|
ID |
Date |
Author |
Subject |
|
16
|
Thu Sep 19 11:26:44 2024 |
Selin | Li2 Comparison |
1. The DEED amplitudes of Li2 run when the sample was not rotated.
2. The DEED amplitudes of Li2 run when the sample was rotated. There are two clear peaks which indicate triton and alpha.
3. The EDET amplitudes of Li2 run when the sample was not rotated.
4. The EDET amplitudes of Li2 run when the sample was rotated.
|
Attachment 1: Li2_deed.pdf
|
|
Attachment 2: Li2_deed_rot.pdf
|
|
Attachment 3: Li2_edet.pdf
|
|
Attachment 4: Li2_edet_rot.pdf
|
|
|
17
|
Thu Sep 19 15:38:24 2024 |
Selin | B2 Runs |
Two different runs of B2 and the DEED-EDET amplitudes. |
Attachment 1: B2_deed.pdf
|
|
Attachment 2: B2_deed2.pdf
|
|
Attachment 3: B2_edet.pdf
|
|
Attachment 4: B2_edet2.pdf
|
|
|
21
|
Mon Oct 21 17:44:11 2024 |
Selin | Protons |
This is the Excel sheet where the proton numbers and the runs are kept track of. |
Attachment 1: Kprotons.xlsx
|
|
25
|
Fri Nov 8 11:05:14 2024 |
Selin | Energy Deposition Plot of K40 Runs |
This is the energy deposited vs neutron energy plot of all ~220 runs of K40 and a few resonances can be seen. |
Attachment 1: edep.png
|
|
|
26
|
Wed Jan 22 14:41:09 2025 |
Selin | Strip Comparison for Li and K |
1. LiF 2 strip comparison. This includes 12 runs.
2. LiF 3 strip comparison. This includes 4 runs.
3. K40 strip comparison. This shows 213 runs which have been grouped into 3 equally. |
Attachment 1: Li2stripintegral.pdf
|
|
Attachment 2: Li3stripintegral.pdf
|
|
Attachment 3: Kstripintegral.pdf
|
|
|
22
|
Tue Oct 22 08:36:28 2024 |
Francisco García Infantes | Saturday 19 intervention |
During the intervention on Sunday there were some problems related to the detectors and the Dummy sample.
When we opened the chamber we realised that the detectors were not in place. It happened at the beggining of the experimental campaign while we were changing one of the references samples. As far as Emmanuel and I remenbered, the detectors were well fixed in the support, and we guess that the detectors moved as soon as we tried to open the chamber.
On the other hand, the dummy sample broke during the intervention. I attach a photo of the dummy sample.
About the 40K sample, it is in the vacuum box in good conditions. |
Attachment 1: Dummy.jpeg
|
|
|
23
|
Tue Oct 22 08:40:18 2024 |
Francisco García Infantes | End of the campaign. Reference samples measurement |
October 22th. It's planned to remove the dummy sample on beam. We are planning to measured 4 references samples during the next two days.
- 6LiF #2. The 6LiF is deposited in the backing side. The measurement will be performed by using Al filter, Co - Mo- W and no filters.
- 6LiF #3. The 6LiF is deposited in the backing side. The measurement will be performed by using Al filter, Co - Mo- W and no filters.
-10B #3. The 10B is deposited in the frame side. The measurment will be performed without filters.
-10B #2. The 10B is deposited in the backing side. The measurment will be performed without filters.
For the moment 6 reference samples have been measured.
- 2 x 6LiF. The 6LiF is deposited in the backing side for both samples, #2 and #3. (Backing means the side from where the mylar has been glued)
- 4 x 10B. For the samples #1 and #2 the 10B is deposited in the frame facing the detector, and the samples #3 and #4 the 10B is deposited in the backing side.
During the last days, the two 6LiF samples will be measured, and the samples #2 and #3 samples with 10B. |
|
27
|
Mon Jan 27 15:19:16 2025 |
Francisco García Infantes | DSSSD Data processing |
I want to update about the DSSSD analysis and the processing routine. First, I attach a few screenshots of how the average signals work. Still, it can be improved looking at the average signal close to the gamma flash or optimizing the PSA parameters.
On the other hand, the data processing is already working. I attacha document where I explain the steps that must be follow and changes needed to make it work. |
Attachment 1: Gamma_Flash.png
|
|
Attachment 2: Gamma_Flash.png
|
|
Attachment 3: Far_From_gflash.png
|
|
Attachment 4: Data_Processing_Documentation.odt
|
|
Draft
|
Tue Oct 22 14:05:02 2024 |
Francisco GarcÃa Infantes | Transport of the 40K sample to CNA |
|
|
13
|
Tue Sep 17 15:09:29 2024 |
FGI, CLW | LiF sample rotated |
In the scheenshot attached, the LiF sample is the same but the number of signals are different and the amplitude. The LiF is the #2.
Therefore, according to the Emmanuel's plots, we were putting the LiF sample away from the detectors.
The runNumber 219135 corresponds to the LiF sample forward to the detector, and the runNumber 219167 corresponds to the LiF sample away from the detector.
edit: added screenshot of strip 5 amplitude spectrum from run 219167 where triton and alpha peaks are well separated. |
Attachment 1: Screenshot_from_2024-09-17_16-06-51.png
|
|
Attachment 2: Screenshot_2024-09-17_at_16.20.51.png
|
|
|
9
|
Sat Sep 14 20:27:27 2024 |
Emmanuel | Few adjustments and Log book |
Wiith the adjustments:
voltage and leakage current in dE are 7 V and 0.03 µA, respectvely. (W1-20, 3186-9, 20 um)
voltage and leakage current in E are 47 V and 0.04 µA, respectvely. (W1-150 3458-4, 144 um)
A logbook is attached to record what happened in the first weekend of the campaign, so as to keep track of the changes we made, before the 40K sample gets in. It will be updated tomorrow 15th Sept., 2024. |
Attachment 1: 40K_logbook.docx
|
|
12
|
Mon Sep 16 09:23:36 2024 |
Emmanuel | Spectra |
Spectra after adjustments of the MWD and UserInput:
10B - Sample 1, 10B - Sample 2, LiF - Sample 2 and LIF - Sample 3.
We haven't seen the triton peak in any of the LIF - just noise and alpha.
The 10B alpha is also seen. |
Attachment 1: 219134.pdf
|
|
Attachment 2: 219140.pdf
|
|
Attachment 3: 219142.pdf
|
|
Attachment 4: 219149.pdf
|
|
|
8
|
Fri Sep 13 14:38:09 2024 |
Clw | For next time |
Things to organise for the future:
- plastic detecor mounts to electrically isolate detectors
- storage boxes |
|
7
|
Fri Sep 13 11:34:01 2024 |
CLW, TD | Pulser |
Screenshots of pulser signal in DEED - 1-4 and EDET 1-4
Pulser settings:
- positive
- 0.5 V
- 20 Hz |
Attachment 1: Screenshot_from_2024-09-13_12-32-55.png
|
|
Attachment 2: Screenshot_from_2024-09-13_12-32-20.png
|
|
|
3
|
Wed Jul 31 11:15:09 2024 |
CLW, Francisco | reference samples, 10B, LiF, blank |
B10 and LiF samples have arrived at CERN.
There are 4 LiF sample, 4 Boron sample and one blank sample. All samples are attached to a square and are in good condition. |
Attachment 1: Experiment_40K_Reference_Samples_1.jpeg
|
|
Attachment 2: Experiment_40K_Reference_Samples_2.jpeg
|
|
Attachment 3: B_Sample_2_1.jpeg
|
|
Attachment 4: LiF_Sample_1_1.jpeg
|
|
|
1
|
Tue Apr 16 08:57:12 2024 |
CLW | New Elog tab for 40K experiment |
This is a new elog tab dedicated to the 40K(n,p) and (n,alpha) experiment. Things to be prepared before the run (start of run TBD):
- new almunised Kapton windows for chamber (Peter has ordered material)
- Lemo - BNC converters (most availanble, 10 new ones in my office)
- 10B and LiF reference samples: being prepared by P. Morrall in Daresbury
- 40K samples: one 40K (16% enriched) prepared by PSI, one highly enriched 40K sample will be produced by implantation at iThemba labs. Implantation will commence around May for about 6 weeks. |
|
2
|
Thu Jun 20 12:41:22 2024 |
CLW | To Prepare |
- new Kapton windows for chamber (underway, waiting for workshop)
- LiF and B samples from Daresbury: under production, will be shipped directly to CERN
- shorter flat cable: will try again to make a proper flat cable that is shorter. check with Tom |
|
4
|
Tue Aug 27 09:01:01 2024 |
CLW | Prep Meeting Slides |
|
Attachment 1: K40_prepmeeting.pptx
|
|
5
|
Fri Sep 13 08:12:04 2024 |
CLW | How to Edinburgh Chamber |
A how to from last year, still relevant for this measurement (only the vacuum valve may have moved depending on the pump. |
Attachment 1: HOW_TO.docx
|
|
6
|
Fri Sep 13 08:43:13 2024 |
CLW | Cabling |
Detector |
Bunker Signal |
patch panel |
signal cable |
ADC Card |
name in daq |
dE 0 |
71 |
220804 |
10 |
5348 |
DEED 1 |
dE 1 |
72 |
220805 |
11 |
5348 |
DEED 2 |
dE 2 |
73 |
220806 |
12 |
5348 |
DEED 3 |
dE 3 |
74 |
220807 |
13 |
5348 |
DEED 4 |
dE 4 |
75 |
220808 |
14 |
4679 |
DEED 5 |
dE 5 |
76 |
220809 |
15 |
4679 |
DEED 6 |
dE 6 |
77 |
220810 |
16 |
4679 |
DEED 7 |
dE 7 |
78 |
220811 |
17 |
4679 |
DEED 8 |
dE 8 |
79 |
220812 |
18 |
4676 |
DEED 9 |
dE 9 |
80 |
220813 |
19 |
4676 |
DEED 10 |
dE 10 |
81 |
220814 |
20 |
4676 |
DEED11 |
dE 11 |
82 |
220815 |
21 |
4676 |
DEED 12 |
dE 12 |
83 |
220817 |
23 |
4677 |
DEED 12 |
dE 13 |
84 |
220818 |
24 |
4677 |
DEED 13 |
dE 14 |
85 |
220819 |
25 |
4677 |
DEED 14 |
dE 15 |
86 |
220820 |
26 |
4677 |
DEED 15 |
|
|
|
|
|
|
Efront 0 |
95 |
220821 |
27 |
4674 |
EDET 1 |
Efront 1 |
96 |
220822 |
28 |
4674 |
EDET 2 |
Efront 2 |
97 |
220823 |
29 |
4674 |
EDET 3 |
Efront 3 |
100 |
220824 |
30 |
4674 |
EDET 4 |
Efront 4 |
101 |
220825 |
31 |
4684 |
EDET 5 |
Efront 5 |
102 |
220826 |
32 |
4684 |
EDET 6 |
Efront 6 |
103 |
220827 |
33 |
4684 |
EDET 7 |
Efront 7 |
104 |
220828 |
34 |
4684 |
EDET 8 |
Efront 8 |
105 |
220829 |
35 |
4683 |
EDET 9 |
Efront 9 |
106 |
220830 |
36 |
4683 |
EDET10 |
Efront10 |
107 |
220831 |
37 |
4683 |
EDET11 |
Efront11 |
108 |
220832 |
38 |
4683 |
EDET12 |
Efront12 |
109 |
220833 |
39 |
4682 |
EDET13 |
Efront13 |
110 |
220834 |
40 |
4682 |
EDET14 |
Efront14 |
111 |
220835 |
41 |
4682 |
EDET15 |
Efront15 |
112 |
220836 |
42 |
4682 |
EDET16 |
|
|
|
|
|
|
Eback 0 |
113 |
220837 |
43 |
5344 |
EDET17 |
Eback 1 |
114 |
220838 |
44 |
5344 |
EDET18 |
Eback 2 |
116 |
220839 |
45 |
5344 |
EDET19 |
Eback 3 |
117 |
220840 |
46 |
5344 |
EDET20 |
Eback 4 |
118 |
220841 |
47 |
4680 |
EDET21 |
Eback 5 |
119 |
220842 |
48 |
4680 |
EDET22 |
Eback 6 |
120 |
220843 |
49 |
4680 |
EDET23 |
Eback 7 |
121 |
220844 |
50 |
4680 |
EDET24 |
Eback 8 |
122 |
220845 |
51 |
5345 |
EDET25 |
Eback 9 |
123 |
220846 |
52 |
5345 |
EDET26 |
Eback10 |
124 |
220847 |
53 |
5345 |
EDET27 |
Eback11 |
125 |
220848 |
54 |
5345 |
EDET28 |
Eback12 |
126 |
220849 |
55 |
4073 |
EDET29 |
Eback13 |
127 |
220850 |
56 |
4073 |
EDET30 |
Eback14 |
128 |
220851 |
57 |
4073 |
EDET31 |
Eback15 |
129 |
220852 |
58 |
2872 |
EDET32 |
|