AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  EDI_PSA, Page 2 of 2  ELOG logo
Entry  Mon Jun 10 03:26:41 2019, CB, DAQ setup, start & stop instructions 7x
(Updated to 10/01/2020)

If recovering from a crash, turn off the VME crate and the workstation.
Entry  Wed Jun 26 14:19:36 2019, CB, Analysis of R2 260619_R2Histo.png
Analysed first ~500 MB of R2_0 using sorting program

https://elog.ph.ed.ac.uk/EDI_PSA/2
Entry  Mon Jun 10 06:17:51 2019, CB, RG, AK, 3-6 June - first DAQ tests 
Tested performance of DAQ with following equipment

Hamamatsu photodiode (S3590-09)
Entry  Thu Jun 15 10:13:56 2023, Lucia B, 23Na target location 
Used and new 23Na targets are in a box in LAB7, next to the other targets
Entry  Tue Jun 1 14:59:06 2021, CB, 2021/R3_0 Analysis - 3 lines 7x
Fit: 3 lines
Free parameters: 2x boundary points between lines
Algorithm: Nelder-Mead, 10 iterations. (Centroid defined incorrectly from entire simplex instead of best two
Entry  Wed Jun 2 10:26:31 2021, CB, 2021/R3_0 Analysis - 2 lines + power law - 20 iterations H.pngt.pngComparison.png
Fit: line + power law + line
Free parameters: 2x boundary points between lines
Algorithm: Nelder-Mead, *20* iterations.
Entry  Tue Jun 1 15:19:40 2021, CB, 2021/R3_0 Analysis - 2 lines + power law 11x
Fit: line + power law + line
Free parameters: 2x boundary points between lines
Algorithm: Nelder-Mead, 10 iterations. (centroid correct)
Entry  Sun May 23 14:02:58 2021, CB, PB, LdF, 2021 Runs - grade B MSL Si 
R1: 
Same as previous configuration? 
Negative signals.
Entry  Tue Jun 15 09:52:10 2021, CB, PB, 2021 Runs - Hamamatsu diode 
Using a 1x1 Hamamatsu photodiode (uncoated)
+75V bias supplied via RAL108 and standard photodiode mount. Imon ~0 
Note negative bias would be supplied with standard lemo cable + standard mount. 
Entry  Tue Feb 11 14:49:29 2020, CB, PB, IMK, 2020 runs 
Runs acquired in Jan-Feb 2020

Detector bias -50V
ELOG V3.1.3-7933898