AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 5 of 5  ELOG logo
ID Date Author Subjectdown Text Attachments
  73   Mon Mar 25 12:57:30 2024 ClwAdapters for ntof setup10 new Adapters for lemo to bnc on my desk  20240325_125536.jpg20240325_125528.jpg 
  76   Thu Sep 12 11:07:29 2024 Nick40K Borrowed ItemsWe borrowed from n_TOF:

1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small
  
  80   Mon Sep 16 12:36:45 2024 TD34-way IDC to 37-way D connector ribbon cables
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha
 20240916_121057_(1).jpg20240916_121052_(1).jpg20240916_121047_(1).jpg20240916_121003_(1).jpg 
  61   Sat Aug 12 09:24:19 2023 Nikolay Sosnin26Al ProtonsHere is a Google spreadsheet for counting
protons for the runs:

https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
  
  69   Wed Sep 27 09:54:06 2023 Emmanuel10B sample inWe switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
 20230926_113136.jpg20230926_113811.jpg20230926_115036.jpg20230926_115053.jpg20230926_111737.jpg 
  10   Fri Oct 16 16:11:41 2015 Sarah Lonsdale09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current   2015-10-09_09.16.16.jpg2015-10-09_09.16.22.jpg2015-10-09_09.29.23.jpg2015-10-09_09.29.35.jpg2015-10-09_09.30.02.jpg 
  9   Fri Oct 16 16:01:41 2015 Sarah Lonsdale08/10/15 Removed source and sample, leakage current checkRemoved source and removed Li sample for
blank frame test
  
  8   Fri Oct 16 15:56:01 2015 Sarah Lonsdale07/10/15 Alpha source in, change to pulser delay   6x 
  6   Fri Oct 16 15:36:13 2015 Sarah Lonsdale06/10/15 Leakage, dE signal problem solving and external pulser trigger   6x 
  7   Fri Oct 16 15:41:14 2015 Sarah Lonsdale06/10/15 Changes to DAQ and pulser settings   2015-10-06_delay.jpg2015-10-06_trig.jpg 
  2   Mon Oct 12 11:50:52 2015 Sarah Lonsdale05/10/15 Pulser, Wiring information and DAQ initial set up   2015-10-05_15.19.54.jpg2015-10-05_15.20.24.jpg2015-10-05_15.22.39.jpg2015-10-05_15.22.46.jpg 
  3   Mon Oct 12 12:04:51 2015 Sarah Lonsdale05/10/15 Photo of detector distances and layoutFairly self explanatory, note that images
with time-stamps before 13.08.29 were taken
before fitting the o-ring on the flange and
 8x 
  4   Mon Oct 12 12:07:24 2015 Sarah Lonsdale05/10/15 Changes to DAQ settings Note that detailed DAQ information
available from project-ntof.cern.ch erunbook
ear2.
  
  1   Mon Oct 12 11:27:02 2015 Sarah Lonsdale05/10/15 - Set up notes   8x 
  87   Sat Jul 12 11:25:35 2025 Selin The Detector Bias-Leakage Current DataThis Excel sheet has the detector bias-leakage
current data and plot for both detectors.

Detector 2 has lower leakage current
 Ca-VoltageCurrent.xlsx 
ELOG V3.1.4-unknown