AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  nToF, Page 5 of 5  ELOG logo
  ID Date Authordown Subject
  45   Thu Aug 10 09:10:02 2023 CLWDetector Setup Al26 Run 2023

dE Detector: W1-20 3186-9 20 um

E Detector: W1-150 3458-4 144 um

Voltages and Leakage Currents:

dE: 6 V, 0.02 muA

E: 50 V, 0.05 muA

  46   Thu Aug 10 09:20:37 2023 CLWDetector Signal Cabling Al26 Aug 2023
delta E detector Cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 72 2204803 9 02911 DEED-1
1 73 2204804 10 02911 DEED-2
2 74 2204805 11 02911 DEED-3
3 75 2204806 12 02911 DEED-4
4 76 2204807 13 02914 DEED-5
5 77 2204808 14 02914 DEED-6
6 80 2204809 15 02914 DEED-7
7 81 2204810 16 02914 DEED-8
8 82 2204811 17 02917 DEED-9
9 85 2204812 18 02917 DEED-10
10 86 2204813 19 02917 DEED-11
11 87 2204814 20 02917 DEED-12
12 88 2204815 21 02916 DEED-13
13 90 2204816 22 02916 DEED-14
14 95 2204817 23 02916 DEED-15
15 96 2204818 24 02916 DEED-16
E p side cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 97 2204819 25 4683 EDET-1
1 101 2204820 26 4683 EDET-2
2 103 2204821 27 4683 EDET-3
3 104 2204822 28 4683 EDET-4
4 105 2204823 29 4684 EDET-5
5 106 2204824 30 4684 EDET-6
6 107 2204825 31 4684 EDET-7
7 108 2204826 32 4684 EDET-8
8 109 2204827 33 4682 EDET-9
9 110 2204828 34 4677 EDET-10
10 111 2204829 35 4682 EDET-11
11 112 2204830 36 4682 EDET-12
12 113 2204831 37 4697 EDET-13
13 114 2204832 38 4697 EDET-14
14 116 2204833 39 4697 EDET-15
15 117 2204834 40 4697 EDET-16
E n side cabling
Lemo Box Output Number Signal Cable Bunker Patch Panel Number Signal Cable Rack Area FADC Number DAQ Channel
0 118 2204835 41 5348? EDET-17
1 119 2204836 42 5348? EDET-18
2 120 2204837 43 5348? EDET-19
3 121 2204838 44 5348? EDET-20
4 123 2204839 45 4677 EDET-21
5 124 2204840 46 4677 EDET-22
6 125 2204841 47 4677 EDET-23
7 126 2204842 48 2872 EDET-24
8 127 2204843 49 4636 EDET-25
9 128 2204844 50 4636 EDET-26
10 129 2204845 51 4636 EDET-27
11 130 2204846 52 4636 EDET-28
12 131 2204847 53 4674 EDET-29
13 132 2204848 54 4674 EDET-30
14 133 2204849 55 4674 EDET-31
15 134 2204850 56 4674 EDET-32

 

  47   Thu Aug 10 09:55:50 2023 CLWPhotos of Chamber, Al26 Run Aug23
  48   Thu Aug 10 10:04:13 2023 CLWPhotos inside chamber Al26 run Aug2023
  49   Thu Aug 10 10:05:48 2023 CLWGafchromics Foil

Gafchromics foil was mounted on empty brass frame back to back with Li sample

Neutron beam goes well through the sample. Centered ~1 cm from sample center. Conclusion: no changes needed (too risky to make it worse and it is ok now)

  81   Wed Feb 12 13:51:02 2025 CLWexpected counts B and Li

The rootfiles countsB.root and countsLi.root contain histograms of count spectra that would be expected at n_TOF for a 10B and a 6Li target, respectively. The units in y are arbitrary. This can be used to check, if we can reproduce the expected trend with our Li and B measurements. So the histograms called "counts" can be directly compared to the histograms called "energy" in Sili_deed.c (they should have the same binning). You need to scale the histogram to get a decent overlap. You can use this also to estimate the neutron energy calibration - the thermal bump at low energy will give you a good idea of the flight path length. Structure at high energy will give you a better idea on the offset.

The files 6Li_endf.root and 10B_endf.root are the original cross section files, and countrate_calc.C is the file used to produce the count spectra.

 

  83   Fri Jun 20 09:49:11 2025 CLWSilicon detector setup description
  84   Mon Jun 23 09:36:32 2025 CLWExpected Spectra for Li and B in a 50 um Si detector

B looks as we are used to , Li tritons are now stopped in the detector and should appear around 2.8 MeV. 

  93   Wed Jul 16 13:56:00 2025 CLWLinks to photos and proton counting excel sheet

Photos setup

Excel Sheet 

  94   Fri Jul 18 12:04:36 2025 CLWPresence at CERN

Excel sheet for presence at CERN during 41Ca run. Please update if required. 

https://docs.google.com/spreadsheets/d/19OzH7bpnHb-YeOskNBGlrhEkPZmDsPDw9y0tleU0Soo/edit?gid=0#gid=0

  53   Fri Aug 11 08:41:31 2023 AnnieAl target & chamber set up

Phtotos of the front & back of the Al target and what it looked like once mounted and in the chamber.

  54   Fri Aug 11 09:11:04 2023 AnniePulse Settings
  55   Fri Aug 11 09:17:28 2023 AnnieLi target scans

Processed scans of both sides of the Li target showing the beam spot, and an image showing what it looks like to the eye.

  57   Fri Aug 11 10:12:02 2023 AnniePressure, voltage and current check
  58   Fri Aug 11 13:06:54 2023 AnnieSignal Spreadsheet info

Spreadhseet made for shifters to manually enter that they have checked each signal and that they can see gamma-flashes. It is saved as "26Al_EAR2_Signal_Checks.ods", it is located on the second monitor on the right of the control room, next to the monitor used to see the beam intensity (same monitor used to see signals).

It will stay open throughout the campeign. Shifters have been told to check signals more than just the once to record that they're okay, and there is a comments box for shifters to add any comments/issues that arises after they have recorde that they have checked the signals at least once.

ELOG V3.1.4-unknown