AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 5 of 11  ELOG logo
Entry  Mon Oct 30 09:46:04 2017, Peter Black, Notes on iris install/operation 
The iris mounts have 2 superimposed constellations of 3mm mounting holes on them that correspond to those of the S2 detector, however the 85x85 square
is missing one hole and the 110x40 rectangle is rotated by 45°. Either constellation may be used. Fixing is intended with M3x16 bolts into 10mm standoffs
used to attach the detector to its mount.
Entry  Mon Nov 6 10:46:53 2017, Peter Black, Faraday cup drawings Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF
Note that the removal of the supressor reqires the special allen key.
Entry  Mon Nov 6 10:50:33 2017, Peter Black, foil mount drawings SiPD_foil_mount.PDFfOIL_HOLDER.PDF
 
Entry  Mon Nov 6 10:52:58 2017, Peter Black, alignment hardware drawings ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF
 
Entry  Mon Nov 6 16:12:47 2017, Peter Black, chamber drawings FullAssemb2.PDFsection.PDF
work in progress. 
Entry  Tue Apr 18 11:05:43 2017, Mirco / Claudia, Setup Preparation ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf
status of the setup - 07/04/2017

status of the setup - 21/04/2017
Entry  Wed Nov 15 03:25:08 2017, MD,DK, Run 152 
Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
Entry  Mon Nov 13 03:52:48 2017, MD, RG, Run 119 

Header: CH2 #16, beam energy 4.4
Ender: 
Entry  Mon Nov 13 06:06:23 2017, MD, RG, Run 120 - junk 
Double klick on stopp, so it jumped to 121. R120 file should be empty or non existing.
Entry  Mon Nov 13 06:08:52 2017, MD, RG, Run 121 

Header: CH2 #16, beam energy 4.4
Ender: 
Entry  Sat Nov 11 01:40:48 2017, MD, DMK, ASM, Run 86 171111_0344_Beamcurrent.jpg171111_0435_Beamcurrent.jpg171111_0440_Laser_02.jpg171111_0440_Laser_03.jpg171111_0441_Laser_04.jpg

Header: 3.99 MeV/u and CH2_30+25. Continue after reheat the primary target (GPS) between 02:20 and 02:30
Ender: 
Entry  Sun Nov 12 23:51:34 2017, MD, DK, RG, Run 114 - Junk 
Double clicked the start / stop so it is blank.
Entry  Mon Nov 13 00:57:24 2017, MD, DK, RG, Run 117 
Header: 4.4 MeV/u on @ CH2
Ender: 
====================================================
Entry  Wed Nov 15 07:39:26 2017, MD, DK, CLW, End of beamtime, modules reading before turning off 
Header: end of beamtime - modules reading
Ender: 
==================================================== 
Entry  Mon Nov 13 23:12:50 2017, MD, DK, Run 132 
Header: Continue CH2 with 3.5 MeV/u
Ender: 
====================================================
Entry  Tue Nov 14 00:41:22 2017, MD, DK, Run 133 

Header: 3.5 MeV/u on C_09
Ender: 
Entry  Tue Nov 14 01:41:17 2017, MD, DK, Run 134 

Header: 3.5 MeV/u on Empty frame
Ender: Stop
Entry  Tue Nov 14 04:16:18 2017, MD, DK, Run 136 

Header: CH2_33+10+01 with 3.5 MeV/u
Ender: 
Entry  Tue Nov 14 06:18:32 2017, MD, DK, Run 137, 138 - Junk 
The newly started runs were stopped by MIDAS - bad clicking mouse...
Entry  Tue Nov 14 23:07:06 2017, MD, DK, Run 150 
Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
ELOG V3.1.4-unknown