Entry  Thu Oct 19 01:40:35 2017, TD, OH, Thursday 19 October 35x

09.40 DAQ continues OK
      File /TapeData/Oct17/R1_280
    Reply  Thu Oct 19 11:32:29 2017, TD, OH, Thursday 19 October 

> 09.40 DAQ continues OK
>       File /TapeData/Oct17/R1_280
Entry  Thu Oct 19 10:39:20 2023, NH, Thursday 19 October 10x
Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE 
Entry  Thu May 18 02:16:05 2017, CB, TD, OH, Thursday 18 May 10x
10.10 DAQ continues OK 
      Current file May2017/R10_346
Entry  Thu Feb 18 10:23:48 2016, TD, Thursday 18 February 19x
MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature +20.1 deg C
 
Entry  Sat Nov 19 02:43:39 2016, TD, Thursday 17 November 1.png2.png3.png4.png

10.15 DSSSD bias & leakage currents OK - see attachments 1 & 2
      FEE64 temperatures OK - see attachments 3 & 4
Entry  Thu May 16 02:13:10 2019, CA, OH, TD, Thursday 16th May 16x
10:13 all system wide checks OK *except* nnaida7 fails ADC calibration

      FEE64 temperatures OK - see attachment 1
Entry  Thu Jun 16 03:40:43 2016, TD, Thursday 16 June 2016 70.png71.png72.png74.png75.png
10.40 DAQ stalled AIDA75_30 c. 01.36

      SYNC errors since baseline (start of AIDA75) - attachment 1
Entry  Thu Nov 15 06:52:09 2018, OH, Thursday 15th November 16:00 - 24:00 11x
15:51 DAQ continues - AIDA file RIBF148/R5_664
      165Pm BigRIPS setting + 2.8mm Al degrader
Entry  Wed Nov 14 22:54:11 2018, LS, Thursday 15th November 08:00 - 16:00 10x

08.10 BRIKEN stop
      AIDA file RIBF148/R5_587
Entry  Wed Nov 14 14:46:47 2018, CA, Thursday 15th November 00:00 - 08:00 25x
23.58 DAQ continues ok (RIBF148/R5_505)

00.09 system wide checks ok, except nnaida7 ADC calibration failure
Entry  Thu Jun 15 02:56:32 2017, TD, OH, Thursday 15 June 18x
10.52 DAQ continues
      AIDA file RIBF148/R8_39
Entry  Thu Oct 13 06:07:43 2016, TD & CG, Thursday 13 October 1.png2.png3.png4.png5.png

11.40 Power cycle AIDA FEE64s
      Set TS_SYNC_PHASE 0
Entry  Thu Jun 13 00:30:17 2019, CA, CB, TD, CG, OH, DK, Thursday 13 June 18x
08.32 Julabo FL11006 chiller set point +20 deg C actual +20.0 deg C
      Water level c. 70% M-H markers + 0.5 jugful -> c. 80% M-H markers
      Temperature +24.0 deg C dew point +9.6 deg C RH 39.0%
Entry  Thu Oct 12 13:02:50 2023, TD, Thursday 12 October contd. 50x

      ASIC settings 2021Apr29-13-16-00
      slow comparator 0xa ( all p+n junction FEE64s ) and 0xf ( all n+n Ohmic FEE64s )
Entry  Thu Oct 12 09:12:34 2023, TD, Thursday 12 October 47x
10.10 Water flow & temp OK
      Power ON
Entry  Thu May 11 05:43:30 2017, TD, OH, Thursday 11 May 16x
13.43 DAQ continues OK 
      Current file May2017/R6_123
Entry  Thu Nov 10 12:02:24 2016, TD, OH, CG, Thursday 10 November 30.png31.png32.png34.png

21.17 DAQ starts (R30)
Entry  Thu Sep 1 03:45:34 2016, TD, Thursday 1 September 28x
13.33 R11 starts

      ASIC settings 2016Aug20-15.34.53
Entry  Thu Nov 1 00:24:23 2018, TD, OH, CA, Thursday 1 November 19x
09.24 DAQ continues OK - current file Oct18/R12_116
      alpha background run