AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF
  AIDA, Page 35 of 46  ELOG logo
ID Date Author Subject Text Attachments
  237   Thu May 26 01:44:45 2016 Patrick Coleman-Smith[HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the files
Done. Awaiting test. See attachments 1-2.
 70.png71.png 
  236   Wed May 25 18:51:54 2016 Patrick Coleman-Smith[HowTo] Use the Multiplicity Trigger Firmware, V8.18, and update the filesThe attached firmware file, FEE_GF_Feb16_18.bin,
should be saved to /MIDAS/Aida and the FlashPgm.csh
file edited
 FEE_GF_Feb16_18.binDISC_25May16.zipLOCAL_tml_25May16.zip 
  235   Wed May 25 02:10:51 2016 TD, CGWednesday 25 May 201610.05 Recirculating chiller on
      FEE power on
      Detector bias on - ambient temp +23
 50.png51.png60.png 
  234   Tue May 24 08:28:28 2016 Patrick Coleman-Smith[HowTo] Save power if not using the Waveforms and restart the WaveformsThe USB controlled power Relays are near their
AC fuse operating limit which has caused
some Fuse failures.
  
  233   Tue May 24 07:12:30 2016 TD3x WDC WD30EFRX ATA 3Tb disks added to aidas1 LVM configuration
The 3x WDC WD30EFRX ATA 3Tb disks installed
in aidas1 in April 2015 (formerly /data20,
 9x 
  232   Tue May 24 06:39:17 2016 TD, CGper FEE64 waveforms
Attachments 1-30 per FEE64 ASIC #1 waveforms
 30x 
  231   Tue May 24 00:06:26 2016 TD24 May 2016Overnight. DAQ stopped. Detector bias off.
FEE power and recirculating chiller on.
 1.png2.png3.png4.png5.png 
  230   Mon May 23 17:21:29 2016 Patrick Coleman-Smith[HowTo] A solution to the problem of no SYNCsWhen starting Aida some FEE64 fail to provide
SYNC data , or any data for that matter,
on the ASIC data stream.
  
  229   Mon May 23 09:17:55 2016 Patrick Coleman-SmithMultiplicity Trigger SpecificationPlease read and comment on the attached
specification.
 Specification_for_the_multiplicity_Trigger_for_AIDA.pdf 
  228   Mon May 23 07:28:38 2016 TD23 May 201612.45 Rly16 'Sequence ALL On' operational

15.20 Startup remote control of CAEN N1419
 25x 
  227   Sat May 14 11:27:09 2016 AE, VP[How To] DAQ correlation monitor (June16 campaign)The program for online monitoring the correlation
of the DAQ systems (AIDA-EURICA-BigRIPS)
through a common scaler is SyncCheck (J.
 sync2.pngsync3.pngsync5.pngsync6.png 
  226   Fri May 13 13:27:50 2016 patrick Coleman-SmithPower supply changes and blowing fuses ! Reading about the power supply changes
and the requirement to replace fuses leads
me to be concerned.
  
  225   Fri May 13 13:24:42 2016 Patrick Coleman-SmithAn idea that might help when everything grinds to a haltWhen using the T9 system and running with
too much rate in one FEE64 so the system
is unbalanced.
  
  224   Fri May 13 06:18:53 2016 AE, VP, BMFriday May 13th11 am: Changed configuration of power source
for AIDA PSU (see paper logbook). Now both
cables with power for
 9x 
  223   Thu May 12 16:55:37 2016 AE, VP, BMThursday May 12Continued work on beta-trigger for EURICA.
However the system seems to have different
noise condition than before, which 
 7x 
  222   Thu May 12 15:50:48 2016 PatrickSystem Checks and firmware updateAdded two checks to the System wide checks.
Modified
the Firmware so the checks work properly.

One
check reads the status of the FEE64 clocks
 FEE_GF_Feb16_17.binCheck_12May16.zip 
  221   Wed May 11 11:24:09 2016 PatrickCorrelation ControlsPlease note that the Force Trigger and Reset
buttons  in the Correlation Browser only
have meaning if the FEE64 
  
  220   Wed May 11 06:37:32 2016 AE, VP, BMWednesday 11 May*2:30 pm*: changed power source of USB-controlled
power supply for FEEs. Now one of the power
cables is connected
 Eurica_timestamp.pngAIDA_timestamp.pngTimestamp_correlation_AIDA_EURICA.png 
  219   Wed May 11 06:01:16 2016 AE, VP, BMBeta triggerPlease find attached the best diagram of the
beta trigger logic circuit for EURICA campaign
2016
 Trigger_scheme-new.jpg 
  218   Wed May 11 06:00:56 2016 AE, VP, BM (Byul Moon)FEE64 <-> MACB trigger mappingHere is the mapping of the trigger output
of MAC-B modules to FEE64 modules
 dssd_layout.jpg 
ELOG V3.1.4-unknown