| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
59
|
Fri Aug 11 13:16:56 2023 |
Nikolay Sosnin | E Front Incorrect Cabling | E front 2x16-way to 1x34-way IDC cable
from the Junction Box to the IDC-Lemo 00
adaptor was found to be inserted upside-down |
|
|
|
60
|
Fri Aug 11 16:50:58 2023 |
Nikolay Sosnin | EDET24 | After inserting aluminium target, previously-dead
channel 24 on EDET was re-plugged into a
12-bit card SPD02872. It is the only EDET |
 |
|
|
61
|
Sat Aug 12 09:24:19 2023 |
Nikolay Sosnin | 26Al Protons | Here is a Google spreadsheet for counting
protons for the runs:
https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing |
|
|
|
65
|
Thu Aug 17 10:26:51 2023 |
Nikolay Sosnin | Data Processing | To run raw2root on LXPLUS, you will need
to add the following line to your .bashrc,
performed using |
|
|
|
28
|
Thu May 26 09:20:32 2022 |
Nick / Claudia | Inventory of Items at n_TOF for (n,cp) experiments | Detectors currently in the boxes:
2x MSL type W1(SS)-50, 2902-4 (53um),
2940-6 (55um) |
 |
|
|
76
|
Thu Sep 12 11:07:29 2024 |
Nick | 40K Borrowed Items | We borrowed from n_TOF:
1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small |
|
|
|
78
|
Thu Sep 12 15:26:30 2024 |
Nick | EAR2 Periodic Noise | |
|
|
|
86
|
Sat Jul 12 10:30:06 2025 |
Francisco García Infantes | Report Experimental SetUp Ca41 | I'm attaching a report for the experimental
setup so far.
There is a main problem which haven't |
   |
|
|
41
|
Mon Jul 3 13:01:30 2023 |
Emmanuel | Boxes for nTOF experiments to CERN | Box 1
1. RC412 Cables
2. Screws and parts for rails |
|
|
|
68
|
Tue Sep 5 16:09:45 2023 |
Emmanuel | Drop in gain for DEED 14 | Dear all,
There was an issue with one of
the strips of the deltaE detector (DEED 14), |
  |
|
|
69
|
Wed Sep 27 09:54:06 2023 |
Emmanuel | 10B sample in | We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in |
    |
|
|
70
|
Thu Sep 28 15:32:16 2023 |
Emmanuel | LiF sample in | We switched from 10B target (number 1)
to LiF target (number 3). We planned to take
this measurement for one day. |
   |
|
|
71
|
Mon Oct 2 08:53:06 2023 |
Emmanuel | Empty Frame | An empty frame (on the top) was placed
on Friday night. |
|
|
|
72
|
Thu Dec 7 09:48:23 2023 |
Emmanuel | MWDdetector and User Input | MWDdetector and UserInput |
 |
|
|
74
|
Tue Apr 16 12:24:01 2024 |
Emmanuel | MWD amplitude (dE and E) | |
|
|
|
82
|
Tue Mar 18 13:28:30 2025 |
Emmanuel | B10 and LiF data with Fast Fourier Transform | Attached is the B10 and LiF data with
Fast Fourier Transform and varying time
constants. |
 |
|
|
100
|
Mon Aug 18 09:19:27 2025 |
Emmanuel | DEED 11 NO Gamma Flash Signal | We observed that DEED11 no longer have
Gamma flash signals.
Before the drop, it had some weird |
    |
|
|
101
|
Thu Aug 21 16:19:43 2025 |
Emmanuel | Checking DEED 11 with the Pulser | We checked DEED 11 with the Pulser and
it was still unresponsive (See screenshot).
Next, we will change the LEMO cables |
|
|
|
105
|
Wed Sep 24 21:35:27 2025 |
Emmanuel | 26AL New processing routine with FFT | |
29x |
|
|
73
|
Mon Mar 25 12:57:30 2024 |
Clw | Adapters for ntof setup | 10 new Adapters for lemo to bnc on my desk |
 |