AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 29 of 36  ELOG logo
ID Date Author Subjectdown Text Attachments
  65   Fri Aug 16 15:09:05 2019 NHAida Waves (All FEEs)Included waves for all 12 FEEs

FEES 1, 5, 9 all show this HF noise
on it, and are all located at the top of
 12x 
  59   Fri Aug 9 12:33:14 2019 NHAida Test 9/8/19 - FEES 1-6The water issue has been resolved - merely
incorrect temperature guages (replaced).
Water is 20 C as required.
  
  54   Fri Jun 28 15:05:49 2019 NHAida 28/6/2019 - WATER OFFThe humidity sensor hasn't reported
humdities under 90% yet. In order to try
and help dry the pipes and turn AIDA the
  
  56   Mon Jul 8 16:02:52 2019 NH, PJCSAida 28/6/2019 - WATER OFFIt occurs to to wonder if there is now
water inside the modules. If the metal of
the cooling plates is damp on the outside
  
  380   Fri Sep 3 13:39:42 2021 OHAdditional noise tests performed at GSIContents of an email from NH to OH and TD
about tests performed on an additional bias
supply:
 DSO_Lab_NoP.jpgDSO_Lab_1.jpgDSO_Lab_50V.jpgDSO_Lab_NoCable.jpg 
  112   Thu Dec 19 13:06:02 2019 TD, NHAIDA@DESPEC To Do listFAIR phase 0 DESPEC experiments are scheduled
March-May 2020 see
  
  2   Thu Sep 6 15:25:19 2018 OH, TDAIDA@DESPEC Setup Photos    
  92   Tue Nov 12 13:22:19 2019 OH, NH, CAAIDA09 ReplacementASIC 1 on FEE9 was not producing signals.

A new HDMI cable was installed but still
 FEE-SerialNumber.txt 
  717   Thu Jul 24 13:36:34 2025 CC, MP, NKAIDA05 connected and disconnected compared to AIDA09HT cable shielded, HT
of upstream AIDA from iseg, HT of downstream
AIDA from CAEN. Both channel 0 and 1 of CAEN
 10x 
  57   Wed Jul 10 10:46:05 2019 NHAIDA/Water 10.07.2019S4 Conditions:

25.2 C, 35.3% RH, Td = 8.8 C

Water temperature: 20 C
  
  384   Tue Oct 19 16:17:49 2021 OHAIDA-gsi server to centos 7 Following advice of CU have updated the server
to centos 7.
  
  4   Thu Sep 13 17:21:59 2018 TDAIDA upstream window
The upstream window of the AIDA detector
assembly consists of 2x 50um aluminized mylar
  
  206   Wed Mar 24 10:31:03 2021 TDAIDA to do (or to understand) list
In no particular order
  
  677   Mon Dec 16 13:07:04 2024 JB, MP, CCAIDA timing testhttps://elog.gsi.de/despec/Implantation+Stack/9?suppress=1
- Day 1 ELOG

Day2:
 16x 
  678   Tue Dec 17 12:45:36 2024 JB, MP, CCAIDA timing test 




 IMG_2536.jpeg20241217_141148.jpg20241217_141206.jpg 
  683   Wed Jan 8 16:47:05 2025 JB, MP, CCAIDA timing test 




 Screenshot_from_2025-01-08_17-51-51.png 
  684   Thu Jan 9 12:46:43 2025 JB, MP, CCAIDA timing test 




 AIDAfasttime_bPlastWRdt_AIDA10.pngAIDACalAdcFasttime.pngAIDAfasttime_bPlastWRdt_AIDA10_nopulser.pngCentrepeak_gauss_fit.png 
  396   Wed Feb 16 10:32:52 2022 PJCSAIDA software changes and some suggestionsThe Pi console monitor program now outputs
a full date/time to file for each line of
report.
  
  681   Wed Jan 8 10:08:29 2025 JB, GB, SD, MP, CC, JGAIDA noise test with platform in positionYesterday we spent time essentially performing
a dry run to get AIDA DAQ and bPlast into
the time sorter, there were some issues with
 Screenshot_from_2025-01-09_09-32-08.pngScreenshot_from_2025-01-09_09-35-11.pngScreenshot_from_2025-01-09_09-32-20.pngScreenshot_from_2025-01-09_09-31-58.png 
  702   Tue Apr 8 08:52:39 2025 TDAIDA grounding
AIDA DSSSDs and FEE64-DSSSD cabling are electrically
isolated (by design) from snout, mounting
 powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg 
ELOG V3.1.4-unknown