AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 27 of 37  ELOG logo
Entry  Mon May 16 07:03:16 2022, MS, OH, Monday 16th May 08:00-16:00 17x
08:00 Took over the night shift from Tom (Attachments 1-3)

10:00: Attachement 4-6

around 10:30: Beam went off (Attachment 7)
Entry  Wed May 19 09:09:27 2021, MS, JS, OH, May 16 08:00-24:00 21x
16th May 08:00 - 12:00 shift
Author: MS
Entry  Sat Apr 17 15:29:27 2021, MS, Saturday 17 April 16:00-20:00 2021 6x
16:21

Entry  Mon Apr 19 06:46:15 2021, MS, Monday 19 April 07:47-12:00 2021 9x
07:47

    
Entry  Wed Apr 21 06:56:42 2021, MS, Wednesday 21 April 08:00-12:00 2021 10x
8:00

Entry  Wed Jun 22 07:12:46 2022, MS, Wednesday 22 June 8:00-16:00 16x
Took over the night shift from Tom.

8:10 : attachments 1-3

10:00 : attachments 4-6
Entry  Sat Jun 25 06:55:07 2022, MS, Saturday 25 June 2022 8:00-16:00 15x
Took over the night shift from Tom.

7:00 The beam is back.

8:00 : attachments 1-3
Entry  Thu Oct 30 10:06:21 2025, MP, NH, Setup and data taking with 207Bi Screenshot_from_2025-10-30_11-07-55.pngScreenshot_from_2025-10-30_11-07-39.pngScreenshot_from_2025-10-30_11-07-29.pngScreenshot_from_2025-10-30_11-08-07.pngScreenshot_from_2025-10-30_11-10-06.png
- Initialised the Merger and Tape server

- loading of settings: EXPERIMENTS/AIDA/2025Oct29-16.11.06

- aida16 very noisy (attachments 3,4), slow comparator thresholds was risen to 500 keV, until reducing its deadtime to 0
    Reply  Thu Oct 30 16:43:36 2025, MP, NH, Setup and data taking with 207Bi 
Data taking and DAQ stopped now (17.40)




Quote:



- Initialised the Merger and Tape server
    Reply  Tue Nov 4 16:34:47 2025, MP, NH, Bi207 source data, 700keV 
Some FEES were not acquiring data for some reason we could not understand. We lowered the thresholds to 200 keV, then rose them again to 700 keV. It
seems they are now acquiring. We start data taking again.




Quote:


Entry  Tue Jul 22 17:00:26 2025, MP, CC, Status Screenshot_from_2025-07-22_17-51-52.pngScreenshot_from_2025-07-22_17-59-20.png
Test with shielded HV cables for both detectors.

The FWHM for ch1 is now 184 ch.

Yesterday cables for cards 5, 6, 10, 11, 12, 14, 16 were partially connected (only 1 out of 2 flat cables was in), now both are connected.
Entry  Mon Jul 21 13:01:19 2025, MP, Status Screenshot_from_2025-07-21_14-00-23.pngScreenshot_from_2025-07-21_14-00-39.png
Status before grounding checks
Entry  Wed Oct 29 08:12:35 2025, MP, Further setup for 207Bi test IMG_5959.jpegIMG_5958.jpegIMG_5957.jpegScreenshot_from_2025-10-29_09-23-32.pngScreenshot_from_2025-10-29_09-32-52.png
Inspection of side FEEs (2,6,4,8) and possible grounding improvements:

- all screws and nuts for copper connections were tightenedFee

- FEE 6 was isolated from the copper connection grounding FEE2 with insulating tape (attachment 1)
Entry  Tue Nov 4 14:57:19 2025, MP, Bi207 source data, 700keV Screenshot_from_2025-11-04_15-49-20.pngScreenshot_from_2025-11-04_15-33-11.pngScreenshot_from_2025-11-04_15-28-42.pngScreenshot_from_2025-11-04_15-28-35.png
- Bias and basic checks: the pulser FWHM appears to be ~170, which is the same we have obtained at the end of last week.

- Initialised the Merger and Tape server

- loading of settings: EXPERIMENTS/AIDA/2025Nov03-16.21.44
    Reply  Tue Nov 4 17:29:28 2025, MP, Bi207 source data, 700keV 
Anydesk has crashed. I am not able to set it up again. I switch off bias and fees




Quote:



Some FEES were not acquiring data for some reason we could not understand. We lowered the thresholds to 200 keV,
    Reply  Fri Nov 7 10:47:29 2025, MP, 207Bi source test - data taking 
DAQ stopped at ~17.30 due to anydesk failure

Entry  Sun Apr 18 17:27:44 2021, ML-OH, system wide checks 17x
system wide checks at 6pm CET

##################################################

Difference noted from previous shift:
Entry  Sun Apr 18 19:05:33 2021, ML-OH, All spectra reset 
 All spectra reset at 8pm CET.

 
Entry  Sun Apr 18 21:43:01 2021, ML-OH, system wide checks 20x
New System wide check 10pm CET

Clock status test result: Passed 12, Failed 0

Understand status as follows
Entry  Fri Apr 16 05:13:09 2021, ML, system wide checks 16x
system wide checks:

Done around 4am.

#################################
ELOG V3.1.3-7933898