 assembly drawings & pin assignments   C-3434.pdfC-3517.pdf 
  130   Fri Oct 22 13:22:48 2021 TDCARME FEE64 adaptor PCB   10x 
  332   Mon Feb 28 14:38:15 2022 TDNewMerger statistics
Screenshots of all NewMerger statistics
 37x 
  386   Wed Mar 22 16:33:32 2023 TDNIM WR source
Test of NIM WR source at Edinburgh
 8x 
  400   Sun May 14 11:55:12 2023 TDSunday 14 May12.44 DSSSD#3 bias -149.95V leakage current
-6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
  
  401   Mon May 15 07:34:22 2023 TDMonday 15 May08.35 DSSSD#3 bias -149.95V leakage current
-6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php
)
  
  418   Thu Jul 13 08:46:44 2023 TDReplacing wire seal
09.30 CARME chamber status
 20230713_135351.jpg20230713_135416.jpg 
  419   Fri Jul 14 08:27:17 2023 TDCARME open - inspecting seal
09.20 CARME chamber at atmospheric pressure
as expected.
  
  420   Mon Jul 17 08:45:11 2023 TDClosing CARME again
Grosmantage are scheduled to arrive 10.00
to inspect COF600 seals and their fit to
 20230717_093106.jpg 
  421   Tue Jul 18 08:16:28 2023 TDPumping down. Issues found with one detector.09.15 Following overnight pumping of CARME
chamber by Leybold turbo
      Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
  
  422   Wed Jul 19 08:17:26 2023 TDLeak testing09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
      Leak tester c. 5e-12 mbar.l/s (leak
tester valved off)
  
  423   Thu Jul 20 08:29:26 2023 TDInstalling tent. Two NEG power cable broken.09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar

12.10 Bakeout tent frame installed
 11x 
ELOG V3.1.4-unknown