  nToF, Page 5 of 6  ELOG logo
ID Date Author Subjectdown
  32   Thu Oct 6 11:45:39 2022 Nikolay SosninAssembly Setup Days 1 and 2

Photographs of assembly up to the first pulser test with LiF3.

  13   Sun Jul 31 13:43:56 2016 SarahAlpha spectra

 Pulser set to 100 pps.

Shaping amp:
Gain: 1x1.0x50
Tau: 2 us
Negative polarity.


 

  50   Thu Aug 10 10:50:15 2023 Nikolay SosninAl26 Chamber Cabling/Vacuum/NIM
  42   Thu Jul 27 11:25:35 2023 ClaudiaAl-26 planning meeting summary
  • Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
  • Setup to be used: 1 dE (16 strips, 20 um thickness) + 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
  • Sample and detectors to be mounted on the same flange

Things to check:

  • alignment with beam centre (lasers and/or gafchromics foils)
  • is the setup stable to knockes, can all detector / sample positions be well reproduced when making changes

Once setup us completed:

  • checks with pulser
  • mounf LiF sample number 3 and run with neutron beam
  • check that all strips have signals
  • confirm shape of gamma flash and that short times can be anaysed in both detectors (~1.8 us after flash)

If everything working:

  • measure LiF-3 and the switch to Al-26
  • towards end of the run we can also measure B-3 and the empty brass frame (Frame without mylar)
  • proton statistics: 1E17 LiF-3, 1F17 B-3, ~3E17 Empty, 5.5 E18 Al-26

Travel times

Nick: 8-16, Annie 8-12, Tom, 7 -?, Claudia, 8-10, Emmanuel asap until end of run

Measurement runs until Octover 2nd. Disassembly by Nick and Emmanuel.

additional trips during the measurement as required (if something breaks/fails etc. )

 

Attached: photos of previous setup

 

TO Do: MCA availability at nTOF for quick noise checks (Nick)

            how many  channels in 14 bit, how many 12 bit (Nick)

          depletion voltages   for detectors (Tom)

          Register the eqipment at CERN as Edinburgh property (Claudia)

 

 

  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set up

Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber.

  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup

10 new Adapters for lemo to bnc on my desk

  76   Thu Sep 12 11:07:29 2024 Nick40K Borrowed Items

We borrowed from n_TOF:

1x O-ring for circular side-flanges on the chamber (the borrowed part has a small green marker cross on it)

10x LIMO-to-BNC connectors (BNC female) from electronics lab outside EAR1

  80   Mon Sep 16 12:36:45 2024 TD34-way IDC to 37-way D connector ribbon cables
The 2x sets of 34-way IDC to 37-way D connctor ribbon cables used at GSI for the two-alpha decay measurement have been located - see attachments 1-4.

They have been packed for shipment to CERN and delivered to stores for shipment. Awaiting quotation and P&M PO.
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al Protons

Here is a Google spreadsheet for counting protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing

  105   Wed Sep 24 21:35:27 2025 Emmanuel26AL New processing routine with FFT
  69   Wed Sep 27 09:54:06 2023 Emmanuel10B sample in

We switched from Aluminium target to Boron Target (number 1) on Tuesday (26th of Sept.). The Aluminium target was placed in the material room by the RP. We will change to LiF (number 3) on Thursday (28th of Sept.)

  10   Fri Oct 16 16:11:41 2015 Sarah Lonsdale09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current

 Leakage before take down:
de 0.07 micro A
E 0.47 micro A

  9   Fri Oct 16 16:01:41 2015 Sarah Lonsdale08/10/15 Removed source and sample, leakage current check

Removed source and removed Li sample for blank frame test

Leakage
DE 0.06micro A
E 0.41 micro A

 

DAQ 
56.25 sample rate all except EBED 5,6,7

  8   Fri Oct 16 15:56:01 2015 Sarah Lonsdale07/10/15 Alpha source in, change to pulser delay

Alpha source in - containing 148Gd, 241Am, 239Pu, 244Cm (4x 1kBq)

Leakage on arrival
dE 0.08microA , 19V

E 0.48microA 132V

At leaving
dE 0.08 micro A
E 0.41 micro A

Pulser to 20ms (2015-10-07_13.58.08.jpg)


DAQ:

EBED 5,6,7 have post sample 16382
Increased further at 4pm - 16000+ post sample for 225 samples

 

 

  6   Fri Oct 16 15:36:13 2015 Sarah Lonsdale06/10/15 Leakage, dE signal problem solving and external pulser trigger

 Leakage tues am
0.03 microA dE
0.52 microA E

Before leaving at 11.30am or so-
Bias dE up to 20V, leakage to 0.07microA
E has 0.51 microA

Problem solving dE signals...
SIG l6d6 a has signal of 600mV
SIG 24 has signal of 500mV
White noise is comparable, but transient ringing on l6d6 could indicate higher capacitance

Testing dE for signal with alpha source- but removed before continuing run.
dE sees particles after rotating ribbon by 180 degrees (abnormal detector)

External pulser triggering (2015-10-06_11.30.jpg )
Pulsar trigger, +2.5V external from proton pulse (10ms before beam), lasts 1ms (width).

Convert pulse input from TTL to NIM to go into delay (15ms).
Start delay in dual timer, then output to trigger pulser (TTL)

  7   Fri Oct 16 15:41:14 2015 Sarah Lonsdale06/10/15 Changes to DAQ and pulser settings

 Pulser out of 5,6,7 EFED- extended to 32ms

Changed full scale on ADC to 0.2V,
Offset changed by factor of 10.
Zero suppression on, de -3mV thresh
E +-5mV thresh
Post sample 4096

5pm increased post sample for spd-02886 to 8192 as higher sample rate due to pick up.

Corrected EBED 4 offset.

(Again, all DAQ settings also recorded to the nToF erunbook)

Changed pulser to 13ms.

  2   Mon Oct 12 11:50:52 2015 Sarah Lonsdale05/10/15 Pulser, Wiring information and DAQ initial set up

600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg and 2015-10-05_15.22.46.jpg



Leakage currents on detectors:

In air
10v: 0.03 micro amp det 1 leakage -dE
132v: 0.47micro amp det 2 leakage- E det

In vacuum
DE 0.04 micro amp
E 0.46 micro amp

Same size of signal at ADC hence 50 ohms coaxial.

The following channel explanations refer to cables at control area (not vault) see (
2015-10-05_15.19.54.jpg) for full wiring information.


dE det= DEED 0 to -2V full scale, Lower limit 1800mV, Threshold 0V, thresh neg, pre 1024, post 2048, 20ms window, sample rate 225 MS/s
- L6D6 A = de 4
- L6D6 B = de 5
- L6D6 C = de 6
- L6D6 D = de 7
- LaBr 3 = de 8
- 21 = de 9

E det front= EFED 0 to -2V full scale, Lower limit 1800mV, Threshold 0V, thresh neg, pre 1024, post 2048, 20ms window, sample rate 225 MS/s
- 10 = Ef 3
- 12 = Ef 4
- 13 = Ef 5
- 14 = Ef 6
- 15 = Ef 7

E det back= EBED 0 to +2V full scale, Lower limit -200mV, Threshold 0V, thresh pos, pre 1024, post 2048, 20ms window, sample rate 225 MS/s (except EBED 5,6,7 which MUST be 900MS/s due to beam pick up signal)
- 16 = Eb 3
- 18 = Eb 4
- 20 = Eb 5
- 38 = Eb 6
- 40 = Eb 7

Run number 203385 on https://project-ntof.web.cern.ch/project-ntof/eRunbookEAR2.php

  3   Mon Oct 12 12:04:51 2015 Sarah Lonsdale05/10/15 Photo of detector distances and layout

Fairly self explanatory, note that images with time-stamps before 13.08.29 were taken before fitting the o-ring on the flange and therefore lateral positions will be different to photos after 13.08.29. Individual detector heights were not changed.

  4   Mon Oct 12 12:07:24 2015 Sarah Lonsdale05/10/15 Changes to DAQ settings

 Note that detailed DAQ information available from project-ntof.cern.ch erunbook ear2.

As a rough guide: 6/7 mV per MeV

5mV thresh back side E, -5mV front E
-5mV dE
Implemented from Run 203388

From Run 203389
-7mV in Deed 8&9, EFED
+7mV in EBED

Run 203390
Thresholds back to -6mV for deed 8&9

Gamma flash ends at 70micro sec, corresponds to neutron energy of ~200keV...

  1   Mon Oct 12 11:27:02 2015 Sarah Lonsdale05/10/15 - Set up notes

 20 micron (see 2015-10-05_12.46.59.jpg for detailed information) and 500 micron detectors

Testing preamps using pulser through common wire to both sets of preamps (see 2015-10-05_13.12.01.jpg).

64 x 14mA pos signals 15V
64 x 4mA neg signals 15V (see 2015-10-05_12.02.00.jpfor example on oscilloscope)

Sample has 105 microgram Li-6 (LiF - 95% enriched) 105 micron thick (2015-10-05_12.12.15.jpis Li-6 side up, 2015-10-05_12.12.26.jpis Li-6 side down... do not mix up!)

dE uses 22, 23 on ribbon connector, E 24, 25
dE from bias supply 2, E from bias 1

de and E pos signals needed to be inverted using jumpers. de negs not used, only 16ch (see 2015-10-05_14.59.12.jpg)


de first and last (0,15) are noisy- don't use. E detector ch 0 doesn't work.
Channels used dE 4-9, E(pos) 3-7 and E(neg) 3-7 (see
2015-10-05_15.11.37.jpg and 2015-10-05_15.11.44.jpg)