Thu Nov 3 02:29:45 2016, TD, [How To] Startup AIDA (October 2016) 29x
|
Assumes 3-phase ac power (to Julabo FL11006 recirculating chiller) and single-phase ac power
(to AIDA NIM bins, PSUs, network switches, USB-controlled ac mains relay and Raspberry Pi)
is connected and switched on.
|
Tue Nov 8 00:12:56 2016, TD, Report - medium - TapeServer changes volume name following request for existing filename
|
When you request a filename that already exists and select OK to the prompt
suggesting a new filename, TapeServer adds an additional character to the
|
Wed Nov 9 09:50:50 2016, TD, NP1412 R20, R21   
|
DAQ start (R20) failed - nnaida5 dropped data transfer #1 link
|
Thu Nov 10 11:57:35 2016, TD, Data directory NP1412 renamed as RIBF123R1
|
Data directory NP1412 renamed as RIBF123R1
|
Fri Nov 11 00:50:00 2016, TD, Friday 11 November 11x
|
10.00 DAQ continues (R33) in no storage mode
DSSSD bias & leakage currents OK - see attachments 1 & 2
|
Sat Nov 12 01:45:00 2016, TD, Saturday 12 November 6x
|
10.45 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
|
Mon Nov 14 05:51:36 2016, TD, Monday 14 November  
|
14.51 DSSSD bias & leakage currents OK - see attachments 1 & 2
Ambient temperature +24.8 deg C, d.p. +7.2 deg C, RH 32.6%
|
Tue Nov 15 02:22:25 2016, TD, Tuesday 15 November 7x
|
11.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachment 3
|
Wed Nov 16 06:47:02 2016, TD, Analysis of data files R25_11 to _13    
|
Offline analysis of R25_11 to _13 see http://ribf-exp.riken.jp/elog/RIBF123/141
"F5 C target F7 no F11 C 6mm
|
Sat Nov 19 02:43:39 2016, TD, Thursday 17 November   
|
10.15 DSSSD bias & leakage currents OK - see attachments 1 & 2
FEE64 temperatures OK - see attachments 3 & 4 |
Mon Nov 21 21:22:04 2016, TD, Tuesday 22 November 6x
|
05.59 M7.3 Fukushima-ken Oki (locally 4) http://www.jma.go.jp/en/quake/20161122060517493-220559.html
06.20 DSSSD bias & leakage currents OK - see attachments 1 & 2
|
Tue Nov 22 12:24:48 2016, TD, Analysis of R25_11 to R25_23 20x
|
Offline analysis of AIDA data files R25_11 to R25_23 using MIDASsort
Note
|
Fri Nov 25 07:33:44 2016, TD, Friday 25 November 9x
|
16.35 DSSSD bias & leakage currents OK - see attachments 1 & 2
note - the significant increase observed yesterday appears to be plateau'ing
FEE64 temperatures OK - see attachment 3
|
Fri Nov 25 22:28:13 2016, TD, [How to] Start MIDASsort
|
aidas1> setenv MIDASBASE /MIDAS@aidas.240215
aidas1> setenv PATH $MIDASBASE/bin_Linux64:$PATH
|
Sat Nov 26 07:26:51 2016, TD, [How to] Desktop application launchers for Httpd for Data Acquisition & Merge/TapeServer, Merger & TapeServer
|
Type: Application in Terminal
Name: Httpd for Data Acquisition
|
Sat Nov 26 17:14:47 2016, TD, Visual scaler inputs
|
Visual scaler inputs
1 F11
|
Sun Nov 27 03:25:20 2016, TD, [How to] AIDA discriminator thresholds
|
The function and setting of the AIDA discriminators is as follows:
LEC (20MeV FSR) MEC (1GeV FSR) HEC (20GeV FSR) Function
|
Sun Nov 27 05:30:51 2016, TD, Offline analysis of R12   
|
Offline analysis of R12 LEC -> MEC setting
S O R T C O M P L E T E ..... Sun Nov 27 14:37:35 2016
|
Sun Nov 27 12:53:04 2016, TD, Offline analysis R24_3   
|
S O R T C O M P L E T E ..... Sun Nov 27 20:32:48 2016
|
Mon Nov 28 11:55:20 2016, TD, Offline analysis R30_2  
|
Degrader (8mm Al) fixed + ( 0.3mm W/1mm Al + 1mm W/1mm Al)
S O R T C O M P L E T E ..... Mon Nov 28 20:53:02 2016
|