AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 5 of 6  ELOG logo
Entry  Thu Oct 6 11:45:39 2022, Nikolay Sosnin, Assembly Setup Days 1 and 2 25x
Photographs of assembly up to the first pulser test with LiF3.
Entry  Sun Jul 31 13:43:56 2016, Sarah, Alpha spectra DEED0_alpha_spec_pulser.SpeDEED5_alpha_spec_pulser.SpeDEED15_alpha_spec_pulser.SpeEFED9_alpha_spec_pulser.SpePHDI_alpha_spec_pulser.Spe
 Pulser set to 100 pps.
Shaping amp:
Gain: 1x1.0x50
Entry  Thu Aug 10 10:50:15 2023, Nikolay Sosnin, Al26 Chamber Cabling/Vacuum/NIM 23x
 
Entry  Thu Jul 27 11:25:35 2023, Claudia, Al-26 planning meeting summary DSC00366.JPGDSC00346.JPG

Start 9th August, access to EAR-2 11 am earliest but can start in rack area before
Setup to be used: 1 dE (16 strips, 20 um thickness)
+ 1 E (16x16 strips, 150 um thickness. We have a spare for each thickness
Sample and detectors to be mounted on the same flange


Things
to check:
Entry  Fri Aug 11 08:41:31 2023, Annie, Al target & chamber set up 15x
Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber.
Entry  Mon Mar 25 12:57:30 2024, Clw, Adapters for ntof setup 20240325_125536.jpg20240325_125528.jpg
10 new Adapters for lemo to bnc on my desk
Entry  Thu Sep 12 11:07:29 2024, Nick, 40K Borrowed Items 
We borrowed from n_TOF:

1x O-ring for circular side-flanges on the chamber (the borrowed part has a small green marker cross on it)

10x LIMO-to-BNC connectors (BNC female) from electronics lab outside EAR1
Entry  Mon Sep 16 12:36:45 2024, TD, 34-way IDC to 37-way D connector ribbon cables 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg

The 2x sets of 34-way IDC to 37-way D connctor ribbon cables used at GSI for the two-alpha decay measurement have been located - see attachments 1-4.
Entry  Sat Aug 12 09:24:19 2023, Nikolay Sosnin, 26Al Protons 
Here is a Google spreadsheet for counting protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
Entry  Wed Sep 24 21:35:27 2025, Emmanuel, 26AL New processing routine with FFT 29x
 
Entry  Wed Sep 27 09:54:06 2023, Emmanuel, 10B sample in 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg
We switched from Aluminium target to Boron Target (number 1) on Tuesday (26th of Sept.). The Aluminium target was placed in the material room
by the RP. We will change to LiF (number 3) on Thursday (28th of Sept.)
Entry  Fri Oct 16 16:11:41 2015, Sarah Lonsdale, 09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current 2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg
 Leakage before take down:
Entry  Fri Oct 16 16:01:41 2015, Sarah Lonsdale, 08/10/15 Removed source and sample, leakage current check 
Removed source and removed Li sample for blank frame test

Entry  Fri Oct 16 15:56:01 2015, Sarah Lonsdale, 07/10/15 Alpha source in, change to pulser delay 6x
Alpha source in - containing 148Gd, 241Am, 239Pu, 244Cm    (4x 1kBq)
Entry  Fri Oct 16 15:36:13 2015, Sarah Lonsdale, 06/10/15 Leakage, dE signal problem solving and external pulser trigger 6x
 Leakage tues am
Entry  Fri Oct 16 15:41:14 2015, Sarah Lonsdale, 06/10/15 Changes to DAQ and pulser settings 2015-10-06_delay.jpg2015-10-06_trig.jpg
 Pulser out of 5,6,7 EFED- extended to 32ms
Entry  Mon Oct 12 11:50:52 2015, Sarah Lonsdale, 05/10/15 Pulser, Wiring information and DAQ initial set up 2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg
600mV in 50ohm coax with 25 hz pulser (positive signal) - see 2015-10-05_15.19.54.jpg 
Entry  Mon Oct 12 12:04:51 2015, Sarah Lonsdale, 05/10/15 Photo of detector distances and layout 8x
Fairly self explanatory, note that images with time-stamps before 13.08.29 were taken before fitting the o-ring on the flange and therefore lateral positions
will be different to photos after 13.08.29. Individual detector heights were not changed.
Entry  Mon Oct 12 12:07:24 2015, Sarah Lonsdale, 05/10/15 Changes to DAQ settings 
 Note that detailed DAQ information available from project-ntof.cern.ch erunbook ear2.
As a rough guide: 
Entry  Mon Oct 12 11:27:02 2015, Sarah Lonsdale, 05/10/15 - Set up notes 8x
 20 micron (see 2015-10-05_12.46.59.jpg
ELOG V3.1.3-7933898