AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 4 of 5  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Subject Text Attachments
  78   Thu Sep 12 15:26:30 2024 NickEAR2 Periodic Noise   IMG_20240912_161937023_HDR.jpg 
  86   Sat Jul 12 10:30:06 2025 Francisco García InfantesReport Experimental SetUp Ca41I'm attaching a report for the experimental
setup so far.

There is a main problem which haven't
 Experimental_Setup_Ca41.pdfCurrent_Value_Voltage_-15.jpegCurrent_Value_Voltage_15.jpegLeakage_Current_Detector.jpeg 
  41   Mon Jul 3 13:01:30 2023 EmmanuelBoxes for nTOF experiments to CERNBox 1

1. RC412 Cables

2. Screws and parts for rails
  
  68   Tue Sep 5 16:09:45 2023 EmmanuelDrop in gain for DEED 14Dear all,

There was an issue with one of
the strips of the deltaE detector (DEED 14),
 alndeed14.pngalndeed14b.pngalndeed14old.png 
  69   Wed Sep 27 09:54:06 2023 Emmanuel10B sample inWe switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg 
  70   Thu Sep 28 15:32:16 2023 EmmanuelLiF sample inWe switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day.
 20230928_154334.jpg20230928_155923.jpg20230926_115053.jpg20230928_155747.jpg 
  71   Mon Oct 2 08:53:06 2023 EmmanuelEmpty FrameAn empty frame (on the top) was placed
on Friday night.
 Empty_Frame.jpeg 
  72   Thu Dec 7 09:48:23 2023 EmmanuelMWDdetector and User InputMWDdetector and UserInput  UserInput_Silicons.hMWDdetector.cc 
  74   Tue Apr 16 12:24:01 2024 EmmanuelMWD amplitude (dE and E)   26Al_PDF.pdf 
  82   Tue Mar 18 13:28:30 2025 EmmanuelB10 and LiF data with Fast Fourier TransformAttached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants.
 B10.pdfLi.pdf 
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  5   Tue Oct 13 21:04:49 2015 Claudia LedererPhotos of Test Setup 5-10 October 2015some photos in high resolution of the test
setup 5-10 October 2015
 DSC00042.JPGDSC00048.JPGDSC00056.JPGDSC00065.JPG 
  24   Tue Aug 23 15:34:38 2016 ClaudiaLeakage currents 23.08.16 E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
  
  29   Thu Oct 6 09:28:33 2022 ClaudiaItems to be replaced for next runMissing/broken items identified

- long rails for fixing chamber
on support
 20221005_122654.pdf 
  30   Thu Oct 6 09:34:30 2022 ClaudiaTest setup Photos and cablingSetup 5.10.22

dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
 20221005_174742.jpg20221005_174759.jpg20221005_184752.jpg20221005_184801.jpg20221005_174742.jpg 
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
 DSC00366.JPGDSC00346.JPG 
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:
 20230809_181749.jpg20230809_181758.jpg20230809_172545.jpg20230809_172442.jpg 
  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta
E detector Cabling


 8x 
  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23   13x 
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023   8x 
ELOG V3.1.4-unknown