AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  K40, Page 1 of 2  ELOG logo
Entry  Mon Jan 27 15:19:16 2025, Francisco García Infantes, DSSSD Data processing Gamma_Flash.pngGamma_Flash.pngFar_From_gflash.pngData_Processing_Documentation.odt
I want to update about the DSSSD analysis and the processing routine. First, I attach a few screenshots of how the average signals work. Still, it can
be improved looking at the average signal close to the gamma flash or optimizing the PSA parameters.

 
Entry  Wed Jan 22 14:41:09 2025, Selin, Strip Comparison for Li and K Li2stripintegral.pdfLi3stripintegral.pdfKstripintegral.pdf
1. LiF 2 strip comparison. This includes 12 runs.

2. LiF 3 strip comparison. This includes 4 runs.

3. K40 strip comparison. This shows 213 runs which have been grouped into 3 equally.
Entry  Fri Nov 8 11:05:14 2024, Selin, Energy Deposition Plot of K40 Runs edep.png
This is the energy deposited vs neutron energy plot of all ~220 runs of K40 and a few resonances can be seen.
Entry  Tue Oct 22 14:05:02 2024, Francisco García Infantes, Transport of the 40K sample to CNA 
 
Entry  Tue Oct 22 08:40:18 2024, Francisco García Infantes, End of the campaign. Reference samples measurement 
October 22th. It's planned to remove the dummy sample on beam. We are planning to measured 4 references samples during the next two days.

- 6LiF #2. The 6LiF is deposited in the backing side. The measurement will be performed by using Al filter, Co - Mo- W and no filters.

- 6LiF #3. The 6LiF is deposited in the backing side. The measurement will be performed by using Al filter, Co - Mo- W and no filters.
Entry  Tue Oct 22 08:36:28 2024, Francisco García Infantes, Saturday 19 intervention Dummy.jpeg
During the intervention on Sunday there were some problems related to the detectors and the Dummy sample.

When we opened the chamber we realised that the detectors were not in place. It happened at the beggining of the experimental campaign while
we were changing one of the references samples. As far as Emmanuel and I remenbered, the detectors were well fixed in the support, and we guess that the
Entry  Mon Oct 21 17:44:11 2024, Selin, Protons Kprotons.xlsx
This is the Excel sheet where the proton numbers and the runs are kept track of.
Entry  Fri Sep 27 15:51:30 2024, CLW, Runplan for last ~week of run: UNDER CONSTRUCTION 
- run with LiF for a few hours with filters in the beam -- > this will help with the neutron energy calibration later

- run again LiF and 10B (not all samples, 2  LiF and 1 B are enough)

- run with the dummy sample
Entry  Fri Sep 20 09:58:28 2024, CLW, K-40 run219189 K_40_dE.png
Plot shows deposited energy (very rough calibration) vs Neutron energy (also very rough calibration). We expect the biggest resonances in the 40K(n,alpha)
reaction at ~1 keV and 5 keV. There is an accumulation of counts at those neutron energies and around the expected Alpha energy (~3.5 MeV and ~1.8 MeV). 

In the proposal we expected in total ~2000 counts for those resonances for 4.5E18 protons. The plot shows 1/200 of the total statistics, so what
Entry  Fri Sep 20 09:19:35 2024, CLW, Photos of Setup 
Photos
Entry  Thu Sep 19 15:38:24 2024, Selin, B2 Runs B2_deed.pdfB2_deed2.pdfB2_edet.pdfB2_edet2.pdf
Two different runs of B2 and the DEED-EDET amplitudes.
Entry  Thu Sep 19 11:26:44 2024, Selin, Li2 Comparison Li2_deed.pdfLi2_deed_rot.pdfLi2_edet.pdfLi2_edet_rot.pdf
1. The DEED amplitudes of Li2 run when the sample was not rotated.

2.  The DEED amplitudes of Li2 run when the sample was rotated. There are two clear peaks which indicate triton and alpha.

3. The EDET amplitudes of Li2 run when the sample was not rotated.
Entry  Wed Sep 18 10:08:58 2024, CLW, Quick Plotting in terminal directly from root file 
root -l run219167.root

TH1F *h=new TH1F("h","h",5000,0,5000)

EDET->Draw("amp>>h","detn==7")
Entry  Wed Sep 18 09:24:48 2024, CLW, run219173 run219173.pdf
Strips 1-16 dE.

Strip 8 is not working. Strip 16 is drowing the 10B peak in noise.  All others  look ok. The low energy peak around channel 300 in
visible in some strips may be the Li recoil. The main peak around channel 800 is 10B(n,alpha_1) at around 1.3 MeV. The alpha_0 channel should be at around
Entry  Tue Sep 17 15:09:29 2024, FGI, CLW, LiF sample rotated Screenshot_from_2024-09-17_16-06-51.pngScreenshot_2024-09-17_at_16.20.51.png
In the scheenshot attached, the LiF sample is the same but the number of signals are different and the amplitude. The LiF is the #2.

 

Therefore, according to the Emmanuel's plots, we were putting the LiF sample away from the detectors.
Entry  Mon Sep 16 09:23:36 2024, Emmanuel, Spectra 219134.pdf219140.pdf219142.pdf219149.pdf
Spectra after adjustments of the MWD and UserInput:

10B - Sample 1, 10B - Sample 2, LiF - Sample 2 and LIF - Sample 3.

We haven't seen the triton peak in any of the LIF - just noise and alpha.
Entry  Sun Sep 15 21:15:48 2024, CLW, Amplitude spectra c1.pngdE_20um.png
Strip 13 ampltiude spectra for the LiF and B samples. Also a picture of a simulation of what would be expected in a 20 um detector in terms of energy
deposition for several reactions (assuming a thin sample).

- for B-10 n,alpha, the dominant reaction is n,alpha_1, so just seeing one peak makes sense
Entry  Sat Sep 14 20:27:27 2024, Emmanuel, Few adjustments and Log book 40K_logbook.docx
Wiith the adjustments:

voltage and leakage current in dE are 7 V and 0.03 µA,  respectvely. (W1-20, 3186-9, 20 um)

voltage and leakage current in E are 47 V and 0.04 µA,  respectvely. (W1-150 3458-4, 144 um)
Entry  Fri Sep 13 14:38:09 2024, Clw, For next time 
Things to organise for the future:

- plastic detecor mounts to electrically isolate detectors

- storage boxes
Entry  Fri Sep 13 11:34:01 2024, CLW, TD, Pulser Screenshot_from_2024-09-13_12-32-55.pngScreenshot_from_2024-09-13_12-32-20.png
Screenshots of pulser signal  in DEED - 1-4 and EDET 1-4

 

Pulser settings:
ELOG V3.1.4-unknown