| |
ID |
Date |
Author |
Subject |
Text |
 |
|
|
675
|
Thu Oct 19 01:40:35 2017 |
TD, OH | Thursday 19 October |
09.40 DAQ continues OK
File /TapeData/Oct17/R1_280
|
35x |
|
|
676
|
Thu Oct 19 11:32:29 2017 |
TD, OH | Thursday 19 October | >
> 09.40 DAQ continues OK
> File /TapeData/Oct17/R1_280
|
|
|
|
910
|
Thu Oct 19 10:39:20 2023 |
NH | Thursday 19 October | Water Temp: 20 C - Flow felt on pipe
AIDA interlock OVERRIDE
|
10x |
|
|
571
|
Thu May 18 02:16:05 2017 |
CB, TD, OH | Thursday 18 May | 10.10 DAQ continues OK
Current file May2017/R10_346
|
10x |
|
|
154
|
Thu Feb 18 10:23:48 2016 |
TD | Thursday 18 February | MSL type BB18(DS)-1000 serial 2998-22
Bias +200V, I_L +=6.200uA, ambient temperature
+20.1 deg C
|
19x |
|
|
458
|
Sat Nov 19 02:43:39 2016 |
TD | Thursday 17 November |
10.15 DSSSD bias & leakage currents OK -
see attachments 1 & 2
|
   |
|
|
801
|
Thu May 16 02:13:10 2019 |
CA, OH, TD | Thursday 16th May | 10:13 all system wide checks OK *except* nnaida7
fails ADC calibration
|
16x |
|
|
316
|
Thu Jun 16 03:40:43 2016 |
TD | Thursday 16 June 2016 | 10.40 DAQ stalled AIDA75_30 c. 01.36
SYNC errors since baseline (start of |
    |
|
|
786
|
Thu Nov 15 06:52:09 2018 |
OH | Thursday 15th November 16:00 - 24:00 | 15:51 DAQ continues - AIDA file RIBF148/R5_664
165Pm BigRIPS setting + 2.8mm Al degrader
|
11x |
|
|
785
|
Wed Nov 14 22:54:11 2018 |
LS | Thursday 15th November 08:00 - 16:00 |
08.10 BRIKEN stop
AIDA file RIBF148/R5_587
|
10x |
|
|
784
|
Wed Nov 14 14:46:47 2018 |
CA | Thursday 15th November 00:00 - 08:00 | 23.58 DAQ continues ok (RIBF148/R5_505)
00.09 system wide checks ok, except nnaida7 |
25x |
|
|
662
|
Thu Jun 15 02:56:32 2017 |
TD, OH | Thursday 15 June | 10.52 DAQ continues
AIDA file RIBF148/R8_39
|
18x |
|
|
384
|
Thu Oct 13 06:07:43 2016 |
TD & CG | Thursday 13 October |
11.40 Power cycle AIDA FEE64s
Set TS_SYNC_PHASE 0
|
    |
|
|
839
|
Thu Jun 13 00:30:17 2019 |
CA, CB, TD, CG, OH, DK | Thursday 13 June | 08.32 Julabo FL11006 chiller set point +20
deg C actual +20.0 deg C
Water level c. 70% M-H markers + 0.5 |
18x |
|
|
907
|
Thu Oct 12 13:02:50 2023 |
TD | Thursday 12 October contd. |
ASIC settings 2021Apr29-13-16-00
slow comparator 0xa ( all p+n junction |
50x |
|
|
906
|
Thu Oct 12 09:12:34 2023 |
TD | Thursday 12 October | 10.10 Water flow & temp OK
Power ON
|
47x |
|
|
562
|
Thu May 11 05:43:30 2017 |
TD, OH | Thursday 11 May | 13.43 DAQ continues OK
Current file May2017/R6_123
|
16x |
|
|
451
|
Thu Nov 10 12:02:24 2016 |
TD, OH, CG | Thursday 10 November |
21.17 DAQ starts (R30)
|
   |
|
|
353
|
Thu Sep 1 03:45:34 2016 |
TD | Thursday 1 September | 13.33 R11 starts
ASIC settings 2016Aug20-15.34.53
|
28x |
|
|
756
|
Thu Nov 1 00:24:23 2018 |
TD, OH, CA | Thursday 1 November | 09.24 DAQ continues OK - current file Oct18/R12_116
alpha background run
|
19x |