AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  CARME, Page 4 of 38  ELOG logo
Entry  Tue Jul 18 08:16:28 2023, TD, Pumping down. Issues found with one detector. 
09.15 Following overnight pumping of CARME chamber by Leybold turbo
      Pirani 1.00e-3 mbar IE514 2.83e-7 mbar
Entry  Wed Jul 19 08:17:26 2023, TD, Leak testing 
09.16 Pirani 1.00e-3 mbar IE514 8.77e-8 mbar
      Leak tester c. 5e-12 mbar.l/s (leak tester valved off)
Entry  Thu Jul 20 08:29:26 2023, TD, Installing tent. Two NEG power cable broken. 11x
09.28 Pirani 1.00e-3 mbar IE514 5.45e-8 mbar

12.10 Bakeout tent frame installed
Entry  Mon Sep 25 16:33:32 2023, TD, Removed tape from heaters TC 1000007072.jpg1000007067.jpg1000007070.jpg

17.33 IE514 pressure 6.4e-11 mbar, ambient temperature +20.8 deg C
Entry  Tue Sep 26 08:08:42 2023, TD, Tuesday 26 September 7x
09.07 IE514 pressure 6.4e-11 mbar, ambient temperature +20.3 deg C

      Using appc218 ( account carme ) workstation by the CARME 19" rack 
Entry  Tue Sep 26 10:13:14 2023, TD, ELOTECH PID Temperature Controller R4000 manual ( German and English ) BA-Isoheat_R4000-XX-X-000-X-X_DE_V1.03.pdfR4000-XX-X-000-X-X_EN_V1.30.pdf
 
Entry  Wed Sep 27 15:56:41 2023, TD, Wednesday 27 September 1000007129.jpg1000007127.jpg1000007128.jpg

16.55 CARME IE514 8.2e-11 mbar
Entry  Thu Sep 28 09:19:50 2023, TD, Thursday 28 September 1000007142.jpg1000007143.jpg

10.20 CARME IE514 8.6e-11 mbar
Entry  Fri Sep 29 08:54:29 2023, TD, Friday 29 September 11x

09.50 CARME IE514 9.0e-11 mbar, ambient temperature 21.3 deg C
Entry  Sat Sep 30 10:58:14 2023, TD, Saturday 30 September 9x
10.50 CARME IE514 7.14e-10 mbar, ambient temperature 20.8 deg C

      CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Entry  Sun Oct 1 10:24:50 2023, TD, Sunday 1 October 12x
11.20 CARME IE514 3.53e-9 mbar, ambient temperature 20.6 deg C

      CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Entry  Mon Oct 2 08:41:43 2023, TD, Monday 2 October 6x
09.35 CARME IE514 1.95e-8 mbar, ambient temperature 20.8 deg C

      CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Entry  Tue Oct 3 08:48:36 2023, TD, Tuesday 3 October 1000007432.jpg1000007431.jpg1000007434.jpg
09.40 CARME IE514 1.79e-8 mbar, ambient temperature 20.7 deg C

      CARME bakeout monitor, ELOTECH R4000 temperature controller front panel and Grafana bakeout dashboard- attachments 1-3
Entry  Tue Jan 16 14:36:30 2024, TD, CARME configuration dhcpd.confOptionsSettingsstartup.tclrfs

FEE64
Entry  Tue Jan 16 16:01:48 2024, TD, Change CARMEraspberrypi to nnrpi1 Capture.PNG

Change RPi from CARMEraspberrypi to nnrpi1 to provide carme-gsi access to Rly16 to control USB-controlled ac mains relay.
nnrpi1 is already defined in carme-gsi:/etc/dhcp/dhcpd.conf
Entry  Wed Jan 17 10:31:05 2024, TD, Remote control of CAEN N1419ET from nnrpi1 Capture.PNG

Login to nnrpi1 from carme-gsi using ssh
Entry  Wed Jan 17 19:15:47 2024, TD, Wednesday 17 January 

CAEN N1419ET remote control via carme-gsi and nnrpi1 - see https://elog.ph.ed.ac.uk/CARME/472
Entry  Wed Jan 17 19:21:20 2024, TD, AIDA spares 

Spare AIDA hardware 
Entry  Thu Jan 18 17:21:00 2024, TD, Thursday 18 January Capture.PNG
Network ( dhcpd.conf ) and MIDAS startup.tcl/Options/ASIC settings/rfs filesystems configured

Entry  Mon Jan 22 16:29:31 2024, TD, Saturday 20 January 30x
11.00 No WLAN/WiFi
      came-gsi private LAN appears to be OK
ELOG V3.1.4-unknown