Entry  Sat Feb 28 09:20:14 2026, TD, MIDAS DAQ configuration 8x

MIDAS DAQ configuration files
Entry  Sat Feb 28 12:09:56 2026, TD, Offline analysis data file R52 8x

Offline data analysis of data file R52 
c. 1h 2.25MeV neutrons from 10uA p+ + 410ug/cm2 LiF -> copper block -> sample #4 Mylar+NaCl+197Au 
Entry  Fri Feb 27 12:41:34 2026, SB, TD, FGI, Friday 27 February 2026 11x

BNC PB-5 settings
Amplitude 5.0V
Entry  Fri Feb 27 14:38:28 2026, SB, TD, FGI, R51 9.png

start: 14:31:03 (w23 is set to GMT)
stop: 14:38:09
Entry  Fri Feb 27 15:17:59 2026, SB, TD, FGI, R52 
Start: 15:06:06 GMT
Stop: 16:13:45
Blocks: 875
Entry  Sat Feb 28 08:59:14 2026, SB, TD, FGI, R53 6x

start: 16:14:44 27.2.26
stop: 08:38:26 2.3.26
Entry  Thu Jan 29 16:16:46 2026, Francisco García Infantes, SetUp Status Preamp_Modules.jpegChamber_In.jpegFrom_Chamber.jpegVoltage_Cable.jpeg
Here is a brief status update on the chamber setup.

At the moment, we have all the main components required for the experiment related to the chamber:



Vacuum chamber
Entry  Fri Jan 30 15:45:48 2026, Francisco Garci­a Infantes, DAQ and cables status VME_V430_crate.jpegCAMAC_Crate.jpegJonction_Box.jpegNIM_bin.jpegVME_V430_crate.jpeg
Concerning the electronic stuff. We will need:


1x NIM bin.


Pulser
(Model PB-5)
Sum&Invert (Model 433A)
Entry  Tue Feb 10 09:03:26 2026, Francisco Garci­a Infantes, Contents of shipment boxes 
BOX A

1) VME V340 crate, fan tray. Serial number 3797053, type UEL
6020.
Entry  Tue Feb 10 09:31:47 2026, Francisco Garci­a Infantes, Detector Voltage vs Current Voltage_vs_Current.png
Analysis of how the current changes with increasing voltage for both
detectors.

Detector 100 um.
Entry  Mon Mar 2 11:11:18 2026, FGI, TD, SB, CLW, Second configuration. DSSSD1_Voltage_New.jpegDSSSD2_Voltage_New.jpeg
After the first weekend, we change the setup configuration. We removed the shadow cone, and we placed the chamber closer to the LiF target.

The voltage was increased upto 100V for both detectors, but there was a problem in DSSSD1. Therefore, The voltage was setup at 70V for DSSSD
#1 and 100V for DSSSD #2.
Entry  Mon Mar 2 13:50:20 2026, FGI, TD, SB, CLW, Cabling 
The cables are plug in this way.

Cable 0 connected to Preamp A, Positive output. (n+n side, toward the sample)

Cable 1 connected to Preamp A, Negative output. (p+n side, backward the sample)
Entry  Tue Mar 3 15:28:37 2026, FGI, SB, CLW, Run 59 
Before this run, we change the target for the neutron source. We are using a Triton target of ~200 ug/cm².

Starting time: 11:14:32

Stop: 15:03:16.
Entry  Thu Mar 5 09:21:10 2026, FGI, SB, Run 60 
NaCl #5 sample in beam

Starting time: 15:29:51

Stop time : 08:19:57
Entry  Thu Mar 5 09:22:58 2026, FGI, SB, Run 61 
Boron-10 #3 sample in beam

Starting time: 08:49:16

Stop time : 15:07:34
Entry  Thu Mar 5 09:24:21 2026, FGI, SB, Run62 
Gold + Mylar sample in beam

Starting time: 15:32:00

Stop time : 08:13:55
Entry  Thu Mar 5 09:25:45 2026, FGI, SB, Run 63 
LiF #8 sample in beam

Starting time: 08:34:15

Stop time : 14:53:02
Entry  Fri Mar 6 08:55:16 2026, FGI, SB, Run 64 
LiF #7 sample in beam

Starting time: 15:11:10

Stop time : 08:14:22
Entry  Fri Mar 6 08:56:26 2026, FGI, SB, Run 65 Am_241_Source.jpeg
Am-241 calibration source. Towards DSSSD #2 (PreAmp B) upstream detector

Starting time: 08:41:21

Stop time :
Entry  Mon Mar 2 09:43:05 2026, FG,SB,CLW,TD, Run 54 

start: 09:36:05 2.3.26
stop: 09:43:49 2.3.26
blocks: 14

Cu rod taken out, run in neutron beam with NaCl target. Distance chamber to
target is 6.5 cm. Run stopped due to high trigger rate in channels 138,144. 