ID |
Date |
Author |
Subject |
Text |
|
35
|
Mon Mar 25 14:44:33 2019 |
NH | Merger issues | Plastic electronics have now been installed.
Water is not leaking still.
FEE64s powered on at 15:00 to test |
|
34
|
Fri Mar 22 15:44:20 2019 |
NH | End of 22.03.2019 | End of the day - Detector unbiased and
FEE64s turned off for the weekend as they
won't be monitored. |
|
33
|
Fri Mar 22 14:31:24 2019 |
NH | A few more setup notes I forgot | Extra FEE information:
HV braid (0 V) goes into FEE10
(beam left) with LK1 jumper |
|
32
|
Fri Mar 22 13:47:32 2019 |
NH | Resolution Checks | Pulser widths of AIDA modules, resolution
is fairly typical. AIDA09 still noisier than
other DSSD channels. |
|
31
|
Fri Mar 22 13:32:55 2019 |
NH | AIDA Startup @ 22.03.2019 | FEEs have been on this morning, temperatures
attached
Leakage current attached |
|
30
|
Thu Mar 21 15:45:48 2019 |
NH, AS, SA, MP | Snout Mounting & DSSD Bias | The AIDA snout (with single DSSD and plastic)
has been mounted in S4 cave again. DSSD was
connected to the outer 4 FEEs again. |
|
29
|
Thu Mar 21 14:10:10 2019 |
NH | FEE Temperatures | All 12 FEEs powered up, and temperatures
are OK.
Passed ASIC checks and system wide |
|
28
|
Thu Mar 21 13:59:08 2019 |
NH | AIDA Water | The AIDA water system has been repaired
and not leaking.
The interlock did not light immediately, |
|
27
|
Wed Mar 20 15:35:10 2019 |
NH | AIDA Setup @ GSI | Currently
- 1 DSSD and Plastic is in the
AIDA snout, which is not mounted |
|
26
|
Sun Feb 3 16:01:49 2019 |
TD | Updated analyses GSIJan19/R1_0 - R10_0 |
Summary statistics for WR test data files
R1_0, R2_0, R3_0, R4_0, R7_0 and R10_0 (attachments |
7x |
25
|
Fri Jan 25 12:33:03 2019 |
NH | aida-gsi Access | If you have a GSI account it should be
possible to connect to aida-gsi remotely
via the following |
|
24
|
Fri Jan 25 12:26:17 2019 |
NH | Raspberry Pi Startup & Information | Two raspberry pis:
nnrpi1 - FEE64 system consoles
nnrpi2 - AC Mains Relay & CAEN |
|
23
|
Fri Jan 25 09:54:12 2019 |
CA, TD, NH, VP | 25th January 2019 | 09.30: AIDA still running, not writing to
file
Still running ok
|
8x |
22
|
Thu Jan 24 17:16:32 2019 |
CA, TD, NH, VP | MACB time switch settings | AIDA@DESPEC MACB time switch settings before
and after WR are as follows.
|
|
21
|
Thu Jan 24 14:53:26 2019 |
TD | Analyses GSIJan19/R2_0 - R4_0 |
Attachment 1 - summary analysis R2_0
|
|
20
|
Thu Jan 24 13:29:40 2019 |
TD | Analysis of GSIJan19/R1_0 |
Analysis of file GSIJan19/R1_0 (white rabbit
data)
|
|
19
|
Thu Jan 24 10:26:09 2019 |
VP, TD, CA, NH | Start up Merger | 1) Click on item "Merger MK2" in top panel
This kills any existing Merger existence
and loads a new copy.
|
|
18
|
Thu Jan 24 10:21:26 2019 |
CA, TD, NH, VP | January 24th 2019 | 10.30 AIDA setup and DAQ start complete
writing to file TapeData/NULL/R1
|
7x |
17
|
Wed Jan 23 17:03:08 2019 |
CA, TD, NH, VP | January 23rd 2019 | Post White Rabbit update
Attachment 1 - 1.8.W pulser waveform spectra |
6x |
16
|
Wed Jan 23 09:25:55 2019 |
CA, TD, NH, VP | MACB and setup pics 23.01.19 | Pictures of leaking cooling pipe
MACB switch settings
|
11x |