Tue Oct 13 21:04:49 2015, Claudia Lederer, Photos of Test Setup 5-10 October 2015   
|
| some photos in high resolution of the test setup 5-10 October 2015 |
Tue Aug 23 15:34:38 2016, Claudia, Leakage currents 23.08.16
|
E = 0.03uA
dE = 0.04uA
PHDI = 0.09uA |
Thu Oct 6 09:28:33 2022, Claudia, Items to be replaced for next run
|
Missing/broken items identified
- long rails for fixing chamber on support
- vacuum valve (ours is broken) |
Thu Oct 6 09:34:30 2022, Claudia, Test setup Photos and cabling    
|
Setup 5.10.22
dE 20 um (ID 2837-33) and 494 um double sided (ID 1194-9)
46 channels (2 connectors missing) |
Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary 
|
Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
Setup to be used: 1 dE (16 strips, 20 um thickness)
+ 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
Sample and detectors to be mounted on the same flange
Things
to check: |
Thu Sep 18 14:11:29 2025, CLW, EO, New processing 
|
Comparison strip 6 amplitude spectra anew (red) vs (old) processing (Screenshot). Slight shift in amplitude and slightly less counts with new processing
in t+alpha peaks (1% level). This could be either due to less noise background, shift in neutron energy calibration (amplitude spectra shown with a cut
of 100 keV). pdf plot shows new vs old for neutron energy vs counts. only minor differences at low neutron energy, new processing makes spectra cleaner |
Thu Aug 10 09:10:02 2023, CLW, Detector Setup Al26 Run 2023   
|
dE Detector: W1-20 3186-9 20 um
E Detector: W1-150 3458-4 144 um
Voltages and Leakage Currents: |
Thu Aug 10 09:20:37 2023, CLW, Detector Signal Cabling Al26 Aug 2023 8x
|
delta E detector Cabling
Lemo Box Output Number
Signal Cable Bunker
Patch Panel Number
Signal
Cable Rack Area
FADC Number
DAQ Channel
0
72
2204803
9
02911
DEED-1
1
73
2204804
10
02911
DEED-2
2
74
2204805
11
02911
DEED-3
3
75
2204806
12
02911
DEED-4
4
76
2204807
13
02914
DEED-5
5
77
2204808
14
02914
DEED-6
6
80
2204809
15
02914
DEED-7
7
81
2204810
16
02914
DEED-8
8
82
2204811
17 |
Thu Aug 10 09:55:50 2023, CLW, Photos of Chamber, Al26 Run Aug23 13x
|
| |
Thu Aug 10 10:04:13 2023, CLW, Photos inside chamber Al26 run Aug2023 8x
|
| |
Thu Aug 10 10:05:48 2023, CLW, Gafchromics Foil  
|
Gafchromics foil was mounted on empty brass frame back to back with Li sample
Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it
is ok now) |
Wed Feb 12 13:51:02 2025, CLW, expected counts B and Li 6x
|
The rootfiles countsB.root and countsLi.root contain histograms of count spectra that would be expected at n_TOF for a 10B and a 6Li target,
respectively. The units in y are arbitrary. This can be used to check, if we can reproduce the expected trend with our Li and B measurements. So the histograms
called "counts" can be directly compared to the histograms called "energy" in Sili_deed.c (they should have the same binning). You |
Fri Jun 20 09:49:11 2025, CLW, Silicon detector setup description
|
| |
Mon Jun 23 09:36:32 2025, CLW, Expected Spectra for Li and B in a 50 um Si detector
|
| B looks as we are used to , Li tritons are now stopped in the detector and should appear around 2.8 MeV. |
Wed Jul 16 13:56:00 2025, CLW, Links to photos and proton counting excel sheet
|
Photos
setup
Excel |
Fri Jul 18 12:04:36 2025, CLW, Presence at CERN
|
Excel sheet for presence at CERN during 41Ca run. Please update if required.
https://docs.google.com/spreadsheets/d/19OzH7bpnHb-YeOskNBGlrhEkPZmDsPDw9y0tleU0Soo/edit?gid=0#gid=0 |
Fri Aug 11 08:41:31 2023, Annie, Al target & chamber set up 15x
|
| Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber. |
Fri Aug 11 09:11:04 2023, Annie, Pulse Settings   
|
| |
Fri Aug 11 09:17:28 2023, Annie, Li target scans  
|
| Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye. |
Fri Aug 11 10:12:02 2023, Annie, Pressure, voltage and current check  
|
| |