  450   Sun Oct 1 10:24:50 2023 TDSunday 1 October11.20 CARME IE514 3.53e-9 mbar, ambient temperature
20.6 deg C
 12x 
  404   Fri May 26 08:53:54 2023 JM, CBStrain reliefs (flange side) installedStrain reliefs on the flange side of the
cable harness have been installed for two
detectors (top right and bottom right detectors). 
 strain-relief-flange-side.jpgstrain-relief1_(1).mp420230526_140923.jpgV-I-plot.png 
  402   Wed May 24 08:35:12 2023 JM, CBStrain reliefs (detector side) installedThe new MACOR strain reliefs on the (detector
side) have been installed. See attached photos

The two pieces  of MACOR are
 20230524_092010.jpg20230524_092017.jpg20230524_092101.jpg20230524_093000.jpg20230524_092159.mp4 
  136   Sun Oct 31 07:55:39 2021 CB JM + OHStrain relief mounted(Thu 28 October)

All strain relief extension plates
mounted behind the wires, using SS countersunk
 20211028_190026.jpg20211028_192251.jpg20211028_192210.jpg 
  62   Tue Sep 7 14:10:02 2021 CB RSS + OGStrain relief SS support re-drilledRe-drilled SS supports in order to fit M3
screws.
  
  509   Tue Feb 13 08:34:44 2024 Hw, JM, AR, CB, NP, AB, RSSStatus of DAQ - beam overlapCheck the status of the DAQ system, with
Tom. All correct. See attachments:

1 Leackage currents
 10x 
  621   Wed Jun 12 07:16:47 2024 RSS, YL, JM, TD, CBStatus07:56 Gleb has taken the beam to try settings
for the 5+ charge state. As soon as the target
is ready, the 1+ charge state will be given
 6x 
  553   Mon May 27 15:25:08 2024 JMStartup27/05/24

The carme-gsi computer has been
moved from the server room into the shifter
  
  288   Sat Feb 26 22:22:27 2022 David, Pierre-MichellStarting to take dataAt 23:22 we started recording data under
the new conditions.

Merger, Tape server (WS3):
 11x 
  453   Sun Oct 15 09:35:03 2023 CBStarting ramp down10:40 - Status as attached. Heaters setpoint/read
at 250 C, 150 C, 225 C. Power stable at 53%,
41%, 63%
 Screenshot_2023-10-15_10-35-47.pngScreenshot_2023-10-15_17-56-00.png 
  122   Wed Oct 13 15:28:22 2021 RSS TD + OGSplit funnelsSplit funnels installed on 4 (of 8) 2x78
way D connector feed-throughs.
 7x 
  462   Wed Jan 10 10:22:41 2024 CB, JMSome FEEs mounted - issues with Det#2 (bottom left)Started mounting some FEEs. We ran into
some mechanical issues due to the new ERNI
connectors on the new flexi-rigid adaptor
 Screenshot_2024-01-10_11-59-39.pngScreenshot_2024-01-10_12-56-36.png 
  236   Tue Feb 22 12:23:23 2022 CBSlow comparator thresholds lowered - test run13:20 Stopped run.

Slow comp thresh 0x64 -> 0x32
on all FEEs
  
  407   Thu Jun 22 18:58:02 2023 JM, TDSlide back onto ringThe wire seal has been tightend further
to 160 Nm. Open neg feed-through flange has
also been fully tightend. 
 20230622_112534.jpg20230622_112827.jpg20230622_120307.jpg 
  64   Wed Sep 8 17:03:07 2021 CB RSS + OG NBSix feedthrough flanges mountedContinued to mount flanges as per previous
ELOG entry.
Peter also remarked that the wires look a
 23x 
  538   Tue Feb 20 14:12:32 2024 JMShutdownCARME DAQ shutdown. FEEs turned OFF and
all MIDAS server windows closed.

Detector bias turned OFF.
 Screenshot_from_2024-02-20_15-11-40.png 
  194   Mon Feb 14 09:56:39 2022 CBShifters instructions 2022EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
 10x 
  498   Thu Feb 8 11:22:28 2024 JMShifters instruction 2024EMERGENCY SHUTDOWNS

1. CARME motors: Q key
on keyboard while on workspace 1 of appc218
  
  484   Thu Feb 1 10:04:11 2024 JM, CBShaping time testingArrived at the control room to find we
had lost connection to the power relay. We
rebooted the nnrpi1 and re-connected according
 31x 
  408   Sat Jun 24 10:38:42 2023 JM, TDSection 9 closed, begin pumping 23/06/23

The CARME chamber and interaction
chamber were connected and section 9 has
 23-06-23-VI.png24-06-23-VI.png 