Fri Aug 16 15:09:05 2019, NH, Aida Waves (All FEEs) 12x
|
Included waves for all 12 FEEs
FEES 1, 5, 9 all show this HF noise on it, and are all located at the top of the AIDA mount.
Connections: HV from DSSD (-ve) is in FEE9 |
Fri Aug 9 12:33:14 2019, NH, Aida Test 9/8/19 - FEES 1-6
|
The water issue has been resolved - merely incorrect temperature guages (replaced). Water is 20 C as required.
S4 conditions at 13:12 CEST
26.5 C / 47.2 % / Td = 14.3 C |
Fri Jun 28 15:05:49 2019, NH, Aida 28/6/2019 - WATER OFF
|
The humidity sensor hasn't reported humdities under 90% yet. In order to try and help dry the pipes and turn AIDA the water has been turned off the
weekend.
Sunday temperatures might reach 40 C which means it may struggle anyway. |
Mon Jul 8 16:02:52 2019, NH, PJCS, Aida 28/6/2019 - WATER OFF
|
It occurs to to wonder if there is now water inside the modules. If the metal of the cooling plates is damp on the outside then it is safe to assume
there is water on the inside too . Can I suggest that one of the modules is dismounted, disassembled and checked?
Patrick |
Fri Sep 3 13:39:42 2021, OH, Additional noise tests performed at GSI   
|
Contents of an email from NH to OH and TD about tests performed on an additional bias supply:
This email was sent to you by someone outside the University.
|
Thu Dec 19 13:06:02 2019, TD, NH, AIDA@DESPEC To Do list
|
FAIR phase 0 DESPEC experiments are scheduled March-May 2020 see
https://www.gsi.de/en/work/organisation/scientific_boards/user/beam_time.htm
|
Thu Sep 6 15:25:19 2018, OH, TD, AIDA@DESPEC Setup Photos
|
|
Tue Nov 12 13:22:19 2019, OH, NH, CA, AIDA09 Replacement
|
ASIC 1 on FEE9 was not producing signals.
A new HDMI cable was installed but still no signals.
|
Thu Jul 24 13:36:34 2025, CC, MP, NK, AIDA05 connected and disconnected compared to AIDA09 10x
|
HT cable shielded, HT of upstream AIDA from iseg, HT of downstream AIDA from CAEN. Both channel 0 and 1 of CAEN are on, even though
there is just one channel connected. During this test, some parallele tests are being done on BB7 Mesytec. In general, middle tile: detector disconnected
from preamps but preamps connected on the other side. Right tile: detector connected to preamps, cable shielded but preamps disconnected on the other |
Wed Jul 10 10:46:05 2019, NH, AIDA/Water 10.07.2019
|
S4 Conditions:
25.2 C, 35.3% RH, Td = 8.8 C
Water temperature: 20 C |
Tue Oct 19 16:17:49 2021, OH, AIDA-gsi server to centos 7
|
Following advice of CU have updated the server to centos 7.
To do this a new 500GB SSD was purchased and installed in the enclosure and a clean install of centos7 was installed to this.
|
Thu Sep 13 17:21:59 2018, TD, AIDA upstream window
|
The upstream window of the AIDA detector assembly consists of 2x 50um aluminized mylar |
Wed Mar 24 10:31:03 2021, TD, AIDA to do (or to understand) list
|
In no particular order
|
Mon Dec 16 13:07:04 2024, JB, MP, CC, AIDA timing test 16x
|
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG
Day2:
10:14 we set up the detector with the pulser in BB7 and started biasing the detector and setting up the DAQ. Water flow and temperature check, |
Tue Dec 17 12:45:36 2024, JB, MP, CC, AIDA timing test  
|
Quote:
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG |
Wed Jan 8 16:47:05 2025, JB, MP, CC, AIDA timing test
|
Quote:
https://elog.gsi.de/despec/Implantation+Stack/9?suppress=1 - Day 1 ELOG |
Thu Jan 9 12:46:43 2025, JB, MP, CC, AIDA timing test   
|
Quote:
|
Wed Feb 16 10:32:52 2022, PJCS, AIDA software changes and some suggestions
|
The Pi console monitor program now outputs a full date/time to file for each line of report.
The System Wide Checks has been upgraded to include a check of the PLL lock monitor counters. A baseline is taken when the software starts, or
at the users command, then subsequent operation of the command compares the current counter value with the baseline. There are two PLLs on the pcb, LMK3200, |
Wed Jan 8 10:08:29 2025, JB, GB, SD, MP, CC, JG, AIDA noise test with platform in position   
|
Yesterday we spent time essentially performing a dry run to get AIDA DAQ and bPlast into the time sorter, there were some issues with the AIDA mbs PC
x86l-119 which was related to some boot issue, it was booting to a newer version of debian while the Relay for AIDA to MBS is on an older version (scratch)
(the machine is quite old). We spent a bit of time getting the thresholds correct for each of the ASICs. In the end we just elected to have a blanket level |
Tue Apr 8 08:52:39 2025, TD, AIDA grounding 
|
AIDA DSSSDs and FEE64-DSSSD cabling are electrically isolated (by design) from snout, mounting rods and support assembly.
FEE64-DSSSD ribbon cables screened by 3M 1245 Cu foil, drain wire to FEE64 adaptor PCB
|