AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DESPEC, Page 29 of 35  ELOG logo
    Reply  Thu Jan 9 12:46:43 2025, JB, MP, CC, AIDA timing test AIDAfasttime_bPlastWRdt_AIDA10.pngAIDACalAdcFasttime.pngAIDAfasttime_bPlastWRdt_AIDA10_nopulser.pngCentrepeak_gauss_fit.png
Entry  Wed Feb 16 10:32:52 2022, PJCS, AIDA software changes and some suggestions 
Entry  Wed Jan 8 10:08:29 2025, JB, GB, SD, MP, CC, JG, AIDA noise test with platform in position Screenshot_from_2025-01-09_09-32-08.pngScreenshot_from_2025-01-09_09-35-11.pngScreenshot_from_2025-01-09_09-32-20.pngScreenshot_from_2025-01-09_09-31-58.png
Entry  Tue Apr 8 08:52:39 2025, TD, AIDA grounding powerstax-ms1u_instructionmanua.pdf20250408_095624.jpg
Entry  Thu Sep 20 09:39:17 2018, TD, AIDA downstream window 
Entry  Thu May 12 10:10:51 2022, TD, OH, AIDA data throughput 15x
Entry  Sat May 7 13:27:39 2022, TD, AIDA configuration 
Entry  Fri Jan 31 13:48:29 2025, JB, AIDA analysis from HI-DESPEC meeting 20.11.2024 
Entry  Thu Aug 15 14:09:39 2019, NH, AIDA Waveforms 10x
Entry  Thu Mar 21 13:59:08 2019, NH, AIDA Water 
Entry  Mon May 2 13:08:49 2022, NH, AIDA Updates 2 May elog_temps1.pngalpha_1d.png
    Reply  Tue May 3 14:15:17 2022, NH, AIDA Updates 2 May 
Entry  Fri Dec 16 14:02:12 2022, NH, AIDA System off for christmas break 
Entry  Mon Feb 1 15:19:07 2021, NH, AIDA Status Feb 2021 
    Reply  Sat Feb 6 10:45:55 2021, NH, AIDA Status Feb 2021 pregrd050222_E.pngpregrd050221_O.pngpostgrd050221_O.pngpostgrd050221_E.png
Entry  Fri Mar 22 13:32:55 2019, NH, AIDA Startup @ 22.03.2019 20190323Bias.png20190322FEETemps.png
Entry  Wed May 22 20:10:19 2024, NH, CC, HMA, MV, ZC, KZ, AIDA Snout Remounted 9x
Entry  Tue Aug 30 13:48:32 2022, NH, AIDA Single Switch Configuration 
Entry  Wed Mar 20 15:35:10 2019, NH, AIDA Setup @ GSI 
Entry  Mon Feb 22 18:18:47 2021, NH, AIDA Rates/Situation  8x
ELOG V3.1.4-unknown