AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS  ELOG logo
Message ID: 109     Entry time: Mon Jun 10 04:18:24 2019
Author: Ale, Jose 
Subject: New Configuration File 
File:  20190610_1145_Conf_DTAS.xlsx

Several changes and corrections
Naming: V2A8C1 -> Aux01, ...

New or corrected
Aux13 -> LP_out (puse out of light pulser)
Aux15 -> DTpulser (Out of GSI clock triggering LP)
Aux16 -> SyncPulser (Out of GSI clock send out for synchronization with AIDA & BigRIPS)

Ranges changed
Aux09, ERefAn

We observed that LP_out was counting less than the other two
so we tried to check DACQ parameters. We basically change nothing
Only activated "CFD time"
Note that pulse out is a very strange signal:
Negative(?),-400mV offset, 200mV high
In the DACQ is treated as positive signal with a large negative offset.
Attachment 1: 20190610_1145_Conf_DTAS.xlsx  37 kB  Uploaded Mon Jun 10 09:06:47 2019
ELOG V3.1.4-unknown