Entry  Wed Nov 21 08:37:24 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Upstream Collimator IMG_3391_Modified.JPG
On 19/11/2018:

During the target ladder calibration (see elog entry #41) we also replaced the collimator (thickness ~24mm, diameter 3mm) located immediately
upstream from the target ladder - that is between the upstream and central sections of the chamber. We mounted an aluminium collimator (thickness ~1mm,
Entry  Tue Apr 3 18:16:26 2018, Thomas Chillery, Lizeth Morales, Raffaele Buompane, Lucio Gialanella, Tests - Unpacking and Mounting Chamber Parts  IMG_2832.JPGIMG_2839.JPGIMG_2841.JPG
This morning I unpacked the chamber parts.

I mounted the downstream and central lids with the iris arm hooks to double check we could still successfully mount them, see previous eLog entry
(#25) for photos from this procedure performed in Edinburgh.
Entry  Fri Apr 6 11:39:10 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Lucio Gialanella, Tests - Pumping down chamber and starting electronics tests S2_2323-18_496um_Bias_Vs_Leakage_Current.pngS2_2623-26_505um_Bias_Vs_Leakage_Current.png20180404_Pulser_PreampLid_ON.jpg20180404_Pulser_DisconnectedFromFeedthrough.jpg
On 04/04/18:

We mounted S2 2323-18 (496um) in the downstream position with 12um mylar

We mount the central and downstream iris arms, we set the central arm position to 14.0mm and the downstream arm position toe 1.5mm - opening
Entry  Wed Mar 7 16:56:52 2018, Thomas Chillery, Peter Black, Tests - Modifying Chamber Parts in Edinburgh 
Today we began examining and modifying parts of the chamber shipped from CIRCE to Edinburgh.

The parts shipped were:


Chamber Collar
Central Lid
Downstream Lid
Two Metal Detector Masks
Two Iris Mounts
One
Entry  Tue Mar 27 16:36:01 2018, Thomas Chillery, Peter Black, Tests - Modifying Chamber Parts in Edinburgh 11x
Between 7th to 21st March modifications were made to the top of the CIRCE target chamber.

These modifications address the three key issues highlighted during the February shifts

1. The central S2 detector did not fit, because its connector pins came into contact with the chamber lid
Entry  Fri Apr 6 12:07:52 2018, Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes, Tests - Attempting to solve noise issues, 15 min alpha calibration S2_2323-18_496um_Bias_Vs_Leakage_Current_050418.png
On 05/04/18:

At 9:00 the pressures read ~10mBar inside the chamber (static vacuum). We began venting the chamber.

During venting the cable daisy chain on top of the preamp boxes was removed, the downstream preamp box was removed. It was decided to also removed
Entry  Fri Apr 6 13:33:27 2018, Thomas Chillery, Raffaele Buomparte, David Rapagni, Jeremias Duartes, Tests - Attempting to solve noise issues 
On 05/04/18, after eLog #28

After the alpha calibrationrun Raffaele arrived and started beam tuning for 7Li 2+ at 5.0MeV using a LiO molecular source

We set the target ladder to position II (80.024 mm) - no target frame or target
Entry  Fri Apr 6 14:54:12 2018, Thomas Chillery, Raffaele Buomparte, Tests - Attempting to solve noise issues 
Today we started by mounting the central and downstream preamp box lids.

The pumps were left running overnight, at 9:06 CHUP = 2.1e-5mBar and CHDW = 5.8e-5mBar.

We biased the detectors
Entry  Wed Nov 21 08:53:06 2018, Thomas Chillery, Marialuisa Aliotta, Carlo Bruno, Lizeth Morales, Testing Electronic Chain - No Detectors 
On 19/11/2018:

During the vacuum test - see eLog entry #43 we performed noise tests on the preamplifiers with no S2 detector connected

First we performed a "tabletop" test - the preamplifiers were not connected to the chamber.
Entry  Wed Nov 21 08:45:03 2018, Thomas Chillery, Marialuisa Aliotta, Raffaele Buompane, Carlo Bruno, Testing Chamber Vacuum 
On 19/11/2018:

We mounted the following in the chamber:


Iris frames - no S2 detectors or mylar
Si pin diode mount with 0.9um mylar - no diode
Target ladder with blank
Entry  Sat Feb 17 13:00:51 2018, Thomas Chillery, Test - S2 Detector Bias 
This morning whilst I was setting up the ribbon cabling (see eLog entry #8) I was considering collecting a voltage bias vs leakage current curve for
one/two of the S2 detectors, depending on time available.

This would involve using the central section of the chamber and the straight spacer box to mount the preamp on top of the lid.
Entry  Tue Feb 18 14:39:26 2020, Thomas Chillery, Target Thicknesses Target_List.xls
Excel spreadsheet showing CH2 and natC target thicknesses attached
Entry  Tue Feb 20 09:19:19 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Setup - Testing Chamber Vacuum and Mounting Detectors and Alpha Source 
(Note: Tom Davinson is now in CIRCE until the 21st)

On 19/02/2018 we performed the following:

This morning we gave CIRCE technician Antonio slanted spacer boxes (for mounting preamps) and also the Al box (used for target ladder) for minor
Entry  Fri Feb 16 18:28:42 2018, Thomas Chillery, David Rapagnani, Setup - Testing Chamber Vacuum 
By 16:40 I mounted all three chamber lids.

The central chamber lid includes the diode detector mount, the iris, a vacuum feedthrough, and an actuator with no hook.

The downstream chamber lid includes a vacuum feedthrough and an actuator with no hook.
Entry  Wed Feb 21 10:46:22 2018, Thomas Chillery, Tom Davinson, Raffaele Buompane, David Rapagnani, Setup - Pulser Settings and 20/02/2018 Pulser Walkthrough BKG_zoombeam1.jpg
The PB-5 Pulse Generator settings are as follows:

Fall Time = 100us

Rate = 2.00Hz
Entry  Thu Feb 15 17:45:07 2018, Thomas Chillery, Raffaele Buompane, Setup - Problem: Connecting the actuator arm to the iris aperture arm ApertureAdjustmentHooks.JPGApertureArm_TwoScrews.JPGIrisArmProblemSketch.JPG
After lunch we attempted to connect the actuator arms to the iris arm used to change the iris diameter. We need two iris diameters: fully open for experiment
measurements and a 5mm diameter for beam focusing

To do this the original design uses a cuboid with two rods, one rod is connected to the actuator arm, and the other rod is connected to the iris
Entry  Thu Feb 15 17:34:28 2018, Thomas Chillery, Raffaele Buompane, Setup - Mounting Target Chamber Sections IMG_2621.JPG
This morning both myself and Raffaele mounted the beamline section of the target chamber.

We also mounted the turbo located immediately downstream from the target chamber, see attached IMG_2621.jpg image - the beam will enter from
the right of the image
Entry  Fri Feb 16 18:10:34 2018, Thomas Chillery, David Rapagnani, Setup - Electronics Rack and Aperture Iris 
This morning we moved the electronics rack to within ~2.5m of the target chamber, leaving room for the ribbons cables of ~5m length which connect the
preamps to the amplifiers in the rack.

Then I continued in attempts to solve the iris arm problem, see eLog entry #3.
Entry  Sat Feb 17 12:35:25 2018, Thomas Chillery, Setup - Electronic Cabling IMG_2697.JPGIMG_2702.JPGIMG_2704.JPGIMG_2706.JPG
Between 9:00 to 12:30 this morning Filipo was working on the weekend 14C measurements, allowing me to work in the lab during this period.

I unpacked four MALU 4532 Lecroy Logic Modules (sent to CIRCE two weeks ago). Three of these modules were installed into the 1434A CAMAC crate,
which already had one module installed from the July 2017 shift. One module remains out of the crate as a spare.
Entry  Fri Feb 23 13:15:05 2018, Thomas Chillery, Raffaele Buompane, David Rapagnani, Setup - Beam Tuning and Prepare Chamber for Measurement at 3.45MeV 7Li - Night of 22nd 
Checking SRIM 3.5 MeV 7Li is stopped in 9.06um mylar or 10.09 um CH2.

After the long run at 3.0MeV on 22/02/2018 we decided to put the 12um mylar back in front of the S2 and start tuning the beam for 3.45MeV 7Li.
We also decided to tune the beam to a higher current of ~ 100pA to try and improve the detection rates.