AIDA GELINA BRIKEN nToF CRIB ISOLDE CIRCE nTOFCapture DESPEC DTAS EDI_PSA 179Ta CARME StellarModelling DCF K40
  AIDA, Page 22 of 46  ELOG logo
Entry  Sun Jul 16 09:36:40 2023, TD, 15-16 July 2023 40x

Saturday 15 July
Entry  Sun Jul 16 14:20:31 2023, TD, Sunday 16 July contd. 27x
15.20 All ERNI pins of aida01 adaptor PCB OK => FEE64 #1 ASIC #2 channel #5 issue faulty test C? faulty ASIC channel?

      Fitted drain wire from aida06 & aida08 adaptor PCBs to FEE64 cooling plates
Entry  Sat Jul 22 08:17:48 2023, TD, Saturday 22 July 26x
09.20 CAEN N1419ET 
      Floating outputs
      Channel #3 + polarity, Channels #0-2 - polarity
Entry  Sun Jul 23 08:50:48 2023, TD, Sunday 23 July 19x
09.50 Cooknell HV2
      2x + polarity, grounded HV channels
Entry  Mon Jul 24 08:39:39 2023, TD, aida10 sys console output & aida10 options sys_console_aida10.txtScreenshot_from_2023-07-24_09-48-03.png
Options and system cosnole disagree about which version of the DataAcq program is in use?
Entry  Mon Jul 24 08:54:48 2023, TD, Monday 24 July 17x

09.54 DSSSD#1 bias +100V leakage current +9.065uA
Entry  Mon Jul 31 09:43:37 2023, TD, Monday 31 July 44x

10.43 DSSSD bias +100V leakage current +7.550uA
Entry  Tue Aug 1 08:50:36 2023, TD, Tuesday 1 August 30x

09.50 DSSSD bias +100V leakage current +9.255uA - attachment 2
Entry  Wed Aug 2 08:44:00 2023, TD, Wednesday 2 August 48x

09.40 Al snout electrically connected ( < 1 Ohm ) to Al gasket and Al base plate
      Al snout electrically isolated ( > 20 MOhm ) from aida02 FEE64 adaptor PCB and AIDA support frame
Entry  Wed Aug 2 15:39:52 2023, TD, Wednesday 2 August contd. 11x
16.22 Add LK1 to aida01
      DSSSD bias -100V leakage current -7.950uA
Entry  Thu Aug 3 09:21:26 2023, TD, Thursday 3 August 47x

10.20 DSSSD bias +100V leakage current +6.565uA - attachment 1
Entry  Thu Aug 3 14:16:12 2023, TD, Thursday 3 August contd. 21x

15.16 DSSSD bias +100V leakage current +8.415uA
Entry  Fri Aug 4 09:07:08 2023, TD, Friday 4 August 23x

07.00 DAQ stopped
      Overnight run for background alphas
Entry  Fri Aug 4 10:04:58 2023, TD, Friday 4 August contd. 17x

10.45 Power cycle and reboot
Entry  Sat Aug 19 14:52:42 2023, TD, BNC PB-4 & BNC PB-5 pulser test - JCMB 18.8.23 21x
BNC PB-4 - see attachment 1

Amplitude 35,000
Entry  Sun Aug 20 16:21:45 2023, TD, Silena 7710 HV test - JCMB 20.8.23 6x
Silena 7710 - see attachment 1

Bias -60V
Entry  Mon Aug 21 13:17:54 2023, TD, Silena 7710 HV test - JCMB 21.8.23  11x
Silena 7710 - see attachment 1

Bias -60V
Entry  Wed Aug 30 15:30:50 2023, TD, Test of AIDA ASIC mezzanines with FEE64s - summary 13x
Test of ( previously bench-tested OK ) AIDA ASIC mezzanines using FEE64 nnlycca5 ( MAC d8:80:39:41:d7:c3 )

AIDA test station STFC DL, T9 - see attachments 12-13
Entry  Thu Aug 31 15:01:11 2023, TD, Test of CAEN N1419B - T9, STFC DL 7x

Noise test of CAEN N1419B in T9, STFC DL.
Entry  Thu Sep 28 16:03:40 2023, TD, Thursday 28 September 10x

17.00 USB-controlled ac mains relay - no water interlock ( yellow ) LED
      Water temperature ( station outside S4 entrance ) c. 19 deg C and pressure OK
ELOG V3.1.3-7933898