AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  DTAS, Page 4 of 8  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Fri May 31 09:49:08 2019, A. Algora, Backgroun, beam on 
Start: 17:49

Stop: 22:11

Root: 201905312211_background_AIDA_in.root
Entry  Fri May 31 07:03:37 2019, A. Algora, Background, beam on, rates at F11PL and AIDAPL Screenshot_from_2019-05-31_17-36-38.png
Start: 15:04

Stop: partial (17:43), 201905311743_background_AIDA_in.root (file corrupt again), system will be restarted

Root:
Entry  Fri May 31 06:48:58 2019, A. Algora, T spectra for AIDA and F11 plastics 20190531_Conf_1.xlsx
T spectra for AIDAPL and F11PLL and F11PLR are defined from now on. The ancilliary card was not saving the CFD values for all channels.

It was modified in order to have those spectra. A new configuration file will be saved. See in the attachment
Entry  Fri May 31 02:41:55 2019, A. Algora, Background, beam on 7x
Start: 10:42

Stop: 11:49

Root: 201905311149_background_AIDA_in.root
Entry  Thu May 30 12:08:01 2019, A. Algora, background, dacq restarted before the measurement 201905311017_background_AIDA_in.root20190530_Conf.xlsx
Start: 20:09

Stop: 10:17

Root:  201905311017_background_AIDA_in.root
Entry  Thu May 30 08:57:34 2019, A. Algora, Background, no beam + beam, file not saved 
Start: 16:57

Stop:

Comments: first part no beam, but later with beam
Entry  Thu May 30 08:43:29 2019, A. Algora, Background no beam 
Start: 16:43

Stop: 16:56

Root: 201905301656_background_AIDA_in.root
Entry  Thu May 30 07:21:41 2019, A. Algora, Background with beam on 
Start: 15:21

Stop: 16:41

Root: 201905301642_background_AIDA_in.root
Entry  Thu May 30 06:46:10 2019, A. Algora, Background with beam 201905301448_background_AIDA_in.root201905301457_background_AIDA_in.root
Again a new test with the beam on. At the begining the beam was off and it can be noticed.

There is a lead wall after F11 plastic and in the polyethilene block there are two lead bricks to block the beam to AIDA.

201905301448_background_AIDA_in.root
Entry  Thu May 30 06:41:18 2019, A. Algora, Background with the beam 
There was an small increase in the counting rate of the detectors after the beam was delivered. The rate at
F7 was of the order of 5 kHz. But remember that there is a lead wall protecting the detector. Root file saved. Look at TSumA for example

Root: 201905301442_background_AIDA_in.root
Entry  Thu May 30 02:44:56 2019, A. Algora, Background, just a test 20190530_Conf.xlsx
Start: 11:01

Stop: 13:37

Root: 201905301337_background_AIDA_in.root
Entry  Thu May 30 02:03:33 2019, A. Algora, Ref detector position changed, AIDA plastik HV changed 20190530_Conf.xlsx
The position of the reference detector in the ancilliary card was changed from channel 10 to channel 9. Remember that this is important

in relation to all files saved until now.

The HV of AIDA plastic was changed from 1300 V back to 1000 V.
Entry  Wed May 29 10:01:10 2019, A. Algora, Background, no lmd, AIDA in 201905291833_background_AIDA_in.root201905300953_background_AIDA_in.root
Start: 18:02

Stop: 18:33, partial file (201905291833_background_AIDA_in.root), Stop: 09:53 saved also next day (30/05) 201905300953_background_AIDA_in.root

Comments: AIDA in, Bigrips is doing settings (105Te to my best knowledge). There is a lead wall before our setting. No apparent change in the
Entry  Wed May 29 09:49:25 2019, A. Algora, New configuration file 20190529_Conf.xlsx
New configuration file after a few small changes in thresholds.
Entry  Wed May 29 09:08:11 2019, A. Algora, AIDA plastic setting changed 
AIDA plastic changed.

HV was at 1000 V, it was changed to 1300 V

Coarse gain was changed to x5, Fg remains as it was.
Entry  Wed May 29 08:29:26 2019, A. Algora, latest conf file 20190528_Conf.xlsx
Latest configuration file from 28 of May
Entry  Wed May 29 07:04:19 2019, A. Algora, F11 plastic connected 
F11 plastic has been connected to our dacq as it was in the earlier BRIKEN setting.

The detector cables were followed and connections checked.

The outputs of the detector (L and R) go through an Ortec TFA 474 with the following settings:
Entry  Wed May 29 02:07:20 2019, A. Algora, Irradiation for 24Na 
Irradiation of two pieces of aluminium of 80 mm x 40 mm x 10 mm will be performed at the second BigRips dipole.

The pieces were placed with the help of Fukuda and Nishimura san.
Entry  Tue May 28 07:49:51 2019, A. Algora, Background, no lmd 
Start: 15:50

Stop: 10:09 (next day)

Root: 201905291009_background_AIDA_in.root
Entry  Tue May 28 06:13:27 2019, A. Algora, Background, Aida in 
Start: 14:13

Stop: 15:47

Lmd: Background_AIDA_in_201905281413_231.dlt .. Background_AIDA_in_201905281413_233.dlt
ELOG V3.1.4-unknown