ID |
Date |
Author |
Subject |
Text |
 |
92
|
Sat Nov 11 00:01:41 2017 |
Daid. Mirco | Trigger and scalars for 4.0 MeV/u | Tom et al. tuned the trigger this evening,
before we began the runs. (Run 82, or Run
83??)
|
|
208
|
Sat Nov 10 18:48:04 2018 |
dk | Travel schedule spreadsheet | https://docs.google.com/spreadsheets/d/1kvCWF13RMH83fssuN2_JLZXJwNL4rUGSEeKOWAIHUi0/edit#gid=0
or
|
|
196
|
Tue Oct 9 10:40:13 2018 |
DK | To-do Meeting Notes: July, August, September, October | Each month's notes are attached. Unfinished
business naturally carries over to the next
month.
|
6x |
26
|
Mon Sep 25 14:50:46 2017 |
dk | To do list before main exp. - update from meeting 28th September | NB: This list may be incomplete!
CERN side:
|
|
11
|
Wed Aug 16 12:53:43 2017 |
DK | To do / missing | Photodiode
Electronics
Foil mount (12 um Al seems okay, but |
|
61
|
Thu Nov 9 07:15:49 2017 |
MD | Tips for Babysitting ISOLDE during shifts | from ISOLDE webpage |
|
2
|
Fri Jan 27 11:33:10 2017 |
DK | Testing email server | Tinkering with configs for SYMPA email server
to see if the elog info is sent to the mailing
list or not
|
|
10
|
Thu Jun 1 13:09:38 2017 |
DK | Testing email header, part II | Checking some server settings for the elog
system regarding the email notification.
|
|
6
|
Wed Apr 26 12:10:04 2017 |
DK | Testing email header | I asked IT about putting the elog name into
the email subject line (useful for those
of us subscribed to more than one elog). |
|
195
|
Mon Oct 8 17:02:47 2018 |
DK | Target ladder photo from previous experiment | From Alex, attached. |
|
44
|
Tue Nov 7 14:38:25 2017 |
Ruchi Garg | Target ladder configuration | |
|
67
|
Thu Nov 9 12:15:33 2017 |
SL | TIMBER: Faraday Cup Measurements | Faraday Cup (at end of Edinburgh chamber) measurements
recorded in TIMBER (from approx 10.00 9/11/17). |
|
200
|
Wed Oct 31 14:50:36 2018 |
DK | Strut shipping info | http://www.dhl.com/en/express/tracking.html?AWB=1647723055&brand=DHL |
|
191
|
Thu Sep 27 12:41:06 2018 |
DK | Strut measurement request | For posterity
==========
|
|
60
|
Thu Nov 9 06:30:35 2017 |
Daid, Mirco | Spectra (Shift 1) | Screen shots for accumulated data before the
target went down. Should be (at least) runs
53 & 54 inclusive, possibly back to the start |
12x |
Draft
|
Wed Aug 16 15:29:57 2017 |
DK | Shipping Inventory | ==BOX A==
VME crate
26 ribbon cables
|
|
13
|
Wed Aug 16 15:30:04 2017 |
DK, MD | Shipping Inventory | ==BOX A== 59kg - 600mm x 600mm x 800mm
VME crate, with power cable
|
|
5
|
Tue Apr 18 11:05:43 2017 |
Mirco / Claudia | Setup Preparation | status of the setup - 07/04/2017
status of the setup - 21/04/2017 |
 |
24
|
Tue Sep 19 14:54:47 2017 |
Claudia, Toby | Setup Photos | |
14x |
192
|
Thu Oct 4 13:07:33 2018 |
KG | Schematics for gas-cell tests | in_atmosphere.png : schematic for testing
gas-cell in atmosphere
|
 |