| ID |
Date |
Author |
Subject |
Text |
 |
|
517
|
Wed Jan 18 13:40:33 2023 |
PJCS TD | MACB settings with either Emulator or VITAR | When using the VETAR connected
to the HDMI port of the root MACB the settings
for all the MACB in the system 0x3. |
   |
|
16
|
Wed Jan 23 09:25:55 2019 |
CA, TD, NH, VP | MACB and setup pics 23.01.19 | Pictures of leaking cooling pipe
MACB switch settings
|
11x |
|
292
|
Tue May 4 14:05:48 2021 |
NH | MACB Cables | During the installation of the 4 new HDMI
cables for aidas13-16 the HDMI cables between
the MACB Root and the MACB leaves were looped |
 |
|
435
|
Thu May 12 22:49:39 2022 |
BA, MA | Low Rates | The rate is very low in all aida, not sure
. |
|
|
441
|
Fri May 13 06:56:14 2022 |
OH, BA, MA | Low Rates |
|
|
|
460
|
Mon May 16 14:07:06 2022 |
TD | Lost activity monitor | |
|
|
539
|
Fri Mar 15 16:29:57 2024 |
NH | Leakage currents | The behaviour of the DSSSD leakage current
at low voltages and during biases is unusual
and varies depending on how the adapter boards |
|
|
686
|
Thu Jan 9 16:25:51 2025 |
TD | LEC fast comparator threshold too low |
LEC fast comparator has been set to 0x2 (200keV)
which is *very* low and means the fast comparator |
|
|
687
|
Thu Jan 9 17:36:50 2025 |
TD | LEC fast comparator threshold too low | >
> LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
688
|
Thu Jan 9 17:56:14 2025 |
TD | LEC fast comparator threshold too low | > >
> > LEC fast comparator has been set to 0x2
(200keV) which is *very* low and means the |
|
|
689
|
Fri Jan 10 10:03:43 2025 |
TD | LEC fast comparator threshold too low | > > >
> > > LEC fast comparator has been set to
0x2 (200keV) which is *very* low and means |
|
|
18
|
Thu Jan 24 10:21:26 2019 |
CA, TD, NH, VP | January 24th 2019 | 10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
|
7x |
|
17
|
Wed Jan 23 17:03:08 2019 |
CA, TD, NH, VP | January 23rd 2019 | Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra |
6x |
|
15
|
Wed Jan 23 08:12:01 2019 |
CA, TD, NH, VP | January 22nd 2019 | Attachment 1 - 1.8.W waveform spectra with
pulser signal
|
   |
|
555
|
Tue Apr 2 12:36:25 2024 |
JB, CC, NH | Installing FEE64s of DSSSD2 cont. | Some additional checks
- check 'top
hat' electrical isolators are correctly |
|
|
552
|
Wed Mar 27 14:22:35 2024 |
JB, NH | Installing FEE64s of DSSSD2 | Mounted on frame:
DSSD 1 (Upstream) :
3208-2/3208-5/3208-8 |
14x |
|
553
|
Thu Mar 28 09:18:53 2024 |
TD | Installing FEE64s of DSSSD2 | Some additional checks
- check 'top hat' electrical
isolators are correctly installed at each |
|
|
106
|
Wed Dec 11 10:58:52 2019 |
NH | Initital Dec. Analysis | Fig 1: 2D hit pattern of each AIDA DSSD for
MBS run 24 (40Ar primary beam, centred)
|
11x |
|
227
|
Fri Apr 16 02:15:12 2021 |
NH | Implants/Punchthrough | Rate with beam < 1000 Hz still
Not Uranium but some fragments possibly produced |
|
|
7
|
Thu Sep 20 09:16:31 2018 |
TD | Images of AIDA setup for DESPEC | Attachment 1 - detail of MSL type BB18(DS)-1000
p+n junction side strips, bias ring, multiple
guard rings, filed
|
9x |