AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 5 of 6
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
101 Entries
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
Next
All
ID
Date
Author
Subject
Text
5
Tue Oct 13 21:04:49 2015
Claudia Lederer
Photos of Test Setup 5-10 October 2015
some photos in high resolution of the test
setup 5-10 October 2015
24
Tue Aug 23 15:34:38 2016
Claudia
Leakage currents 23.08.16
E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA
29
Thu Oct 6 09:28:33 2022
Claudia
Items to be replaced for next run
Missing/broken items identified
- long rails for fixing chamber
on support
30
Thu Oct 6 09:34:30 2022
Claudia
Test setup Photos and cabling
Setup 5.10.22
dE 20 um (ID 2837-33) and 494 um
double sided (ID 1194-9)
42
Thu Jul 27 11:25:35 2023
Claudia
Al-26 planning meeting summary
Start 9th August, access to EAR-2
11 am earliest but can start in rack area
before
Setup to be used: 1 dE
104
Thu Sep 18 14:11:29 2025
CLW, EO
New processing
Comparison strip 6 amplitude spectra anew
(red) vs (old) processing (Screenshot). Slight
shift in amplitude and slightly less counts
45
Thu Aug 10 09:10:02 2023
CLW
Detector Setup Al26 Run 2023
dE Detector: W1-20 3186-9 20 um
E Detector: W1-150 3458-4 144 um
Voltages and Leakage Currents:
46
Thu Aug 10 09:20:37 2023
CLW
Detector Signal Cabling Al26 Aug 2023
delta
E detector Cabling
8x
47
Thu Aug 10 09:55:50 2023
CLW
Photos of Chamber, Al26 Run Aug23
13x
48
Thu Aug 10 10:04:13 2023
CLW
Photos inside chamber Al26 run Aug2023
8x
49
Thu Aug 10 10:05:48 2023
CLW
Gafchromics Foil
Gafchromics foil was mounted on empty brass
frame back to back with Li sample
Neutron beam goes well through
81
Wed Feb 12 13:51:02 2025
CLW
expected counts B and Li
The rootfiles countsB.root and countsLi.root
contain histograms of count spectra that
would be expected at n_TOF for a 10B and
6x
83
Fri Jun 20 09:49:11 2025
CLW
Silicon detector setup description
84
Mon Jun 23 09:36:32 2025
CLW
Expected Spectra for Li and B in a 50 um Si detector
B looks as we are used to , Li tritons
are now stopped in the detector and should
appear around 2.8 MeV.
93
Wed Jul 16 13:56:00 2025
CLW
Links to photos and proton counting excel sheet
Photos
setup
Excel
94
Fri Jul 18 12:04:36 2025
CLW
Presence at CERN
Excel sheet for presence at CERN during
41Ca run. Please update if required.
https://docs.google.com/spreadsheets/d/19OzH7bpnHb-YeOskNBGlrhEkPZmDsPDw9y0tleU0Soo/edit?gid=0#gid=0
53
Fri Aug 11 08:41:31 2023
Annie
Al target & chamber set up
Phtotos of the front & back of the
Al target and what it looked like once mounted
and in the chamber.
15x
54
Fri Aug 11 09:11:04 2023
Annie
Pulse Settings
55
Fri Aug 11 09:17:28 2023
Annie
Li target scans
Processed scans of both sides of the Li
target showing the beam spot, and an image
showing what it looks like to the eye.
57
Fri Aug 11 10:12:02 2023
Annie
Pressure, voltage and current check
Goto page
Previous
1
,
2
,
3
,
4
, 5,
6
Next
All
ELOG V3.1.3-7933898