Sat Feb 28 09:20:14 2026, TD, MIDAS DAQ configuration 8x
|
MIDAS DAQ configuration files
|
Fri Feb 27 12:41:34 2026, SB, TD, FGI, Friday 27 February 2026 11x
|
BNC PB-5 settings
Amplitude 5.0V
|
Tue Feb 10 09:31:47 2026, Francisco Garcia Infantes, Detector Voltage vs Current
|
Analysis of how the current changes with increasing voltage for both
detectors.
Detector 100 um. |
Mon Mar 2 10:39:30 2026, SW, TD, SB, CLW, Detector SetUp. First Configuration 9x
|
The first sample on beam is the NaCl target #4. The shado cone was placed between the LiF target and the chamber.
The shadow cone was a cupper cilinder of 4cm diameter and 30 cm lenght, placed at 0.8 cm from the LiF target and 2.8 cm from the chamber. See
first figure 1. |
Fri Jan 30 15:45:48 2026, Francisco Garcia Infantes, DAQ and cables status    
|
Concerning the electronic stuff. We will need:
1x NIM bin.
Pulser
(Model PB-5)
Sum&Invert (Model 433A)
|
Mon Jan 26 11:29:14 2026, Claudia, Count rate estimate and particle energies 
|
Count rate estimate for all reaction measurements planned.
Assumptions: |
Tue Feb 10 09:03:26 2026, Francisco Garcia Infantes, Contents of shipment boxes
|
BOX A
1) VME V340 crate, fan tray. Serial number 3797053, type UEL
6020. |
Mon Mar 2 09:47:13 2026, CLW, Clock Synchronisation Edinburgh PC , Geel monitor PC
|
T=0: Edinburgh Time 9:39:00
T=1:40: Geel Time 10:37:00
|
Mon Mar 2 13:50:20 2026, FGI, TD, SB, CLW, Cabling
|
The cables are plug in this way.
Cable 0 connected to Preamp A, Positive output. (n+n side, toward the sample)
Cable 1 connected to Preamp A, Negative output. (p+n side, backward the sample) |
Wed Mar 4 11:00:57 2026, CLW, 35Cl(n,p) proton peak, run with 3 MeV neutrons over night
|
Plot from Fran showing peak around expected proton energy in both detectors. Top half are strips of detector placed at 180degrees wrt neutron beam, bottom
half 0 degrees. Hence, proton peak from bottom half should be at slightly higher energy.
|