AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 3 of 38  ELOG logo
Entry  Wed Feb 23 20:06:43 2022, TD CN, E141 kinematics E141_kinematics.txt

Assuming DSSSD is 1000um thick we can expect to observe protons for E_lab=11MeV as follows
Entry  Fri Feb 9 11:58:04 2024, TD + CB, JM, AR, NH, AB, Run10 contd, Run11 27x

12.46 DAQ continues G22-88/R10_14
Entry  Mon Aug 17 08:16:16 2020, TD, CARME Elog 

Test
Entry  Tue Aug 18 17:35:20 2020, TD, SAES UHV1400 pin assignment NEG_POWER_user_manual.pdf20200813_121944_(1).jpg20200813_134548.jpgRFKIT9904220_(2).pdfRFKIT9905220_(2).pdf
Using a digital multimeter confirmed continuity for SAES-supplied 
power cable (Amphenol (circular) 6-pin plug to Han 05 plug) for
the following pins
Entry  Thu Oct 22 10:39:40 2020, TD, Thursday 22 October 19x

10.40
Entry  Wed Oct 28 10:41:57 2020, TD, Wednesday 28 October 6x

10.32
Entry  Wed Nov 25 10:39:37 2020, TD, Wednesday 25 November 7x

10.39
Entry  Fri Dec 4 16:49:36 2020, TD, Friday 4 December 7x
 
Entry  Fri Sep 3 14:14:40 2021, TD, Leybold IE514 manual & calibration data 20210903_141201.jpgIonivac_Sensors_IE414_IE514.pdf
 
Entry  Wed Oct 13 11:59:23 2021, TD, [How to] Open COF600 copper wire seals 20211013_103806.jpg20211013_103800.jpg

Use the M10 jacking points provided top/bottom and 
left/right on the upstream and downstream sides of the 
Entry  Wed Oct 13 15:16:12 2021, TD, Orientation of 2x 78 way D connector feedthroughs 20211013_152518.jpg20211013_152529.jpg20211013_152549.jpg20211013_152606.jpg

Looking downstream
Entry  Fri Oct 22 13:11:26 2021, TD, MSL type TTT14 assembly drawings & pin assignments C-3434.pdfC-3517.pdf
 
Entry  Fri Oct 22 13:22:48 2021, TD, CARME FEE64 adaptor PCB 10x
 
Entry  Mon Feb 28 14:38:15 2022, TD, NewMerger statistics 37x

Screenshots of all NewMerger statistics
Entry  Wed Mar 22 16:33:32 2023, TD, NIM WR source 8x

Test of NIM WR source at Edinburgh
Entry  Sun May 14 11:55:12 2023, TD, Sunday 14 May 
12.44 DSSSD#3 bias -149.95V leakage current -6.448uA temperature +19.7 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )

CRYRING cave lights ON - leakage current measurements @ 60s intervals
Entry  Mon May 15 07:34:22 2023, TD, Monday 15 May 
08.35 DSSSD#3 bias -149.95V leakage current -6.418uA temperature +19.6 deg C ( https://web-docs.gsi.de/~lestinsk/tempplot.php )

DSSSD#3 bias OFF
Entry  Thu Jul 13 08:46:44 2023, TD, Replacing wire seal 20230713_135351.jpg20230713_135416.jpg

09.30 CARME chamber status
Entry  Fri Jul 14 08:27:17 2023, TD, CARME open - inspecting seal 

09.20 CARME chamber at atmospheric pressure as expected.
Entry  Mon Jul 17 08:45:11 2023, TD, Closing CARME again 20230717_093106.jpg

Grosmantage are scheduled to arrive 10.00 to inspect COF600 seals and their fit to the COF600 flange. They may decide to adjust the seals so that they
fit the flange 
ELOG V3.1.4-unknown