AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 4 of 5
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
91 Entries
Goto page
Previous
1
,
2
,
3
, 4,
5
Next
All
ID
Date
Author
Subject
Text
78
Thu Sep 12 15:26:30 2024
Nick
EAR2 Periodic Noise
86
Sat Jul 12 10:30:06 2025
Francisco García Infantes
Report Experimental SetUp Ca41
I'm attaching a report for the experimental
setup so far.
There is a main problem which haven't
41
Mon Jul 3 13:01:30 2023
Emmanuel
Boxes for nTOF experiments to CERN
Box 1
1. RC412 Cables
2. Screws and parts for rails
68
Tue Sep 5 16:09:45 2023
Emmanuel
Drop in gain for DEED 14
Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14),
69
Wed Sep 27 09:54:06 2023
Emmanuel
10B sample in
We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
70
Thu Sep 28 15:32:16 2023
Emmanuel
LiF sample in
We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day.
71
Mon Oct 2 08:53:06 2023
Emmanuel
Empty Frame
An empty frame (on the top) was placed
on Friday night.
72
Thu Dec 7 09:48:23 2023
Emmanuel
MWDdetector and User Input
MWDdetector and UserInput
74
Tue Apr 16 12:24:01 2024
Emmanuel
MWD amplitude (dE and E)
82
Tue Mar 18 13:28:30 2025
Emmanuel
B10 and LiF data with Fast Fourier Transform
Attached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants.
73
Mon Mar 25 12:57:30 2024
Clw
Adapters for ntof setup
10 new Adapters for lemo to bnc on my desk
5
Tue Oct 13 21:04:49 2015
Claudia Lederer
Photos of Test Setup 5-10 October 2015
some photos in high resolution of the test
setup 5-10 October 2015
24
Tue Aug 23 15:34:38 2016
Claudia
Leakage currents 23.08.16
E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
29
Thu Oct 6 09:28:33 2022
Claudia
Items to be replaced for next run
Missing/broken items identified
- long rails for fixing chamber
on support
30
Thu Oct 6 09:34:30 2022
Claudia
Test setup Photos and cabling
Setup 5.10.22
dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
42
Thu Jul 27 11:25:35 2023
Claudia
Al-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
45
Thu Aug 10 09:10:02 2023
CLW
Detector Setup Al26 Run 2023
dE Detector: W1-20 3186-9 20 um
E Detector: W1-150 3458-4 144 um
Voltages and Leakage Currents:
46
Thu Aug 10 09:20:37 2023
CLW
Detector Signal Cabling Al26 Aug 2023
delta
E detector Cabling
8x
47
Thu Aug 10 09:55:50 2023
CLW
Photos of Chamber, Al26 Run Aug23
13x
48
Thu Aug 10 10:04:13 2023
CLW
Photos inside chamber Al26 run Aug2023
8x
Goto page
Previous
1
,
2
,
3
, 4,
5
Next
All
ELOG V3.1.4-unknown