AIDA
GELINA
BRIKEN
nToF
CRIB
ISOLDE
CIRCE
nTOFCapture
DESPEC
DTAS
EDI_PSA
179Ta
CARME
StellarModelling
DCF
K40
nToF, Page 5 of 5
New
|
Find
|
Select
|
Import
|
Config
|
Last day
|
Help
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
95 Entries
Goto page
Previous
1
,
2
,
3
,
4
, 5
All
ID
Date
Author
Subject
Text
73
Mon Mar 25 12:57:30 2024
Clw
Adapters for ntof setup
10 new Adapters for lemo to bnc on my desk
76
Thu Sep 12 11:07:29 2024
Nick
40K Borrowed Items
We borrowed from n_TOF:
1x O-ring for circular side-flanges
on the chamber (the borrowed part has a small
80
Mon Sep 16 12:36:45 2024
TD
34-way IDC to 37-way D connector ribbon cables
The 2x sets of 34-way IDC to 37-way D connctor
ribbon cables used at GSI for the two-alpha
61
Sat Aug 12 09:24:19 2023
Nikolay Sosnin
26Al Protons
Here is a Google spreadsheet for counting
protons for the runs:
https://docs.google.com/spreadsheets/d/1INX8G9GAu-M70SdZdz55qXnMZNXKXLW7xfFH-eaLuQw/edit?usp=sharing
69
Wed Sep 27 09:54:06 2023
Emmanuel
10B sample in
We switched from Aluminium target to Boron
Target (number 1) on Tuesday (26th of
Sept.). The Aluminium target was placed in
10
Fri Oct 16 16:11:41 2015
Sarah Lonsdale
09/10/15 Photos of detectors (reversed dE wiring) and upper level frame for future set up, leakage current
9
Fri Oct 16 16:01:41 2015
Sarah Lonsdale
08/10/15 Removed source and sample, leakage current check
Removed source and removed Li sample for
blank frame test
8
Fri Oct 16 15:56:01 2015
Sarah Lonsdale
07/10/15 Alpha source in, change to pulser delay
6x
6
Fri Oct 16 15:36:13 2015
Sarah Lonsdale
06/10/15 Leakage, dE signal problem solving and external pulser trigger
6x
7
Fri Oct 16 15:41:14 2015
Sarah Lonsdale
06/10/15 Changes to DAQ and pulser settings
2
Mon Oct 12 11:50:52 2015
Sarah Lonsdale
05/10/15 Pulser, Wiring information and DAQ initial set up
3
Mon Oct 12 12:04:51 2015
Sarah Lonsdale
05/10/15 Photo of detector distances and layout
Fairly self explanatory, note that images
with time-stamps before 13.08.29 were taken
before fitting the o-ring on the flange and
8x
4
Mon Oct 12 12:07:24 2015
Sarah Lonsdale
05/10/15 Changes to DAQ settings
Note that detailed DAQ information
available from project-ntof.cern.ch erunbook
ear2.
1
Mon Oct 12 11:27:02 2015
Sarah Lonsdale
05/10/15 - Set up notes
8x
87
Sat Jul 12 11:25:35 2025
Selin
The Detector Bias-Leakage Current Data
This Excel sheet has the detector bias-leakage
current data and plot for both detectors.
Detector 2 has lower leakage current
Goto page
Previous
1
,
2
,
3
,
4
, 5
All
ELOG V3.1.4-unknown