AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 2 of 2  ELOG logo
Entry  Sat Feb 28 09:20:14 2026, TD, MIDAS DAQ configuration 8x

MIDAS DAQ configuration files
Entry  Fri Feb 27 12:41:34 2026, SB, TD, FGI, Friday 27 February 2026 11x

BNC PB-5 settings
Amplitude 5.0V
Entry  Tue Feb 10 09:31:47 2026, Francisco Garci­a Infantes, Detector Voltage vs Current Voltage_vs_Current.png
Analysis of how the current changes with increasing voltage for both
detectors.

Detector 100 um.
Entry  Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
The first sample on beam is the NaCl target #4. The shado cone was placed between the LiF target and the chamber.

The shadow cone was a cupper cilinder of 4cm diameter and 30 cm lenght, placed at 0.8 cm from the LiF target and 2.8 cm from the chamber. See
first figure 1.
Entry  Fri Jan 30 15:45:48 2026, Francisco Garci­a Infantes, DAQ and cables status VME_V430_crate.jpegCAMAC_Crate.jpegJonction_Box.jpegNIM_bin.jpegVME_V430_crate.jpeg
Concerning the electronic stuff. We will need:


1x NIM bin.


Pulser
(Model PB-5)
Sum&Invert (Model 433A)
Entry  Mon Jan 26 11:29:14 2026, Claudia, Count rate estimate and particle energies kinematics.cneutron_fluxes.xlsx
Count rate estimate for all reaction measurements planned. 


Assumptions:
Entry  Tue Feb 10 09:03:26 2026, Francisco Garci­a Infantes, Contents of shipment boxes 
BOX A

1) VME V340 crate, fan tray. Serial number 3797053, type UEL
6020.
Entry  Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC 
T=0: Edinburgh Time 9:39:00

T=1:40: Geel Time 10:37:00

 
Entry  Mon Mar 2 13:50:20 2026, FGI, TD, SB, CLW, Cabling 
The cables are plug in this way.

Cable 0 connected to Preamp A, Positive output. (n+n side, toward the sample)

Cable 1 connected to Preamp A, Negative output. (p+n side, backward the sample)
Entry  Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night Cl35_Proton_Peak.png
Plot from Fran showing peak around expected proton energy in both detectors. Top half are strips of detector placed at 180degrees wrt neutron beam, bottom
half 0 degrees. Hence, proton peak from bottom half should be at slightly higher energy. 

 
ELOG V3.1.3-7933898