AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS, Page 5 of 8  ELOG logo
ID Date Author Subject Text Attachments
  63   Tue May 28 05:43:41 2019 A. Algora133Ba source. (IR052 from the third floor)Start: 13:43

Stop: 14:05

Comments: The source looks also
  
  62   Tue May 28 05:30:03 2019 A. AlgoraReference detector threshold changedAgain the Reference detector was firing
mainly in the noise. Threshold increased
to 5000 !!!!
 Screenshot_from_2019-05-28_13-29-46.png 
  61   Mon May 27 13:58:03 2019 A. AlgoraBackground, no lmd, AIDA in, no sources aroundStart: 21:59

Stop: 13:15 (next day, 28/05)

Rates: 1.9-2.3 (dynodes), 1.8-1.9
 201905281315_background_AIDA_in.root 
  60   Mon May 27 13:50:54 2019 A. Algorapreparation directory movedThe preparation directory was moved to
/data/DRikenPreparation (from its first place
/home/dacq/DRikenPreparation) because the
  
  59   Mon May 27 12:54:48 2019 A. AlgoraReference detectorThe reference detector was very noisy.
The threshold has been changed from 2000
to 3200. We should look at this more carefully.
 Screenshot_from_2019-05-27_20-54-21.png 
  58   Mon May 27 09:12:22 2019 A. AlgoraBackground, with AIDAStart: 17:13

Stop: 18:03

Rates: 1.8 kHz (Dynodes), 1.8 kHz
 Screenshot_from_2019-05-27_17-50-45.pngScreenshot_from_2019-05-27_17-51-02.png201905271803_background_AIDA_in.root 
  57   Mon May 27 08:26:20 2019 A. AlgoraCo source on top of AidaStart: 16:28

Stop: 17:03

Rates: 14.4 kHz (Dinodes), 12.8
 201905271703_60Co_AIDA_in.root 
  56   Mon May 27 07:34:58 2019 A. AlgoraHV statusEMPTY00    │  
0.0 V 1500.0 uA    0.5 V   
0.5 uA Off               
  
  55   Mon May 27 07:18:26 2019 A. AlgoraAIDA PlastikNishimura san found the module used for
the AIDA plastik in the last BRIKEN run.
We put it instead of the TFA. It was kept
  
  54   Mon May 27 07:15:06 2019 A. Algora137Cs run, AIDA out, source in the centerStart: 15:15

Stop: 15:31

Lmd: 137Cs_source_201905271514_187.dlt
 201905271531_137Cs.root 
  53   Mon May 27 07:11:22 2019 A. Algoradetectors realigned with CsSmall alignment corrections were needed,
of the order of 0.5-1V.

All detectors were realigned
 Screenshot_from_2019-05-27_15-13-09.png 
  52   Sat May 25 07:04:52 2019 A. AlgoraAncilliary card used channels until nowFor the moment there are three channels
connected.

Channel 5 is AIDA plastic,
  
  51   Sat May 25 06:53:35 2019 A. AlgoraBackground, no dlt files, last config fileStart: 14:53 (May 25)

Stop: 14: 37 (May 27)

Root: 201905271437_background.root
 20190525_Conf.xlsx 
  50   Sat May 25 03:42:12 2019 A. AlgoraBackground, no sources around, Aida outStart: 11:42

Stop: 14:45

Lmd: Background_201905251141_182.dlt
 201905251445_background.root 
  49   Sat May 25 02:11:09 2019 A. Algora60Co source, red box, no sources around, No AIDAStart: 10:27

Stop: 11:31

Root: 201905251131_60co.root
 201905251131_60co.root20190525_Conf.xlsx 
  48   Fri May 24 12:32:48 2019 A. AlgoraBackground measurement, no sources aroundStart: 20:32

Stop: 10:05

Lmd: Background_201905242032_111.dlt
 201905242111_background.root2019052521005_background.root 
  47   Fri May 24 10:57:37 2019 A. Algora60Co, AIDA out, possitioned 5 mm deeperStart: 18:58

Stop: 20:20

Lmd:  60Co_source_201905241858_095.dlt
 201905242020_60Co.root 
  46   Fri May 24 09:43:49 2019 A. Algora137Cs source, AIDA out, to check assymetryStart: 17:43

Stop: 18:51

Root: 201905241851_137Cs.root
 201905241851_137Cs.root 
  45   Fri May 24 08:33:52 2019 A. Algorabackground, AIDA is outStart: 16:35

Stop: 17:30

Rates: 1.5 kHz (Dynodes), 1.8 kHz
 201905241730_background.root 
  44   Fri May 24 07:57:51 2019 A. AlgoraLead shielding heigth increasedThe aluminium plate of 3 cm thickness arrived
and the lead shielding was dismounted and
mounted again. We left a narrower hole in
  
ELOG V3.1.4-unknown