Entry  Thu Aug 3 14:16:12 2023, TD, Thursday 3 August contd. 21x

15.16 DSSSD bias +100V leakage current +8.415uA
Entry  Thu Aug 3 09:21:26 2023, TD, Thursday 3 August 47x

10.20 DSSSD bias +100V leakage current +6.565uA - attachment 1
Entry  Thu Sep 29 03:20:38 2016, TD & CG, Thursday 29 September  15x
11.20 R1 stops

      DSSSD bias/leakage current OK - see attachments 1-2
Entry  Thu Jun 28 02:19:30 2018, OH, Thursday 28th June 180628_1018_bias.png180628_1249_bias.png180628_1922_FEE29ASIC2.png
10:18 Bias and leakage currents ok - attachment 1
      FEE Temperatures ok
      System wide checks all ok
Entry  Thu Sep 28 16:03:40 2023, TD, Thursday 28 September 10x

17.00 USB-controlled ac mains relay - no water interlock ( yellow ) LED
      Water temperature ( station outside S4 entrance ) c. 19 deg C and pressure OK
Entry  Thu Oct 27 10:54:14 2016, TD, Thursday 27 October  1.png2.png3.png
14.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachment 3
Entry  Wed Oct 25 18:36:46 2017, TD, OH, Thursday 26 October 28x
02.37 DAQ stalled - USB-controlled ac mains relay fuse blown
      Not writing to disk
Entry  Thu May 26 03:46:41 2016, TD, AE & CG, Thursday 26 May 2016 72.pngstartup.tcl
11.45 AIDA discriminator rates - see attachment 1
      Today's rates similar to yesterday's rates 
Entry  Thu May 25 02:11:04 2017, CB, TD, Thursday 25 May 10x
10.10 DAQ continues OK 
      Current file May2017/R26_17
Entry  Thu Aug 25 02:10:10 2016, TD, Thursday 25 August 21x
11.40 R9 continues

      ASIC settings 2016Aug20-15.34.53
Entry  Thu Nov 24 01:07:14 2016, TD, CG, Thursday 24 November 29x
10.05 DSSSD bias & leakage currents OK - see attachments 1 & 2
      note - the significant increase observed yesterday appears to be plateau'ing
      FEE64 temperatures OK - see attachment 3
Entry  Thu Mar 23 10:56:29 2017, CG, OH, Thursday 23rd March - DSSD replacement + move 7x

10.00 Investigating DSSD2 (MSL BB18-1000 3058-9) missing channels, found broken bond wires on rear side (~1/4).
      Replaced with 3058-3.
Entry  Thu Apr 23 10:27:59 2015, CG, AE, TD, Thursday 23rd April progress IMG_2846.JPGIMG_2847.JPGIMG_2848.JPGIMG_2849.JPG
23/04/15
1800: Spent majority of the day moving AIDA forward and into EURICA.
          So far everything seems to fit very well, we have just noticed a few points of possible
Entry  Thu Nov 23 00:41:43 2017, TD, CB, Thursday 23 November  10x
09.33 Detector biases & leakage currents OK - see attachments 1 & 2
      FEE64 Temperatures OK - see attachment 3
      DAQ statistics OK - see attachment 4
Entry  Fri Apr 24 08:11:04 2015, CG, AE & TD, Thursday 23 April 2015 contd IMG_2850.JPG

Image of interior of closed EURICA array with AIDA inserted.
Entry  Thu Jun 21 02:31:49 2018, TD, OH, Thursday 21 June 30.png31.png32.png33.png34.png
10.20 DAQ continues OK

10.29 DAQ stop June18/R1
Entry  Thu Oct 20 01:30:10 2016, TD, Thursday 20 October 12x
09.30 DAQ found stopped, no merger error messages
      Most recent file R63_291, last accessed 06.46
Entry  Thu Jun 20 02:37:55 2019, CA, CB, TD, CG, DK, Thursday 20 June 23x
10.37 Post - beam, AIDA & DTAS run only
      DTAS stop run 164
      AIDA file R2_1012
Entry  Thu Nov 2 01:56:18 2017, TD, OH, Thursday 2 November  16x
10.56 DAQ running OK - data transfer not enabled

      BNC PB-4
Entry  Thu Jun 2 01:33:13 2016, TD, AE, CG & DK, Thursday 2 June 2016 1.png2.png3.png4.png5.png

09.30 DAQ left running overnight
      AIDA SYNCs on all FEE64s this morning 