AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 10 of 46  ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
  ID Date Author Subjectdown Text Attachments
  188   Tue Apr 26 10:06:59 2016 CG, PV & TDTuesday 26 April
2 (of 3) WD 3Tb ATA disk drives are not currently
mounted on aidas1.
  
  402   Tue Oct 25 02:06:34 2016 TDTuesday 25 October10.10 DAQ found stopped
      Most recent file R81_169, last accessed
06.26
 13x 
  682   Tue Oct 24 03:16:07 2017 TD, OHTuesday 24 October11.16 DAQ continues
      AIDA file Oct17/R8_107
 20x 
  590   Tue May 23 03:01:52 2017 CB, TD, NN, OHTuesday 23 May11.02 DAQ continues OK 
      Current file May2017/R22_192
 19x 
  159   Tue Feb 23 12:16:08 2016 TDTuesday 23 February 2016MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.570uA, ambient temperature
+19.8 deg C
 60.png 
  346   Tue Aug 23 01:49:01 2016 TDTuesday 23 August
09.50 DAQ found stopped
      No error messages merge/tapeserver
 18x 
  462   Mon Nov 21 21:22:04 2016 TDTuesday 22 November 05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html

06.20 DSSSD bias & leakage currents OK -
 6x 
  182   Tue Mar 22 10:59:52 2016 TD : PJCSTuesday 22 MarchMSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=5.515uA, ambient temperature
+19.8 deg C
 7x 
  707   Tue Nov 21 00:30:31 2017 TD, CBTuesday 21 November09.27 Detector biases & leakage currents OK
- see attachments 1 & 2
      FEE64 Temperatures OK - see attachment
 20x 
  925   Tue Nov 21 13:56:59 2023 NH, CC, HA, MP, AM, VPTuesday 21 NovemberConnect the BB7 on top of the snout to the
former aida05 (FEE above aida01)
Also remove copper busbar that is unused
 8x 
  533   Tue Mar 21 08:04:43 2017 CG, OHTuesday 21 March - AIDA checks10.00 Powered system on and biased.
      Bias voltages and leakage currents
ok (see att. 1). Ambient temp @23.1oC.
 bias1.pnglayout4.pngnnaida19.pnglayout3.pngnnaida13.png 
  62   Tue Apr 21 06:01:50 2015 CG, TDTuesday 21 April 201521/04/15
1325: Recabled the MACB distribution
tree as per PC-S instruction yesterday.
 8x 
  746   Tue Oct 2 01:55:11 2018 OH, TDTuesday 2 October09.54 DAQ continues OK - current file Sep18/R2_26

09.55 all system wide checks OK *except*
 10x 
  148   Tue Feb 2 17:32:46 2016 CG, TDTuesday 2 February 2016Bias +200V, I_L +6.955uA, ambient temp +20.2
deg C
 9x 
  141   Tue Jan 19 18:09:53 2016 CG, TDTuesday 19 january 2016
18.00 Swapped input cables to nnaida11 and
nnaida14
 1.png2.png3.png4.png 
  713   Tue Jun 19 06:08:03 2018 TDTuesday 19 June 201813.00

Julabo FL11006 chiller
  
  391   Tue Oct 18 01:43:04 2016 TDTuesday 18 October09/42 DAQ found stopped, no merger error messages
      Most recent file R52_211, last accessed
06.30
 33x 
  852   Tue Jun 18 08:03:20 2019 DKTuesday 18 June 16:00 - 24:00Shift change

16:00 
 15x 
  851   Mon Jun 17 16:01:27 2019 CB, CG, OH, TDTuesday 18 June 00:00 - 16:0000:00 New day. The DAQ continues OK

      Beam setting 2 for enhanced yield of
 34x 
  568   Tue May 16 03:18:46 2017 TD, OHTuesday 16 May11.19 DAQ continues OK 
      Current file May2017/R10_346
 9x 
ELOG V3.1.3-7933898