13
|
Sat Feb 28 09:20:14 2026 |
TD | MIDAS DAQ configuration |
MIDAS DAQ configuration files
|
8x |
|
|
8
|
Fri Feb 27 12:41:34 2026 |
SB, TD, FGI | Friday 27 February 2026 |
BNC PB-5 settings
Amplitude 5.0V
|
11x |
|
|
6
|
Tue Feb 10 09:31:47 2026 |
Francisco Garcia Infantes | Detector Voltage vs Current | Analysis
of how the current changes with increasing
voltage for both detectors. |
|
|
|
18
|
Mon Mar 2 10:39:30 2026 |
SW, TD, SB, CLW | Detector SetUp. First Configuration | The first sample on beam is the NaCl target
#4. The shado cone was placed between the
LiF target and the chamber. |
9x |
|
|
3
|
Fri Jan 30 15:45:48 2026 |
Francisco Garcia Infantes | DAQ and cables status | Concerning the electronic
stuff. We will need: |
    |
|
|
1
|
Mon Jan 26 11:29:14 2026 |
Claudia | Count rate estimate and particle energies | Count rate estimate for all reaction measurements
planned.
|
 |
|
|
5
|
Tue Feb 10 09:03:26 2026 |
Francisco Garcia Infantes | Contents of shipment boxes | BOX
A
|
|
|
|
16
|
Mon Mar 2 09:47:13 2026 |
CLW | Clock Synchronisation Edinburgh PC , Geel monitor PC | T=0: Edinburgh Time 9:39:00
T=1:40: Geel Time 10:37:00
|
|
|
|
22
|
Mon Mar 2 13:50:20 2026 |
FGI, TD, SB, CLW | Cabling | The cables are plug in this way.
Cable 0 connected to Preamp A,
Positive output. (n+n side, toward the sample) |
|
|
|
26
|
Wed Mar 4 11:00:57 2026 |
CLW | 35Cl(n,p) proton peak, run with 3 MeV neutrons over night | Plot from Fran showing peak around expected
proton energy in both detectors. Top half
are strips of detector placed at 180degrees |
|