DESPEC |
 |
|
Message ID: 464
Entry time: Tue May 17 06:58:51 2022
|
Author: |
OH |
Subject: |
Tuesday 17th May |
|
|
08:00 Still have beam for the time being.
Currently on file R4_2049
FEE Stats - attachment 1
FEE Temps ok - attachment 2
Bias and leakage currents - attachment 3
System wide checks all ok *except aida09 fails clock check with value 6 which is ok*
Plan for the morning is once beam is lost is Ge group will enter and place source on the snout to perform efficiency measurement.
Once they have left the area and are taking data a pulser walkthrough will be performed.
Patrick can then have access to the system
08:16 Beam taken away
Data taken stopped on file R4_2055
Will perform a pulser walkthrough now
Pulser walkthrough started on R5
1V->0.1V in 0.1V steps
Pulser setting - attachment 4
p+n pulser peaks - attachment 5
n+n pulser "peaks" - attachment 6 |
|
|
|
|
|
|
|
|
|
|
|
|