450
|
Sun Oct 1 10:24:50 2023 |
TD | Sunday 1 October | 11.20 CARME IE514 3.53e-9 mbar, ambient temperature
20.6 deg C
|
12x |
404
|
Fri May 26 08:53:54 2023 |
JM, CB | Strain reliefs (flange side) installed | Strain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). |
   |
402
|
Wed May 24 08:35:12 2023 |
JM, CB | Strain reliefs (detector side) installed | The new MACOR strain reliefs on the (detector
side) have been installed. See attached photos
The two pieces of MACOR are |
    |
136
|
Sun Oct 31 07:55:39 2021 |
CB JM + OH | Strain relief mounted | (Thu 28 October)
All strain relief extension plates
mounted behind the wires, using SS countersunk |
  |
62
|
Tue Sep 7 14:10:02 2021 |
CB RSS + OG | Strain relief SS support re-drilled | Re-drilled SS supports in order to fit M3
screws.
|
|
509
|
Tue Feb 13 08:34:44 2024 |
Hw, JM, AR, CB, NP, AB, RSS | Status of DAQ - beam overlap | Check the status of the DAQ system, with
Tom. All correct. See attachments:
1 Leackage currents |
10x |
621
|
Wed Jun 12 07:16:47 2024 |
RSS, YL, JM, TD, CB | Status | 07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given |
6x |
553
|
Mon May 27 15:25:08 2024 |
JM | Startup | 27/05/24
The carme-gsi computer has been
moved from the server room into the shifter |
|
288
|
Sat Feb 26 22:22:27 2022 |
David, Pierre-Michell | Starting to take data | At 23:22 we started recording data under
the new conditions.
Merger, Tape server (WS3): |
11x |
453
|
Sun Oct 15 09:35:03 2023 |
CB | Starting ramp down | 10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63% |
 |
122
|
Wed Oct 13 15:28:22 2021 |
RSS TD + OG | Split funnels | Split funnels installed on 4 (of 8) 2x78
way D connector feed-throughs. |
7x |
462
|
Wed Jan 10 10:22:41 2024 |
CB, JM | Some FEEs mounted - issues with Det#2 (bottom left) | Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor |
 |
236
|
Tue Feb 22 12:23:23 2022 |
CB | Slow comparator thresholds lowered - test run | 13:20 Stopped run.
Slow comp thresh 0x64 -> 0x32
on all FEEs |
|
407
|
Thu Jun 22 18:58:02 2023 |
JM, TD | Slide back onto ring | The wire seal has been tightend further
to 160 Nm. Open neg feed-through flange has
also been fully tightend. |
  |
64
|
Wed Sep 8 17:03:07 2021 |
CB RSS + OG NB | Six feedthrough flanges mounted | Continued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a |
23x |
538
|
Tue Feb 20 14:12:32 2024 |
JM | Shutdown | CARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.
Detector bias turned OFF. |
|
194
|
Mon Feb 14 09:56:39 2022 |
CB | Shifters instructions 2022 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
10x |
498
|
Thu Feb 8 11:22:28 2024 |
JM | Shifters instruction 2024 | EMERGENCY SHUTDOWNS
1. CARME motors: Q key
on keyboard while on workspace 1 of appc218 |
|
484
|
Thu Feb 1 10:04:11 2024 |
JM, CB | Shaping time testing | Arrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according |
31x |
408
|
Sat Jun 24 10:38:42 2023 |
JM, TD | Section 9 closed, begin pumping | 23/06/23
The CARME chamber and interaction
chamber were connected and section 9 has |
 |