AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 10 of 44  ELOG logo
Entry  Sun Nov 4 04:31:49 2018, TD, Offline analysis R4 28x
Offline analysis of Oct18/R4_0 to _2

alpha background and pulser
Entry  Sun Nov 4 01:11:41 2018, CA, CB, TD, OH, PJW, Sunday 4 November 20x
10.03 DAQ continues OK - current file Oct18/R16_9
      FEE64 LEC/MEC slow comparator threshold 0x64
      beam background
Entry  Sat Nov 3 00:49:22 2018, TD, Offline analysis R15 - beam background 50.png51.png52.png54.png55.png
Offline analysis of Oct18/R15_0 to 7

Entry  Sat Nov 3 00:37:29 2018, CA, CB, TD, OH, Saturday 3 November 9x
09.37 DAQ continues OK - data transfer disabled
      FEE64 LEC/MEC slow comparator threshold 0xa
Entry  Fri Nov 2 01:56:00 2018, TD, [How To] Recover from unable to connect to nnaida ...  

If you obtain the 'unable to connect' from one, or more, of the FEE64s try the
following procedures *before* power-cycling/rebooting all of the FEE64s:
Entry  Fri Nov 2 01:19:49 2018, TD, Offline analysis R9 - alpha background 7x
 
Offline analysis of Oct18/R9_0 to 17 (c. 46h data)
Entry  Fri Nov 2 00:57:24 2018, CA, CB, TD, OH, Friday 2 November 14x
09.58 DAQ continues OK - current file Oct18/R15_6
      alpha background run
Entry  Thu Nov 1 00:24:23 2018, TD, OH, CA, Thursday 1 November 19x
09.24 DAQ continues OK - current file Oct18/R12_116
      alpha background run
Entry  Wed Oct 31 00:18:12 2018, TD, OH, CA, Wednesday 31 October 20x
09.18 DAQ continues OK - current file Oct18/R10_7
      alpha background run
Entry  Mon Oct 29 23:40:41 2018, TD, OH, CA, Tuesday 30 October 16x
08.40 DAQ continues OK - current file Oct18/R9_15

08.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Oct 28 23:34:28 2018, TD, OH, CA, Monday 29 October  15x
08.34 DAQ continues OK - current file Oct18/R9_6

08.37 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Oct 28 01:33:34 2018, CA, OH, Sunday 28 October 181028_0933_bias.png181028_0937_temp.png181028_1023_1.8.W.png181028_1024_layout8.png181028_1734_bias.png

09:33 DAQ still running, file R4_11. 
      Bias/leakage ok (attachment 1)
Entry  Sat Oct 27 01:22:43 2018, CA, OH, Saturday 27 October 181027_0927_bias.png181027_1004_temp.png181027_1410_temp.png181027_1409_bias.png
09:22 DAQ found crashed. Appears to have crashed at 20:23 last night whilst writing R3_0 to file.
      Run Control is non responsive
      Leakage currents okay - attachment 1
Entry  Fri Oct 26 03:28:10 2018, OH, CA, Friday 26 October 181026_1150_bias.png181026_1151_FEETemp.png181026_1334_Bias.png181026_1335_FEETemp.png181026_1400_Stats.png
October 25th:
In anticipation of losing access in the evening on arrival at RIKEN the following was done:
- Chiller was refilled
Entry  Wed Oct 3 10:47:06 2018, OH, Analysis of R2_0 -> R2_37 Alpha Run ExEy.pnghitPattern.pngxy.png
Data was analysed using offsets calculated based on pulser walkthroughs carried out in June 2018
Offsets appear to still be good. Ex V Ey plots - attachment 1
Entry  Wed Oct 3 07:09:03 2018, OH, TD, Current FEE Configuration Map October 3rd 2018 

             FEE Number
DSSD      A    B    C    D
Entry  Wed Oct 3 01:48:21 2018, OH, TD, Wednesday 3 October 30x
09.42 DAQ continues OK - current file Sep18/R2_36

09.42 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Tue Oct 2 01:55:11 2018, OH, TD, Tuesday 2 October 10x
09.54 DAQ continues OK - current file Sep18/R2_26

09.55 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Mon Oct 1 01:10:57 2018, OH, TD, Monday 1 October 10x
09.10 DAQ continues OK - current file Sep18/R2_16

09.15 all system wide checks OK *except* nnaida7 fails ADC calibration
Entry  Sun Sep 30 01:48:27 2018, OH, TD, Current link to Google sheets leakage current log 
https://docs.google.com/spreadsheets/d/12hgbrywB10hGsKt5uc2HnLfZymh8_uvM6cEASbbqnBE/edit?pli=1#gid=282765719
ELOG V3.1.4-unknown