627
|
Thu Jun 13 23:01:07 2024 |
RSS, JS, EH | Run 67 - Night shift |
Run 67
00:01
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - attachment 3
per FEE64 Rate spectra OK - attachment 4
Beam intensity 5.7E7 particles
Target density - 4.98E11 atoms/cm2
02:01
DSSSD bias & leakage current OK - attachment 5
FEE64 temperatures OK - attachment 6
ADC data item stats OK - attachment 7
per FEE64 Rate spectra OK - attachment 8
Beam intensity 5.8E7 particles
Target density - 4.39E11 atoms/cm2
04:00
DSSSD bias & leakage current OK - attachment 9
FEE64 temperatures OK - attachment 10
ADC data item stats OK - attachment 11
per FEE64 Rate spectra OK - attachment 12
Beam intensity 4.1E7 particles
Target density - 3.57E11 atoms/cm2
06:00
DSSSD bias & leakage current OK - attachment 13
FEE64 temperatures OK - attachment 14
ADC data item stats OK - attachment 15
per FEE64 Rate spectra OK - attachment 16
Beam intensity 3.7E7 particles
Target density - 3.89E11 atoms/cm2
08:00
The orbit adjustments started. The detectors moved out. One of these showed rates of about 20kHz. but after moving it in and out again it returned to normal.
11:00
DSSSD bias & leakage current OK - attachment 17
FEE64 temperatures OK - attachment 18
ADC data item stats OK - attachment 19
per FEE64 Rate spectra OK - attachment 20
Beam intensity 4.9E7 particles
Target density - 5.27E11 atoms/cm2 |
Attachment 1: Screenshot_from_2024-06-14_00-02-01.png
|
|
Attachment 2: Screenshot_from_2024-06-14_00-02-20.png
|
|
Attachment 3: Screenshot_from_2024-06-14_00-02-31.png
|
|
Attachment 4: Screenshot_from_2024-06-14_00-02-40.png
|
|
Attachment 5: Screenshot_from_2024-06-14_02-00-42.png
|
|
Attachment 6: Screenshot_from_2024-06-14_02-00-58.png
|
|
Attachment 7: Screenshot_from_2024-06-14_02-01-04.png
|
|
Attachment 8: Screenshot_from_2024-06-14_02-01-13.png
|
|
Attachment 9: Screenshot_from_2024-06-14_04-00-08.png
|
|
Attachment 10: Screenshot_from_2024-06-14_04-00-26.png
|
|
Attachment 11: Screenshot_from_2024-06-14_04-00-38.png
|
|
Attachment 12: Screenshot_from_2024-06-14_04-00-52.png
|
|
Attachment 13: Screenshot_from_2024-06-14_06-00-15.png
|
|
Attachment 14: Screenshot_from_2024-06-14_06-00-31.png
|
|
Attachment 15: Screenshot_from_2024-06-14_06-00-42.png
|
|
Attachment 16: Screenshot_from_2024-06-14_06-00-51.png
|
|
Attachment 17: Screenshot_from_2024-06-14_10-53-10.png
|
|
Attachment 18: Screenshot_from_2024-06-14_10-53-54.png
|
|
Attachment 19: Screenshot_from_2024-06-14_10-54-28.png
|
|
Attachment 20: Screenshot_from_2024-06-14_10-55-05.png
|
|
|
626
|
Thu Jun 13 21:07:30 2024 |
LCS, US | Run 67- beam on target |
22:05
The energy is changed to 247.4 V.
Read back value is 246.849 V.
Right arm at 64.60 mm
Left arm IN at 36.54 mm
horizontal beam position 8.75 mm
vertical beam position -5mm
Beam intensity 4.0e+7 particles.
Run is R67. Target temperature is 36..6 K.
Values of E1 is 820 Hz, 2.4A, 8.69e-2 mbar, 2.55e+11/cm2. The pressure is slowly increasing since this afternoon. The recent value is E1 is 820 Hz, 2.4A, 9.0e-2 mbar, 3.28e+11/cm2
Systen checks all OK
Attachments
13.39 DSSSD bias & leakage current OK
FEE64 temps OK
ADC data item stats OK
per FEE64 Rate spectra
Merger, TapeServer et
data file R65_11
DSSSD bias & leakge current log
CARME DSSSD motion control
|
Attachment 1: Screenshot_from_2024-06-13_22-14-46.png
|
|
Attachment 2: Screenshot_from_2024-06-13_22-15-01.png
|
|
Attachment 3: Screenshot_from_2024-06-13_22-15-14.png
|
|
Attachment 4: Screenshot_from_2024-06-13_22-15-38.png
|
|
Attachment 5: Screenshot_from_2024-06-13_22-15-44.png
|
|
Attachment 6: Screenshot_from_2024-06-13_22-15-51.png
|
|
Attachment 7: Screenshot_from_2024-06-13_22-16-07.png
|
|
|
625
|
Thu Jun 13 14:46:17 2024 |
TD | R66 beam overlap test |
15.45 Start data file G22-201/R66
Beam/target overlap test |
|
624
|
Thu Jun 13 09:48:25 2024 |
TD, LCS | Run 65 - beam on target |
10:47
The energy is changed to 247.4 V.
Read back value is 246.849 V.
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
horizontal beam position 8.75 mm
vertical beam position -5mm
Beam intensity 3.0e+7 particles.
e-cooler export controls before/after energy change - attachments 1 & 2
New run is R65. Target temperature is 37.6 K.
Values of E1 is 820 Hz, 2.12A, 6.01e-2 mbar, 2.8e+11/cm2
12:34
Systen checks all OK
Target density stable at ~1.5e11 at/cm2
E1 = 6e-2 mbar, turbo is fine
13,38 CB reboots RHS CRYRING control computer (atppc017) - appears to be a now unavoidable system update/reboot
13.39 DSSSD bias & leakage current OK - attachment 3
FEE64 temps OK - attachment 4
ADC data item stats OK - attachment 5
per FEE64 Rate spectra - attachment 6
Merger, TapeServer etc - attachments 7-8
data file R65_11
DSSSD bias & leakge current log - attachment 12
CARME DSSSD motion control - attachment 13
13.42 E1 turbo 820Hz 2.2A 5.2e-2mbar
Target 3.45e+11/cm2 T1 36.6K
Beam c. 3e+7
15:20
Stats OK. Temps OK.
Merger OK. Write to disk OK.
|
Attachment 1: 20240613_104403.jpg
|
|
Attachment 2: 20240613_104840.jpg
|
|
Attachment 3: Screenshot_from_2024-06-13_13-39-26.png
|
|
Attachment 4: Screenshot_from_2024-06-13_13-39-40.png
|
|
Attachment 5: Screenshot_from_2024-06-13_13-40-09.png
|
|
Attachment 6: Screenshot_from_2024-06-13_13-40-32.png
|
|
Attachment 7: Screenshot_from_2024-06-13_13-40-52.png
|
|
Attachment 8: Screenshot_from_2024-06-13_13-41-02.png
|
|
Attachment 9: Screenshot_from_2024-06-13_13-41-16.png
|
|
Attachment 10: Screenshot_from_2024-06-13_13-41-23.png
|
|
Attachment 11: Screenshot_from_2024-06-13_15-12-19.png
|
|
Attachment 12: Screenshot_from_2024-06-13_15-13-16.png
|
|
Attachment 13: Screenshot_from_2024-06-13_15-20-28.png
|
|
Attachment 14: Screenshot_from_2024-06-13_15-20-31.png
|
|
|
623
|
Thu Jun 13 06:21:53 2024 |
TD, LCS | Run 64 - contd |
07.22 E1 pump 799Hz, 2.8A, 2.6e-1 mbar, 4.8e+11/cm2
07.24 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats OK - attachment 3
per FEE64 Rate spectra - attachment 4
per FEE64 1.8.L spectra - attachments 5-6
per FEE64 1.8.W spectra - 20us FSR - attachments 7-8
Merger, TapeServer etc - attachments 9-10
data file G22-201/R64_11
DSSSD bias & leakage current log - attachment 11
CRYRING hall temperature log - attachment 12
CARME DSSSD position controller - attachment 13
07.57 all histograms zero'd
07.58 E1 pump 794Hz, 2.8A, 2.6e-1 mbar, 3.1e+11/cm2
08.55 E1 pump 785Hz, 2.8A, 2.74e-1 mbar, 4.8e+11/cm2. Therefore, the temperature is changed from 38.8 K to 38.4 K. Values of E1 is changed to E1 pump 782Hz, 2.7A, 2.95e-1 mbar, 6e+11/cm2
09.15 The temperature is further changed from 38.4 K to 38.0 K.
09.25 Values of E1 is changed to E1 pump 780 Hz, 2.79 A, 3.0 e-1 mbar, 5.87 e+11/cm2
09.35 Values of E1 is changed to E1 pump 779 Hz, 2.79 A, 3.1 e-1 mbar, 2.07 e+11/cm2
09.45 Values of E1 is changed to E1 pump 778 Hz, 2.75 A, 3.0 e-1 mbar, 4.6 e+11/cm2
10.00 Values of E1 is changed to E1 pump 776 Hz, 2.78 A, 3.05 e-1 mbar, 5 e+11/cm2
Intervention by Uli. Reduced H2 regulator to c. 12 bar. Briefly opened exhaust to hasten recovery.
10.13 E1 820Hz 2.3A 7.7e-2mbar c. 2e+11/cm2
10.34 E1 820Hz 2.1A 6.2e-2mbar c. 1.2e+11/cm2 38K
Beam c. 4e+7. Cooler set 247.3V, read 246.751V. |
Attachment 1: Screenshot_from_2024-06-13_07-24-49.png
|
|
Attachment 2: Screenshot_from_2024-06-13_07-28-56.png
|
|
Attachment 3: Screenshot_from_2024-06-13_07-30-34.png
|
|
Attachment 4: Screenshot_from_2024-06-13_07-36-35.png
|
|
Attachment 5: Screenshot_from_2024-06-13_07-40-06.png
|
|
Attachment 6: Screenshot_from_2024-06-13_07-41-10.png
|
|
Attachment 7: Screenshot_from_2024-06-13_07-42-32.png
|
|
Attachment 8: Screenshot_from_2024-06-13_07-43-30.png
|
|
Attachment 9: Screenshot_from_2024-06-13_08-10-26.png
|
|
Attachment 10: Screenshot_from_2024-06-13_08-10-33.png
|
|
Attachment 11: Screenshot_from_2024-06-13_08-10-43.png
|
|
Attachment 12: Capture.PNG
|
|
Attachment 13: Screenshot_from_2024-06-13_08-16-07.png
|
|
|
622
|
Thu Jun 13 00:50:33 2024 |
JM, JS | Run 64 - beam on target |
01:50
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target ~3E11
Injection ca. 3E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 247.3 V
Read value 246.75 V
Collector current 4.3A
Histograms and statistics zero'd. Code reset
Rates OK. Temps OK.
NOTE. Between 23:45 and 12:45 the electron cooler was off? We called HKR and they turned it back on. Are we using the same cooler settings? Is the cooler still definitely working properly? Ask Claude in the morning
02:30
The target density started to oscillate between 2e+10 and 3.5e+10. However, the pump speed seems to be stable.
03:50
The oscillations seems to deepend between 1e+10 and 6e+10. Additionally the E1 pump slowed down to 815. As Nikos suggested during the tuning, I tried to lower the temperature from 41K to 40.8K.
04:00 - 04:30
No major change was observed, thus I increased the temperature to 42.2K in order to try to get the pump to the nominal rotation. After 10 minutes, the pump slowed down to 810 and the pressure in E1 reached 2.2e-1. Since increasing the temperature seemed to have a negative effect, I slowly decresed the temperature with steps of 0.2 K, until reaching 40K. At this point, the E1 pump returned to 819/820, the pressure of E1 lowered to 1.6e-1 and the target density seems to be more stable with a value of 2.8e+11.
05:00
The target density started decreasing to 1.5e+10 and the pump speed slowed to 815. I've tried to lower the temperature to 39.8K, but the target density started to decrease. Thus I've set the temperature to 40.2K. The pump speed raised to 818 but the target density remaind at 1e+11 level with oscillations between 8.5e+10 and 1.5e+11. After some minutes, it started slowly increasing towards the 2e+11 region. The E1 pumping speed is stable at 818 and the pressure of E1 is 2.02e-1.
05:10
Electron cooler off, restarted 10 minutes after by calling HKK.
05:30
Target density at 1.5e+11, however, the E1 raised to 2.3e-1 and the pump speed decreased to 810. Since going down seemed to solve it, I decreased the temperature to 39.6K. After 5 minutes the E1 lowered to 1.9e-1 and the pump speed is going up (currently at 814). The target density is at the same level of 1.5e+11.
06:00
Again the target density started to go down, as well the speed of the E1 pump and the E1 pressure reached 2.3e-1. I lowered the temperature to 39.2K: the target density raised to approximately 3.8e+11 (and keeps going up), the E1 pressure lowered to 1.9e-1 and the E1 pump speed started increasing from 810 to 815.
06:30
The target density starting going down again, the E1 started increasing to 2.3e-1 and the E1 pump speed decreased to 810. I lowered the temperature to 38.8K, the density raised to 3.5e+11, the E1 pressure lowered to 1.9e-1 and the pumping speed starting increasing. |
|
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status |
07:56 Gleb has taken the beam to try settings for the 5+ charge state. As soon as the target is ready, the 1+ charge state will be given back.
Detectors have been moved out for safety
08:10
Run 63
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
09:55
Run 63
DSSSD bias & leakage current OK
FEE64 temperatures OK
ADC data item stats OK
per FEE64 Rate spectra OK
10:30
Data rate appeared very high c. 2000 kB/s instead of the usual 200 kB/s.
Rate on first two ASICs of aida02 was high (~2 kHz) but rest of aida01-04 looked fine.
ASIC check load reduced rate back to normal levels. Data rate reduced back to 200 kB/sec.
New ADC offsets loaded into the CARME_Sort code
Aida03 appears to be down. Check load does not resolve issue. Moving detector arm does not resolve issue. No spike in leakage current observed. System checks appear OK. Zeroing ADC data item statistics keeps aida03 at 606023857 items and does not zero.
Issue resolved by resetting the data links for aida03
13:20
DSSSD bias & leakage current OK
FEE64 temperatures OK
ADC data item stats OK
per FEE64 Rate spectra OK
21:30
Waiting for the target.
Beam has been running, we have been running without storage.
See attachment showing beam stripe on the detectors.
|
Attachment 1: Screenshot_from_2024-06-12_08-18-27.png
|
|
Attachment 2: Screenshot_from_2024-06-12_08-18-44.png
|
|
Attachment 3: Screenshot_from_2024-06-12_08-18-55.png
|
|
Attachment 4: Screenshot_from_2024-06-12_08-19-08.png
|
|
Attachment 5: Screenshot_from_2024-06-12_11-10-34.png
|
|
Attachment 6: Screenshot_from_2024-06-12_21-39-20.png
|
|
|
620
|
Tue Jun 11 21:16:50 2024 |
TD | Run 63 continued |
Run 63 continued
22.06 DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachments 4-5
aida16 producing HEC data, ASIC check load to clear
23.56 DSSSD bias & leakage current OK - attachment 6
FEE64 temperatures OK - attachment 7
ADC data item stats - attachment 8
per FEE64 Rate spectra - attachments 9
aida01-aida04 high ADC data item rates - left DSSSD motion cycle required to reset
03.28 DSSSD bias & leakage current OK - attachment 10
FEE64 temperatures OK - attachment 11
ADC data item stats - attachment 12
per FEE64 Rate spectra - attachments 13
aida01-aida04 high ADC data item rates - left DSSSD motion cycle required to reset
07.50 DSSSD bias & leakage current OK - attachment 14
FEE64 temperatures OK - attachment 15
ADC data item stats - attachment 16
per FEE64 Rate spectra - attachments 17
aida01-aida04 high ADC data item rates (see above) appears to have resolved itself or has been resolved (but not logged) |
Attachment 1: Screenshot_from_2024-06-11_22-06-38.png
|
|
Attachment 2: Screenshot_from_2024-06-11_22-07-38.png
|
|
Attachment 3: Screenshot_from_2024-06-11_22-08-37.png
|
|
Attachment 4: Screenshot_from_2024-06-11_22-12-35.png
|
|
Attachment 5: Screenshot_from_2024-06-11_22-10-38.png
|
|
Attachment 6: Screenshot_from_2024-06-11_23-56-29.png
|
|
Attachment 7: Screenshot_from_2024-06-12_00-00-16.png
|
|
Attachment 8: Screenshot_from_2024-06-12_00-02-06.png
|
|
Attachment 9: Screenshot_from_2024-06-12_00-02-35.png
|
|
Attachment 10: Screenshot_from_2024-06-12_03-25-53.png
|
|
Attachment 11: Screenshot_from_2024-06-12_03-26-33.png
|
|
Attachment 12: Screenshot_from_2024-06-12_03-27-12.png
|
|
Attachment 13: Screenshot_from_2024-06-12_03-28-02.png
|
|
Attachment 14: Screenshot_from_2024-06-12_07-50-16.png
|
|
Attachment 15: Screenshot_from_2024-06-12_07-52-53.png
|
|
Attachment 16: Screenshot_from_2024-06-12_07-53-23.png
|
|
Attachment 17: Screenshot_from_2024-06-12_07-53-53.png
|
|
|
619
|
Tue Jun 11 20:10:25 2024 |
JM | Run 63 - Beam only background |
21:00
Claude has achieved optimal cooling parameters for the beam
No target and internal work inside the cave tomorrow is required
Run 63 going - beam only background
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS fakemotion script running
High rates on top left dssd again. Cycle left servo motor two times resolved issue
Rates OK. Temps OK. |
|
618
|
Tue Jun 11 19:44:48 2024 |
OF, SS | Target out and at He |
Target has been moved out and H2 switched off. Changed to He.
Nikos will repair nozzle tomorrow morning. Remote checks until then. |
|
617
|
Tue Jun 11 12:26:07 2024 |
RSS, JS, JM, CB | Run 62 - Beam optimization + Target change |
Beam optimization and target change |
|
616
|
Tue Jun 11 08:34:50 2024 |
JM, RSS, JS | Run 61 - beam on target |
New run 61
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target 4E11
Injection ca. 3E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.95 V
Read value 244.4 V
Collector current 4.31A
Histograms and statistics zero'd. Code reset
Rates OK. Temps OK.
10:24
We lost the beam for 5 minutes. No counting spike observed when we got it back.
1L10
We lost the beam again for 5 minutes, but no counting spike obsevered when we got it back.
11:50
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 3.3E7 pps
Target density - 5.14E11 atoms/cm2
12:00 - 12:40
Large fluctuations in the target pressure, going down to 1e-9. We increased the temperature a little but it did not solve the problem.
Increased pressure 0.5 K more. Seems more stable
13:09
FEEs on det 2 stopped working. Checkloaded. Fixed.
No beam. |
Attachment 1: Screenshot_from_2024-06-11_11-47-57.png
|
|
Attachment 2: Screenshot_from_2024-06-11_11-48-20.png
|
|
Attachment 3: Screenshot_from_2024-06-11_11-48-32.png
|
|
Attachment 4: Screenshot_from_2024-06-11_11-48-44.png
|
|
|
615
|
Tue Jun 11 04:36:17 2024 |
CB, RSS, JS | Run 60 - as 59, left servo in |
05:36
Run started.
Conditions as before, except left servo now really in.
06:24
Run continues OK, file R60_9
Temps OK. Stats OK. Merger OK. Write to disk OK.
System wide checks as usual.
07:30
DSSSD bias & leakage current OK - attachment 4
FEE64 temperatures OK - attachment 5
ADC data item stats - attachment 6
per FEE64 Rate spectra - attachment 7
Beam intensity - ~ 4.8E7 pps
Target density - 7.25E11 atoms/cm2
9:20
DSSSD bias & leakage current OK - attachment 8
FEE64 temperatures OK - attachment 9
ADC data item stats - attachment 10
per FEE64 Rate spectra - attachment 11
Beam intensity - ~ 4E7 pps
Target density - 7E11 atoms/cm2
|
Attachment 1: Screenshot_from_2024-06-11_06-23-36.png
|
|
Attachment 2: Screenshot_from_2024-06-11_06-23-56.png
|
|
Attachment 3: Screenshot_from_2024-06-11_06-24-11.png
|
|
Attachment 4: Screenshot_from_2024-06-11_07-27-43.png
|
|
Attachment 5: Screenshot_from_2024-06-11_07-28-02.png
|
|
Attachment 6: Screenshot_from_2024-06-11_07-28-14.png
|
|
Attachment 7: Screenshot_from_2024-06-11_07-28-22.png
|
|
Attachment 8: Screenshot_from_2024-06-11_09-18-55.png
|
|
Attachment 9: Screenshot_from_2024-06-11_09-19-10.png
|
|
Attachment 10: Screenshot_from_2024-06-11_09-19-20.png
|
|
Attachment 11: Screenshot_from_2024-06-11_09-19-28.png
|
|
|
614
|
Mon Jun 10 20:31:12 2024 |
JM, AK, EH, CB | Run 59 Beam on target |
21:32
New run 59
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target 4.7E11
Injection ca. 4E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.85 V
Read value 244.3 V
Collector current 4.31A
Histograms and statistics zero'd. Code reset
Rates OK. Temps OK.
22:44
Screenshots of the above
23:00
Detector 0 shows usual strong noise. Shook twice. Fixed it. Beam loss in correspondence with this event.
Beam mostly recovered a few minutes later.
23:28
Detector 0 shows noise. Shook twice with servo. No result. Shook with pneumatic. Fixed. Some beam instabilities again.
01:00
Temps OK. Rates OK.
Merger OK. Write to disk OK (file 59_13)
01:36
Detector 0 shows usual strong noise. Shook it. Fixed it.
01:46
Detector 0 shows noise. Shook twice with servo. No result. Shook with pneumatic. Fixed.
The noise increase is definitely correlated with spikes in YRT1DT1MK current reading. Unclear what the reading is.
02:36
Target density has been consistentyl above 1E12 recently, very unstable and trending forward. Increased Lakeshore setpoint by 0.5 K.
Density decreases to high 1E11, and appear significantly more stable. E1 pressure reading also decreasing to 1E-1 mbar.
Temps OK. Stats OK. Merger OK. Write to disk OK.
03:58
Temps OK. Stats OK. Merger OK. Write to disk OK.
Target still unstable and now a bit too low density. Trying to slowly lower the temperature in 0.1 K steps.
04:55
Temps OK. Stats OK. Merger OK. Write to disk OK.
Target around 6E11 atoms/cm2, with Lakeshore temperature at 30.8 K. Waiting for it to stabilise.
05:34
Detector 0 noisy. Shook. Fixed it.
Realised I had not moved the detector back at 01:46 after shaking it. Most of this run has been taken with detector 0 fully out, i.e. 18.86 mm.
Moving in and moving to a new run. |
Attachment 1: Screenshot_from_2024-06-10_22-45-11.png
|
|
Attachment 2: Screenshot_from_2024-06-10_22-45-21.png
|
|
Attachment 3: Screenshot_from_2024-06-10_22-46-00.png
|
|
Attachment 4: Screenshot_from_2024-06-10_22-46-17.png
|
|
Attachment 5: Screenshot_from_2024-06-10_22-46-26.png
|
|
Attachment 6: Screenshot_from_2024-06-10_22-46-46.png
|
|
Attachment 7: Screenshot_from_2024-06-10_22-47-47.png
|
|
Attachment 8: Screenshot_from_2024-06-10_22-47-51.png
|
|
Attachment 9: Screenshot_from_2024-06-11_00-57-12.png
|
|
Attachment 10: Screenshot_from_2024-06-11_00-57-20.png
|
|
Attachment 11: Screenshot_from_2024-06-11_03-58-02.png
|
|
Attachment 12: Screenshot_from_2024-06-11_04-54-48.png
|
|
Attachment 13: Screenshot_from_2024-06-11_04-54-59.png
|
|
Attachment 14: Screenshot_from_2024-06-11_04-55-28.png
|
|
Attachment 15: Screenshot_from_2024-06-11_04-55-33.png
|
|
Attachment 16: Screenshot_from_2024-06-11_05-35-24.png
|
|
Attachment 17: Screenshot_from_2024-06-11_05-35-27.png
|
|
Attachment 18: Screenshot_from_2024-06-11_05-35-33.png
|
|
|
613
|
Mon Jun 10 18:22:47 2024 |
JM | Electron cooler calculations |
Ion beam energy is calculated using Beamcalc (https://web-docs.gsi.de/~lestinsk/beamcalc/electron.php)
Electron current is set to 4.3 mA and can be taken from Grafana
Alpha factor is 50
Ion energy is then adjusted using the cooler voltage
The cooler voltage inserted into BeamCalc is taken from the FC20 voltage divider. However an offset from the space charge correction is required!
This correction is determined experimentally by changing the electron current and finding the cooler voltage which maintains the optimum cooling of the beam.
Attachment 1 shows this plot for 15N1+ at ~0.426 MeV/u
Attachment 2 shows this same plot in comparison with BeamCalc
To obtain the correct energy we need to subtract 2V from the voltage used in BeamCalc
An example is shown in attachment 3
Here to obtain an ion energy of 426.6 keV/u requires a cooler voltage of 246.7 V. But, due to the space charge correction this value should be 244.7 V.
The cooler voltage setpoint should therefore be chosen so that the FC20 voltage divider reads 244.7 V.
The setpoint needs to be ~0.55 V higher than the desired value i.e setpoint of 245.25 V to obtain the required 244.7 V (at least this beamtime it does)
|
Attachment 1: space-charge-2.png
|
|
Attachment 2: space-charge-1.png
|
|
Attachment 3: BeamCalc.png
|
|
|
612
|
Mon Jun 10 14:26:52 2024 |
EH, AK | Run 58 |
15:30
Merger OK, Tape server OK
ADC data item statistics OK
FEE temperatures look OK
System checks OK
20:20
Merger OK, Tape server OK
ADC data item statistics OK
FEE temperatures look OK
System checks OK |
Attachment 1: Screenshot_from_2024-06-10_15-24-15.png
|
|
Attachment 2: Screenshot_from_2024-06-10_15-22-30.png
|
|
Attachment 3: Screenshot_from_2024-06-10_15-23-28.png
|
|
Attachment 4: Screenshot_from_2024-06-10_15-23-20.png
|
|
Attachment 5: Screenshot_from_2024-06-10_20-21-55.png
|
|
Attachment 6: Screenshot_from_2024-06-10_20-21-48.png
|
|
Attachment 7: Screenshot_from_2024-06-10_20-20-11.png
|
|
Attachment 8: Screenshot_from_2024-06-10_20-21-14.png
|
|
|
611
|
Mon Jun 10 12:49:56 2024 |
RSS, DB, CB, JM | R58 Space Charge Test |
13:53
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.0E7 pps
Target density - off
|
Attachment 1: Screenshot_from_2024-06-10_13-52-45.png
|
|
Attachment 2: Screenshot_from_2024-06-10_13-53-04.png
|
|
Attachment 3: Screenshot_from_2024-06-10_13-53-17.png
|
|
Attachment 4: Screenshot_from_2024-06-10_13-53-28.png
|
|
|
610
|
Mon Jun 10 07:40:47 2024 |
RSS, DB | Beam |
08:26: There is no beam and Gleb is informed.
08:46: Beam is back. |
|
609
|
Mon Jun 10 05:24:49 2024 |
TD, RSS, DB | R57 |
06:45 New data file G22-201/R57
Right arm at 64.60 mm
Left arm IN at 36.54 mm
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.4 V
Read value 243.851 V
Collector current 4.31A
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Beam intensity - ~ 5.7E7 pps
Target density - 2.91E11 atoms/cm2
8:35
DSSSD bias & leakage current OK - attachment 5
FEE64 temperatures OK - attachment 6
ADC data item stats - attachment 7
per FEE64 Rate spectra - attachment 8
Beam intensity - ~ 4.8E7 pps
Target density - 2.86E11 atoms/cm2
There is no beam since 8:26 and Gleb is informed. 08:46: Beam is back.
10:49
DSSSD bias & leakage current OK - attachment 9
FEE64 temperatures OK - attachment 10
ADC data item stats - attachment 11
per FEE64 Rate spectra - attachment 12
Beam intensity - ~ 4.0E7 pps
Target density - 3.66E11 atoms/cm2
13:18
DSSSD bias & leakage current OK - attachment 13
FEE64 temperatures OK - attachment 14
ADC data item stats - attachment 15
per FEE64 Rate spectra - attachment 16
Beam intensity - ~ 5.0E7 pps
Target density - 5.67E11 atoms/cm2
|
Attachment 1: Screenshot_from_2024-06-10_06-41-37.png
|
|
Attachment 2: Screenshot_from_2024-06-10_06-42-40.png
|
|
Attachment 3: Screenshot_from_2024-06-10_06-43-15.png
|
|
Attachment 4: Screenshot_from_2024-06-10_06-44-38.png
|
|
Attachment 5: Screenshot_from_2024-06-10_08-34-30.png
|
|
Attachment 6: Screenshot_from_2024-06-10_08-34-59.png
|
|
Attachment 7: Screenshot_from_2024-06-10_08-35-23.png
|
|
Attachment 8: Screenshot_from_2024-06-10_08-35-42.png
|
|
Attachment 9: Screenshot_from_2024-06-10_10-46-13.png
|
|
Attachment 10: Screenshot_from_2024-06-10_10-46-31.png
|
|
Attachment 11: Screenshot_from_2024-06-10_10-46-42.png
|
|
Attachment 12: Screenshot_from_2024-06-10_10-46-52.png
|
|
Attachment 13: Screenshot_from_2024-06-10_13-16-00.png
|
|
Attachment 14: Screenshot_from_2024-06-10_13-16-19.png
|
|
Attachment 15: Screenshot_from_2024-06-10_13-16-31.png
|
|
Attachment 16: Screenshot_from_2024-06-10_13-16-40.png
|
|
|
608
|
Sun Jun 9 22:14:23 2024 |
TD, PM, AG | Run 56 - Data taking |
23:15 New run 56 with
Right arm at 64.60 mm
Left arm IN at 36.54 mm
MBS working - hopefully
Target 4E11
Injection ca. 4E7
horizontal beam position 8.75 mm
vertical beam position -5mm
Changed electron cooler set point to 244.3 V
Read value 243.757 V
Collector current 4.31A
Rates OK. Temps OK
00.30 DAQ continues file G22-201/R56_9
DSSSD bias & leakage current OK - attachment 1
FEE64 temperatures OK - attachment 2
ADC data item stats - attachment 3
per FEE64 Rate spectra - attachment 4
Merger etc - attachment 5
DSSSD bias & leakage current log, CRYRING hall ambient temperature log - attachments 6-7
01.30 Photographs of current CRYRING controls - attachments 8-14
01.30 DAQ continues file G22-201/R56_14
DSSSD bias & leakage current OK - attachment 15
FEE64 temperatures OK - attachment 16
ADC data item stats - attachment 17
per FEE64 Rate spectra
aida16 asics # 1 & # 2 HEC data - attachment 18
aida16 ASIC load check x2 restores normal operation - attachment 19
target 5e+11 stable, beam 4e+7 stable
02.45 beam off - reported to HKR
DAQ continues file G22-201/R56_16
03.00 beam back
beam 4e+7 stable, target 5e+11 stable
DSSSD bias & leakage current OK - attachment 20
FEE64 temperatures OK - attachment 21
ADC data item stats - attachment 22
per FEE64 Rate spectra - attachment 23
04.20 DAQ continues file G22-201/R56_21
DSSSD bias & leakage current OK - attachment 24
FEE64 temperatures OK - attachment 25
ADC data item stats - attachment 26
per FEE64 Rate spectra - attachments 27
Cycle L DSSSDs per https://elog.ph.ed.ac.uk/CARME/603
06.04 DAQ continues file G22-201/R56_21
DSSSD bias & leakage current OK - attachment 28
FEE64 temperatures OK - attachment 29
ADC data item stats - attachment 30
per FEE64 Rate spectra - attachments 31
beam 4e+7 stable, target 4e+11 stable |
Attachment 1: Screenshot_from_2024-06-10_00-23-24.png
|
|
Attachment 2: Screenshot_from_2024-06-10_00-24-07.png
|
|
Attachment 3: Screenshot_from_2024-06-10_00-24-20.png
|
|
Attachment 4: Screenshot_from_2024-06-10_00-25-10.png
|
|
Attachment 5: Screenshot_from_2024-06-10_00-25-38.png
|
|
Attachment 6: Screenshot_from_2024-06-10_00-42-25.png
|
|
Attachment 7: Capture.PNG
|
|
Attachment 8: 20240610_003428.jpg
|
|
Attachment 9: 20240610_003436.jpg
|
|
Attachment 10: 20240610_003446.jpg
|
|
Attachment 11: 20240610_003458.jpg
|
|
Attachment 12: 20240610_003510.jpg
|
|
Attachment 13: 20240610_003518.jpg
|
|
Attachment 14: 20240610_003529.jpg
|
|
Attachment 15: Screenshot_from_2024-06-10_01-32-42.png
|
|
Attachment 16: Screenshot_from_2024-06-10_01-32-58.png
|
|
Attachment 17: Screenshot_from_2024-06-10_01-33-07.png
|
|
Attachment 18: Screenshot_from_2024-06-10_01-33-35.png
|
|
Attachment 19: Screenshot_from_2024-06-10_01-34-12.png
|
|
Attachment 20: Screenshot_from_2024-06-10_02-55-21.png
|
|
Attachment 21: Screenshot_from_2024-06-10_02-55-58.png
|
|
Attachment 22: Screenshot_from_2024-06-10_02-56-13.png
|
|
Attachment 23: Screenshot_from_2024-06-10_02-56-22.png
|
|
Attachment 24: Screenshot_from_2024-06-10_04-22-41.png
|
|
Attachment 25: Screenshot_from_2024-06-10_04-22-55.png
|
|
Attachment 26: Screenshot_from_2024-06-10_04-23-24.png
|
|
Attachment 27: Screenshot_from_2024-06-10_04-23-31.png
|
|
Attachment 28: Screenshot_from_2024-06-10_06-04-17.png
|
|
Attachment 29: Screenshot_from_2024-06-10_06-04-32.png
|
|
Attachment 30: Screenshot_from_2024-06-10_06-04-44.png
|
|
Attachment 31: Screenshot_from_2024-06-10_06-04-52.png
|
|