AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  ISOLDE, Page 5 of 11  ELOG logo
  ID Date Authordown Subject Text Attachments
  35   Mon Oct 30 09:46:04 2017 Peter BlackNotes on iris install/operationThe iris mounts have 2 superimposed constellations
of 3mm mounting holes on them that correspond
to those of the S2 detector, however the
  
  39   Mon Nov 6 10:46:53 2017 Peter BlackFaraday cup drawingsNote that the removal of the supressor
reqires the special allen key.
 Farady_cup.PDFcup.PDFsupressor.PDFFarady_cup_main.PDF 
  40   Mon Nov 6 10:50:33 2017 Peter Blackfoil mount drawings   SiPD_foil_mount.PDFfOIL_HOLDER.PDF 
  41   Mon Nov 6 10:52:58 2017 Peter Blackalignment hardware drawings   ladder_alignment_block.PDFS2_alignment_bar.PDFalignment_plug_70mm.PDFalignment_plug.PDF 
  43   Mon Nov 6 16:12:47 2017 Peter Blackchamber drawingswork in progress.   FullAssemb2.PDFsection.PDF 
  5   Tue Apr 18 11:05:43 2017 Mirco / ClaudiaSetup Preparationstatus of the setup - 07/04/2017

status of the setup - 21/04/2017
 ISOLDE_-_chamber_status070417.pdfISOLDE_-_chamber_status210417.pdf 
  166   Wed Nov 15 03:25:08 2017 MD,DKRun 152Header: Continue with 5.0 MeV/u on CH2_33+10+01
Ender: End
====================================================
  
  133   Mon Nov 13 03:52:48 2017 MD, RGRun 119
Header: CH2 #16, beam energy 4.4
Ender: 
  
  134   Mon Nov 13 06:06:23 2017 MD, RGRun 120 - junkDouble klick on stopp, so it jumped to 121.
R120 file should be empty or non existing.
  
  135   Mon Nov 13 06:08:52 2017 MD, RGRun 121
Header: CH2 #16, beam energy 4.4
Ender: 
  
  95   Sat Nov 11 01:40:48 2017 MD, DMK, ASMRun 86
Header: 3.99 MeV/u and CH2_30+25. Continue
after reheat the primary target (GPS) between
 171111_0344_Beamcurrent.jpg171111_0435_Beamcurrent.jpg171111_0440_Laser_02.jpg171111_0440_Laser_03.jpg171111_0441_Laser_04.jpg 
  128   Sun Nov 12 23:51:34 2017 MD, DK, RGRun 114 - JunkDouble clicked the start / stop so it is blank.   
  131   Mon Nov 13 00:57:24 2017 MD, DK, RGRun 117Header: 4.4 MeV/u on @ CH2
Ender: 
====================================================
  
  168   Wed Nov 15 07:39:26 2017 MD, DK, CLWEnd of beamtime, modules reading before turning offHeader: end of beamtime - modules reading
Ender: 
====================================================
  
  147   Mon Nov 13 23:12:50 2017 MD, DKRun 132Header: Continue CH2 with 3.5 MeV/u
Ender: 
====================================================
  
  148   Tue Nov 14 00:41:22 2017 MD, DKRun 133
Header: 3.5 MeV/u on C_09
Ender: 
  
  149   Tue Nov 14 01:41:17 2017 MD, DKRun 134
Header: 3.5 MeV/u on Empty frame
Ender: Stop
  
  151   Tue Nov 14 04:16:18 2017 MD, DKRun 136
Header: CH2_33+10+01 with 3.5 MeV/u
Ender: 
  
  152   Tue Nov 14 06:18:32 2017 MD, DKRun 137, 138 - JunkThe newly started runs were stopped by MIDAS
- bad clicking mouse...
  
  164   Tue Nov 14 23:07:06 2017 MD, DKRun 150Header: 5.0 MeV/u wit CH2
Ender: End
====================================================
  
ELOG V3.1.4-unknown