AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40 MONNET
  MONNET, Page 2 of 2  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Author Subjectdown Text Attachments
  13   Sat Feb 28 09:20:14 2026 TDMIDAS DAQ configuration
MIDAS DAQ configuration files
 8x 
  8   Fri Feb 27 12:41:34 2026 SB, TD, FGIFriday 27 February 2026
BNC PB-5 settings
Amplitude 5.0V
 11x 
  6   Tue Feb 10 09:31:47 2026 Francisco Garci­a InfantesDetector Voltage vs CurrentAnalysis
of how the current changes with increasing
voltage for both detectors.
 Voltage_vs_Current.png 
  18   Mon Mar 2 10:39:30 2026 SW, TD, SB, CLWDetector SetUp. First ConfigurationThe first sample on beam is the NaCl target
#4. The shado cone was placed between the
LiF target and the chamber.
 9x 
  3   Fri Jan 30 15:45:48 2026 Francisco Garci­a InfantesDAQ and cables statusConcerning the electronic
stuff. We will need:
 VME_V430_crate.jpegCAMAC_Crate.jpegJonction_Box.jpegNIM_bin.jpegVME_V430_crate.jpeg 
  1   Mon Jan 26 11:29:14 2026 ClaudiaCount rate estimate and particle energiesCount rate estimate for all reaction measurements
planned. 

 kinematics.cneutron_fluxes.xlsx 
  5   Tue Feb 10 09:03:26 2026 Francisco Garci­a InfantesContents of shipment boxesBOX
A

  
  16   Mon Mar 2 09:47:13 2026 CLWClock Synchronisation Edinburgh PC , Geel monitor PCT=0: Edinburgh Time 9:39:00

T=1:40: Geel Time 10:37:00

 
  
  22   Mon Mar 2 13:50:20 2026 FGI, TD, SB, CLWCablingThe cables are plug in this way.

Cable 0 connected to Preamp A,
Positive output. (n+n side, toward the sample)
  
  26   Wed Mar 4 11:00:57 2026 CLW35Cl(n,p) proton peak, run with 3 MeV neutrons over nightPlot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees
 Cl35_Proton_Peak.png 
ELOG V3.1.3-7933898