AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 2 of 4  ELOG logo
Entry  Fri Aug 11 16:50:58 2023, Nikolay Sosnin, EDET24 EDET24_Card.JPGEDET24_Cable.JPG
After inserting aluminium target, previously-dead channel 24 on EDET was re-plugged into a 12-bit card SPD02872. It is the only EDET on 12-bit card,
the rest are on 14-bit. From pulsers, there appears to be a 90 ns offset from this EDET to others, with EDET24 preceeding the rest. The last channel on
14-bit cards was broken, hence havng to use 12-bit.
Entry  Fri Aug 11 13:16:56 2023, Nikolay Sosnin, E Front Incorrect Cabling 
E front 2x16-way to 1x34-way IDC cable from the Junction Box to the IDC-Lemo 00 adaptor was found to be inserted upside-down - the 16-way IDC connectors
did not have polarisation keys - meaning the E detector p+n junction strip signals collected with 26Al for the first night are not working. Signals
from the dE p+n junction strips and E n+n Ohmic strips will be OK. The mistake occurred at the conclusion of the noise tests yesterday - see https://elog.ph.ed.ac.uk/nToF/52
Entry  Fri Aug 11 13:06:54 2023, Annie, Signal Spreadsheet info IMG_2920.JPGIMG_2921.JPGIMG_2922.JPG
Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods",
it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay,
Entry  Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check IMG_2915.JPGIMG_2916.JPGIMG_2918.JPG
 
Entry  Thu Aug 10 16:11:57 2023, TD, NS, AR, Noise 20230810_162959.JPGIMG_2906.jpeg20230810_164219.JPG

Observe c. 2mV p to p noise with DSO ( Z_in = 50 Ohm ) c. 60us period with HF structure. DSO connected to junction box via 34-way IDC - 16x Lemo-00 adaptor.
    Reply  Fri Aug 11 10:02:08 2023, TD, NS, AR, Noise 20230811_104233.jpg20230811_104253.jpg

Check RAL108 +/-15V PSU
Entry  Fri Aug 11 09:17:28 2023, Annie, Li target scans 7Li_foil_side1_post_processed.pdf7Li_foil_side2_post_processed.pdfIMG_2914.JPG
Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye.
Entry  Fri Aug 11 09:11:04 2023, Annie, Pulse Settings IMG_2908.JPGIMG_2909.JPGIMG_2910.JPGIMG_2911.JPG
 
Entry  Fri Aug 11 08:41:31 2023, Annie, Al target & chamber set up 15x
Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber.
Entry  Thu Aug 10 11:30:32 2023, Nikolay Sosnin, Silicons and LiF3+Gafchromic Target 18x
 
Entry  Thu Aug 10 10:50:15 2023, Nikolay Sosnin, Al26 Chamber Cabling/Vacuum/NIM 23x
 
Entry  Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil 20230809_165433.jpg20230810_085457.jpg20230809_165436.jpg
Gafchromics foil was mounted on empty brass frame back to back with Li sample

Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it
is ok now)
Entry  Thu Aug 10 10:04:13 2023, CLW, Photos inside chamber Al26 run Aug2023 8x
 
Entry  Thu Aug 10 09:55:50 2023, CLW, Photos of Chamber, Al26 Run Aug23 13x
 
Entry  Thu Aug 10 09:20:37 2023, CLW, Detector Signal Cabling Al26 Aug 2023 8x

delta E detector Cabling


Lemo Box Output Number
Signal Cable Bunker
Patch Panel Number
Signal
Cable Rack Area
FADC Number
DAQ Channel




0
72
2204803
9
02911
DEED-1


1
73
2204804
10
02911
DEED-2


2
74
2204805
11
02911
DEED-3


3
75
2204806
12
02911
DEED-4


4
76
2204807
13
02914
DEED-5


5
77
2204808
14
02914
DEED-6


6
80
2204809
15
02914
DEED-7


7
81
2204810
16
02914
DEED-8


8
82
2204811
17
Entry  Thu Aug 10 09:10:02 2023, CLW, Detector Setup Al26 Run 2023 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg
dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
Entry  Mon Jul 31 10:21:41 2023, Nikolay Sosnin, n_TOF Data and Filtering Al26_Filtering.pptx
 
Entry  Thu Jul 27 11:53:52 2023, TD, MSL type W1 detector data for 26Al(n,X) experiment EAR2, n_TOF 
MSL type W1(SS)-20

3186-9  20um Depletion voltage 3V Operating voltage 6V
Entry  Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary DSC00366.JPGDSC00346.JPG

Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
Setup to be used: 1 dE (16 strips, 20 um thickness)
+ 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
Sample and detectors to be mounted on the same flange


Things
to check:
Entry  Mon Jul 3 13:01:30 2023, Emmanuel, Boxes for nTOF experiments to CERN 
Box 1

1. RC412 Cables

2. Screws and parts for rails
Entry  Sun Oct 9 21:07:02 2022, Nikolay Sosnin, Boron Sample 3 Measurement 14x
21:15 Changed from detectors in-beam to boron-10 sample 3 in-beam (in-beam measurement got 1000 triggers, 500 of which were dedicated). The sample was
mounted identically to LiF 3. An attempt was made to replace the 20-micron dE detector with a 50-micron one, but the screwholes on the 50-micron detector
did not match the 300-micron E-detector ones and therefore could not be mounted. 20-micron detector was therefore re-attached. Planning to run for 12 hours
ELOG V3.1.4-unknown