Tue Apr 26 10:06:59 2016, CG, PV & TD, Tuesday 26 April
|
2 (of 3) WD 3Tb ATA disk drives are not currently mounted on aidas1.
Attempted to mount them but found device names changed at each boot.
|
Tue Oct 25 02:06:34 2016, TD, Tuesday 25 October 13x
|
10.10 DAQ found stopped
Most recent file R81_169, last accessed 06.26
|
Tue Oct 24 03:16:07 2017, TD, OH, Tuesday 24 October 20x
|
11.16 DAQ continues
AIDA file Oct17/R8_107
|
Tue May 23 03:01:52 2017, CB, TD, NN, OH, Tuesday 23 May 19x
|
11.02 DAQ continues OK
Current file May2017/R22_192
|
Tue Feb 23 12:16:08 2016, TD, Tuesday 23 February 2016
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature +19.8 deg C
|
Tue Aug 23 01:49:01 2016, TD, Tuesday 23 August 18x
|
09.50 DAQ found stopped
No error messages merge/tapeserver - see attachments 1-2
|
Mon Nov 21 21:22:04 2016, TD, Tuesday 22 November 6x
|
05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html
06.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
|
Tue Mar 22 10:59:52 2016, TD : PJCS, Tuesday 22 March 7x
|
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.515uA, ambient temperature +19.8 deg C
|
Tue Nov 21 00:30:31 2017, TD, CB, Tuesday 21 November 20x
|
09.27 Detector biases & leakage currents OK - see attachments 1 & 2
FEE64 Temperatures OK - see attachment 3
DAQ statistics OK - see attachment 4
|
Tue Nov 21 13:56:59 2023, NH, CC, HA, MP, AM, VP, Tuesday 21 November 8x
|
Connect the BB7 on top of the snout to the former aida05 (FEE above aida01)
Also remove copper busbar that is unused
|
Tue Mar 21 08:04:43 2017, CG, OH, Tuesday 21 March - AIDA checks    
|
10.00 Powered system on and biased.
Bias voltages and leakage currents ok (see att. 1). Ambient temp @23.1oC.
|
Tue Apr 21 06:01:50 2015, CG, TD, Tuesday 21 April 2015 8x
|
21/04/15
1325: Recabled the MACB distribution tree as per PC-S instruction yesterday.
Now have nnaida5+6, 13+14 in MACB3 (nnaida5 in output 1) and nnaida3+4, 11+12 in MACB10 |
Tue Oct 2 01:55:11 2018, OH, TD, Tuesday 2 October 10x
|
09.54 DAQ continues OK - current file Sep18/R2_26
09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
|
Tue Feb 2 17:32:46 2016, CG, TD, Tuesday 2 February 2016 9x
|
Bias +200V, I_L +6.955uA, ambient temp +20.2 deg C
MSL type BB18(DS)-1000 2998-20
|
Tue Jan 19 18:09:53 2016, CG, TD, Tuesday 19 january 2016   
|
18.00 Swapped input cables to nnaida11 and nnaida14
both cables LH coupler + 2x 34-way Samtec ribbon cables + 3M 1245 1.4mil Copper screen w/ground wire
|
Tue Jun 19 06:08:03 2018, TD, Tuesday 19 June 2018
|
13.00
Julabo FL11006 chiller
|
Tue Oct 18 01:43:04 2016, TD, Tuesday 18 October 33x
|
09/42 DAQ found stopped, no merger error messages
Most recent file R52_211, last accessed 06.30
Restart merger OK
|
Tue Jun 18 08:03:20 2019, DK, Tuesday 18 June 16:00 - 24:00 15x
|
Shift change
16:00
|
Mon Jun 17 16:01:27 2019, CB, CG, OH, TD, Tuesday 18 June 00:00 - 16:00 34x
|
00:00 New day. The DAQ continues OK
Beam setting 2 for enhanced yield of Sn100
|
Tue May 16 03:18:46 2017, TD, OH, Tuesday 16 May 9x
|
11.19 DAQ continues OK
Current file May2017/R10_346
|