ID |
Date |
Author |
Subject |
Text |
|
25
|
Fri Nov 8 11:05:14 2024 |
Selin | Energy Deposition Plot of K40 Runs | This is the energy deposited vs neutron
energy plot of all ~220 runs of K40 and a
few resonances can be seen. |
|
Draft
|
Tue Oct 22 14:05:02 2024 |
Francisco GarcÃa Infantes | Transport of the 40K sample to CNA | |
|
23
|
Tue Oct 22 08:40:18 2024 |
Francisco García Infantes | End of the campaign. Reference samples measurement | October 22th. It's planned to remove
the dummy sample on beam. We are planning
to measured 4 references samples during the |
|
22
|
Tue Oct 22 08:36:28 2024 |
Francisco García Infantes | Saturday 19 intervention | During the intervention on Sunday there
were some problems related to the detectors
and the Dummy sample. |
|
21
|
Mon Oct 21 17:44:11 2024 |
Selin | Protons | This is the Excel sheet where the proton
numbers and the runs are kept track of. |
|
20
|
Fri Sep 27 15:51:30 2024 |
CLW | Runplan for last ~week of run: UNDER CONSTRUCTION | - run with LiF for a few hours with filters
in the beam -- > this will help with the
neutron energy calibration later |
|
19
|
Fri Sep 20 09:58:28 2024 |
CLW | K-40 run219189 | Plot shows deposited energy (very rough
calibration) vs Neutron energy (also very
rough calibration). We expect the biggest |
|
18
|
Fri Sep 20 09:19:35 2024 |
CLW | Photos of Setup | Photos |
|
17
|
Thu Sep 19 15:38:24 2024 |
Selin | B2 Runs | Two different runs of B2 and the DEED-EDET
amplitudes. |
|
16
|
Thu Sep 19 11:26:44 2024 |
Selin | Li2 Comparison | 1. The DEED amplitudes of Li2 run when
the sample was not rotated.
2. The DEED amplitudes of |
|
15
|
Wed Sep 18 10:08:58 2024 |
CLW | Quick Plotting in terminal directly from root file | root -l run219167.root
TH1F *h=new TH1F("h","h",5000,0,5000)
EDET->Draw("amp>>h","detn==7") |
|
14
|
Wed Sep 18 09:24:48 2024 |
CLW | run219173 | Strips 1-16 dE.
Strip 8 is not working. Strip 16
is drowing the 10B peak in noise. All |
|
13
|
Tue Sep 17 15:09:29 2024 |
FGI, CLW | LiF sample rotated | In the scheenshot attached, the LiF sample
is the same but the number of signals are
different and the amplitude. The LiF is the |
|
12
|
Mon Sep 16 09:23:36 2024 |
Emmanuel | Spectra | Spectra after adjustments of the MWD and
UserInput:
10B - Sample 1, 10B - Sample 2, |
|
10
|
Sun Sep 15 21:15:48 2024 |
CLW | Amplitude spectra | Strip 13 ampltiude spectra for the LiF
and B samples. Also a picture of a simulation
of what would be expected in a 20 um detector |
|
9
|
Sat Sep 14 20:27:27 2024 |
Emmanuel | Few adjustments and Log book | Wiith the adjustments:
voltage and leakage current in dE
are 7 V and 0.03 µA, respectvely. |
|
8
|
Fri Sep 13 14:38:09 2024 |
Clw | For next time | Things to organise for the future:
- plastic detecor mounts to electrically
isolate detectors |
|
7
|
Fri Sep 13 11:34:01 2024 |
CLW, TD | Pulser | Screenshots of pulser signal in DEED
- 1-4 and EDET 1-4
|
|
6
|
Fri Sep 13 08:43:13 2024 |
CLW | Cabling |
Detector
Bunker
Signal
patch panel
signal |
|
5
|
Fri Sep 13 08:12:04 2024 |
CLW | How to Edinburgh Chamber | A how to from last year, still relevant
for this measurement (only the vacuum valve
may have moved depending on the pump. |
|